Quarterly Activities Report

Source: RNS
RNS Number : 1944N
BHP Group Limited
19 January 2023
 

Release Time

IMMEDIATE

Date

19 January 2023

Release Number

1/23

BHP OPERATIONAL REVIEW
FOR THE HALF YEAR ENDED 31 DECEMBER 2022

 

·  We remained fatality free at our operated assets for the fourth consecutive year and continued to deliver reliable operational performance during the quarter.

·   Western Australia Iron Ore (WAIO) achieved record production of 146 Mt (100% basis) for the half year.

·   Production guidance for the 2023 financial year remains unchanged, with Escondida and BHP Mitsubishi Alliance (BMA) trending to the low end of their respective guidance ranges.

·   Full year unit cost guidance1 for Escondida and WAIO remains unchanged. Unit cost guidance for BMA and New South Wales Energy Coal (NSWEC) has been increased, largely reflecting production impacts from significant wet weather and inflationary pressures.

·   BHP entered into a Scheme Implementation Deed with OZ Minerals Ltd (OZL) to acquire 100% of OZL by way of a scheme arrangement for a cash price of A$28.25 per OZL share.

BHP Chief Executive Officer, Mike Henry:

"BHP delivered safe and reliable operating performance in the first half of the 2023 financial year. Employees and contractors across BHP continued to prioritise safety, resulting in the fourth consecutive year without a fatality.

WA Iron Ore (WAIO) delivered record production for the half year through strong supply chain performance, supported by the ongoing ramp-up at South Flank. Copper production at Escondida rose despite road blockades in Chile in the December quarter and the Spence Growth Option continued to ramp up, while Olympic Dam's ongoing smelter performance saw near-record material processing and record gold production. In Queensland, coal production was again impacted by heavy rainfall. As foreshadowed, we are seeing the impact of inflation across our global supply chains and continue to focus on productivity and controllable costs.

BHP believes China will be a stabilising force when it comes to commodity demand in the 2023 calendar year, with OECD nations experiencing economic headwinds. China's pro-growth policies, including in the property sector, and an easing of COVID-19 restrictions are expected to support progressive improvement from the difficult economic conditions of the first half. China is expected to achieve its fifth straight year of over 1 billion tonnes of steel production.

During the quarter, we continued to progress a number of growth pathways to shape our portfolio toward future facing commodities and reduce our operational emissions. In December 2022, BHP's scheme implementation deed to acquire 100% of Australian copper producer OZ Minerals received unanimous support from the OZ Minerals Board ahead of a shareholder vote in the coming months."

                                                                                                    1

Production

 

Dec H22

(vs Dec H21)

 

Dec Q22

(vs Sep Q22)

 

Dec Q22 vs Sep Q22 commentary

 

Copper (kt)

834.4
12%

424.3
3%

Higher volumes at Escondida due to higher throughput, higher concentrate volumes at Spence reflecting the ramp up of the Spence Growth Option, and strong volumes at Olympic Dam as a result of planned refinery maintenance in the prior period.

Iron ore (Mt)

132.0
2%

66.9
3%

Record production at WAIO in the month of December 2022 due to strong supply chain performance and reduced impacts of labour constraints and wet weather.

Metallurgical coal (Mt)

13.6
5%

7.0
4%

Higher volumes due to improved strip ratios and the planned longwall move at Broadmeadow in the prior period, partially offset by continued significant wet weather.

Energy coal (Mt)

5.5
(24%)

2.9
9%

Higher volumes due to improved operating conditions, including less significant wet weather impacts and reduced labour shortages in the December 2022 quarter, partially offset by planned wash plant maintenance completed in November 2022.

Nickel (kt)

38.4
(2%)

17.7
(14%)

Lower volumes due to planned maintenance at the smelter and refinery.


Summary

Operational performance

Production and guidance are summarised below.

Production

 

Dec

H22

 

Dec

Q22

 

Dec H22

vs

Dec H21

 

Dec Q22

vs

Dec Q21

 

Dec Q22

vs

Sep Q22

 

Previous

FY23

guidance

 

Current

FY23

guidance

 


Copper (kt)

834.4

424.3

12%

16%

3%

1,635 - 1,825

1,635 - 1,825


  Escondida (kt)

510.7

258.0

5%

5%

2%

1,080 - 1,180

1,080 - 1,180

Low end

  Pampa Norte (kt)

147.3

76.7

8%

12%

9%

240 - 290

240 - 290

Unchanged

  Olympic Dam (kt)

104.1

54.4

138%

283%

9%

195 - 215

195 - 215

Unchanged

  Antamina (kt)

72.3

35.2

(3%)

(8%)

(5%)

120 - 140

120 - 140

Unchanged

Iron ore (Mt)

132.0

66.9

2%

1%

3%

249 - 260

249 - 260


  WAIO (Mt)

129.7

65.8

2%

1%

3%

246 - 256

246 - 256

Unchanged

  WAIO (100% basis) (Mt)

146.4

74.3

1%

1%

3%

278 - 290

278 - 290

Unchanged

  Samarco (Mt)

2.2

1.1

8%

6%

(5%)

3 - 4

3 - 4

Unchanged

Metallurgical coal - BMA (Mt)

13.6

7.0

5%

10%

4%

29 - 32

29 - 32


  BMA (100% basis) (Mt)

27.2

13.9

5%

10%

4%

58 - 64

58 - 64

Low end

Energy coal - NSWEC (Mt)

5.5

2.9

(24%)

(4%)

9%

13 - 15

13 - 15

Unchanged

Nickel (kt)

38.4

17.7

(2%)

(18%)

(14%)

80 - 90

80 - 90

Unchanged

Summary of disclosures

BHP expects its financial results for the half year ended 31 December 2022 to reflect certain items as summarised in the table below. The table does not provide a comprehensive list of all items impacting the period. The financial statements are the subject of ongoing work that will not be finalised until the release of the financial results on 21 February 2023. Accordingly, the information in the table below contains preliminary information that is subject to update and finalisation.

                                                                                                                  3

Description

H1 FY23
impact
US$Mi

Classificationii

Unit costs for the December 2022 half year at Escondida are expected to be towards the upper end of full year guidance; unit costs at WAIO, BMA and NSWEC are expected to be above full year guidance (at guidance exchange rates)

Note: weaker Australian dollar and Chilean peso than guidance rates in the periodiii

-

Operating costs

For the 2023 financial year, unit costs at WAIO and Escondida are tracking towards the upper end of full year guidance (at guidance exchange rates)

Unit cost guidance for BMA has been increased to between US$100 and US$105 per tonne (at guidance exchange rates) reflecting full year volumes tracking to the low end of production guidance due to significant wet weather, inventory movements and inflationary pressures

Unit cost guidance for NSWEC has been increased to between US$84 and US$91 per tonne (at guidance exchange rates) reflecting production impacts from record wet weather, inflationary pressures and price-linked logistics costs

-

Operating costs

Exploration expense

127

Exploration expense

The Group's adjusted effective tax rate for H1 FY23 is expected to be slightly below the full year guidance range of 30 to 35 per cent

-

Taxation expense

Working capital movements relating to royalties, net price impacts on receivables and payables, and other movements

1,000-1,400

↓ Operating cash flow

Settlement of derivative related to the funding of the final FY22 dividend (note: together with the payment of US$8.7 billion reported in financing cash outflow, the combined payment of US$8.9 billion represents the final dividend determined on 16 August 2022 in the financial results for the year ended 30 June 2022)

~210

↓ Operating cash flow

Additional net proceedsiv received from the sale of BHP's 80 per cent interest in BMC

74

↑ Investing cash flow

Dividends paid to non-controlling interests

527

↓ Financing cash flow

Financial impact on BHP Brasil of the Samarco dam failure

The financial impact is expected to primarily relate to amortisation of discounting on the provision and the impact of foreign exchange

Refer footnotev

Exceptional item

 

i     Numbers are not tax effected, unless otherwise noted.

ii    There will be a corresponding balance sheet, cash flow and/or income statement impact as relevant, unless otherwise noted.

iii   Average exchange rates for H1 FY23 of AUD/USD 0.67 (guidance rate AUD/USD 0.72) and USD/CLP 920 (guidance rate USD/CLP 830).

iv   Second purchase price instalment offset by working capital adjustments.

v    Financial impact is the subject of ongoing work and is not yet finalised. See corporate update section for further information on Samarco.

     

Average realised prices

The average realised prices achieved for our major commodities are summarised below.

Average realised pricesi

Dec H22

Dec H21

Jun H22

FY22

Dec H22
vs
Dec H21

Dec H22
vs
Jun H22

Dec H22
vs
FY22

Copper (US$/lb)

3.49

4.31

4.02

4.16

(19%)

(13%)

(16%)

Iron ore (US$/wmt, FOB)

85.46

113.54

112.65

113.10

(25%)

(24%)

(24%)

Metallurgical coal (US$/t)

268.73

259.71

423.82

347.10

3%

(37%)

(23%)

Hard coking coal (US$/t)ii

270.65

278.60

437.60

366.82

(3%)

(38%)

(26%)

Weak coking coal (US$/t)ii

252.12

218.65

382.56

296.51

15%

(34%)

(15%)

Thermal coal (US$/t)iii

354.30

137.68

302.60

216.78

157%

17%

63%

Nickel metal (US$/t)

24,362

19,651

27,399

23,275

24%

(11%)

5%

i     Based on provisional, unaudited estimates. Prices exclude sales from equity accounted investments, third party product and internal sales, and represent the weighted average of various sales terms (for example: FOB, CIF and CFR), unless otherwise noted. Includes the impact of provisional pricing and finalisation adjustments.

ii    Hard coking coal (HCC) refers generally to those metallurgical coals with a Coke Strength after Reaction (CSR) of 35 and above, which includes coals across the spectrum from Premium Coking to Semi Hard Coking coals, while weak coking coal (WCC) refers generally to those metallurgical coals with a CSR below 35.

iii   Includes thermal coal sales from metallurgical coal mines.

4

The large majority of iron ore shipments were linked to index pricing for the month of shipment, with price differentials predominantly a reflection of market fundamentals and product quality. Iron ore sales for the December 2022 half year were based on an average moisture rate of 6.8 per cent. The large majority of metallurgical coal and energy coal exports were linked to index pricing for the month of scheduled shipment or priced on the spot market at fixed or index-linked prices, with price differentials reflecting product quality. The large majority of copper cathodes sales were linked to index price for quotation periods one month after month of shipment, and three to four months after month of shipment for copper concentrates sales with price differentials applied for location and treatment costs.

At 31 December 2022, the Group had 319 kt of outstanding copper sales that were revalued at a weighted average price of US$3.80 per pound. The final price of these sales will be determined over the remainder of the 2023 financial year. In addition, 354 kt of copper sales from the 2022 financial year were subject to a finalisation adjustment in the current period. The provisional pricing and finalisation adjustments will decrease Underlying EBITDA by US$59 million in the December 2022 half year and are included in the average realised copper price in the above table.

Corporate update

Portfolio

In December 2022, BHP announced the signing of a Scheme Implementation Deed (SID) with OZ Minerals Ltd (OZL) to acquire 100 per cent of OZL through a scheme of arrangement for a cash price of A$28.25 per OZL share. The SID confirms the terms of the scheme and BHP's non-binding indicative proposal announced on 18 November 2022. The implementation of the scheme is subject to satisfaction of certain conditions including OZL shareholder approval. The OZL Board has unanimously recommended that OZL shareholders vote in favour of the scheme in the absence of a superior proposal and subject to an independent expert concluding that the scheme is in the best interests of OZL shareholders.

In October 2022, BHP agreed to invest an additional US$50 million (the second investment) in the Kabanga Nickel Project (Kabanga) in Tanzania, subject to the satisfaction of customary conditions precedent. On closing, BHP's equity stake in Kabanga will increase to 14.3 per cent. In addition, BHP has signed an agreement with Kabanga Nickel Limited giving BHP the option to increase its interest in Kabanga to 51 per cent.

Decarbonisation

Throughout the December 2022 quarter we continued to make progress towards our decarbonisation targets and goals and supported efforts to reduce greenhouse gas (GHG) emissions across our value chain.

In October 2022, BHP entered into an agreement with ArcelorMittal, Mitsubishi Heavy Industries and Mitsubishi Development for a multi-year trial of carbon capture technology, which will involve a feasibility and design study to support progress to full scale deployment, and trials at two of ArcelorMittal's steel plants.

In November 2022, BHP signed a renewable Power Purchase Agreement (PPA) with Neoen, which is expected to meet half of Olympic Dam's electricity needs from the 2026 financial year, based on current forecast demand, and allow Olympic Dam to record a net zero emission position for the contracted volume of supply

Samarco

In December 2022, BHP agreed to fund US$915 million in further financial support for the Renova Foundation. The funding is for the 2023 calendar year and will be offset against the Group's provision for the Samarco dam failure.

We will provide an update to the ongoing potential financial impacts on BHP Brasil of the Samarco dam failure with the release of the financial results on 21 February 2023. Any financial impacts will continue to be treated as an exceptional item.

                                                                                                5

Copper

Production


Dec H22

 

Dec Q22

 

Dec H22

vs

Dec H21

 

Dec Q22

vs

Dec Q21

 

Dec Q22

vs

Sep Q22

 

Copper (kt)

 834.4

 424.3

12%

16%

3%

Zinc (t)

 62,614

 29,929

0%

1%

(8%)

Uranium (t)

 1,760

 943

115%

229%

15%

Copper - Total copper production increased by 12 per cent to 834 kt. Guidance for the 2023 financial year remains unchanged at between 1,635 and 1,825 kt.

Escondida copper production increased by five per cent to 511 kt primarily due to higher concentrator feed grade of 0.79 per cent, compared to 0.72 per cent in the December 2021 half year. The higher grade was partially offset by lower throughput and the impact of road blockades across Chile in the December 2022 quarter, which reduced availability of some key mine supplies. Full year production is trending towards the low end of the guidance range of between 1,080 and 1,180 kt as a result of lower than expected concentrator feed grade and throughput. Production is weighted to the second half of the year, with concentrator feed grade expected to improve compared to the December 2022 half year. Medium term guidance of 1.2 Mtpa of copper production on average over the next five years remains unchanged.

Pampa Norte copper production increased by eight per cent to 147 kt reflecting the continued ramp up of the Spence Growth Option (SGO). Guidance for the 2023 financial year remains unchanged at between 240 and 290 kt. The SGO plant modifications started in August 2022 and are planned to be completed in the 2023 calendar year. Expected capital expenditure for the works remains unchanged at approximately US$100 million. Further studies are ongoing for additional capacity uplift at SGO. Cerro Colorado continues to transition towards planned closure at the end of the 2023 calendar year.

At Spence, we continue to closely monitor previously identified Tailings Storage Facility (TSF) anomalies. We have reduced the volume of water in the tailings facility and continue to work with the local regulatory agencies, including on the implementation of a remediation plan for the TSF. The SGO concentrator continues to operate with no impact to production or market guidance. Spence is expected to reach an average of approximately 270 ktpa of production for four years (including cathodes) following the completion of the SGO plant modifications and remediation of TSF anomalies.

 

Olympic Dam copper production increased by 138 per cent to 104 kt primarily as a result of the major smelter maintenance campaign (SCM21) in the prior period. Continued strong concentrator and smelter performance resulted in near record material milled and concentrate smelted in the half year. Record gold production was also achieved in the half year as a result of debottlenecking initiatives implemented in the prior year. Copper production guidance for the 2023 financial year remains unchanged at between 195 and 215 kt.

Antamina copper production decreased by three per cent to 72 kt reflecting lower copper head grades partially offset by higher throughput. Zinc production was flat at 63 kt reflecting lower zinc head grades offset by higher throughput. Guidance remains unchanged for the 2023 financial year, with copper production of between 120 and 140 kt, and zinc production of between 115 and 135 kt.

6

Iron ore

Production


Dec H22

Dec Q22

Dec H22

vs

Dec H21

Dec Q22

vs

Dec Q21

Dec Q22

vs

Sep Q22

Iron ore production (kt)

 131,975

 66,902

2%

1%

3%

Iron ore - Total iron ore production increased by two per cent to 132 Mt. Guidance for the 2023 financial year remains unchanged at between 249 and 260 Mt.

WAIO achieved record production of 130 Mt (146 Mt on a 100 per cent basis) in the December 2022 half year. This reflects continued strong supply chain performance, including improved car dumper utilisation, and lower COVID-19 related impacts than the prior period. This was partially offset by wet weather impacts in the September 2022 quarter. South Flank ramp up to full production capacity of 80 Mtpa (100 per cent basis) by the end of the 2024 financial year remains on track. Natural variability in the ore grade is expected as the mine progresses through the close to surface material, however this is expected to stabilise as we move deeper into the ore body and achieve full ramp up.

WAIO production guidance for the 2023 financial year remains unchanged at between 246 and 256 Mt (278 and 290 Mt on a 100 per cent basis) and reflects the tie-in of the port debottlenecking project (PDP1) as well as the continued ramp up of South Flank in the second half of the year.

Samarco production increased by eight per cent to 2.2 Mt (BHP share), reflecting the successful ramp up of one concentrator, following the recommencement of iron ore pellet production in December 2020. Guidance for the 2023 financial year remains unchanged at between 3 and 4 Mt (BHP share).

Coal

Production


Dec H22

Dec Q22

Dec H22

vs

Dec H21

Dec Q22

vs

Dec Q21

Dec Q22

vs

Sep Q22

Metallurgical coal (kt)

13,614

6,952

5%

10%

4%

Energy coal (kt)

5,473

2,851

(24%)

(4%)

9%

 

Metallurgical coal - BMA production increased by five per cent to 14 Mt (27 Mt on a 100 per cent basis) driven by an improvement in underlying truck productivity, in particular for the autonomous fleets following completion of the transitions at Goonyella and Daunia, higher yields as a result of mine sequencing, as well as the reduced impact of labour constraints relative to the prior period. This was partially offset by the impact of significant wet weather during the December 2022 half year2. Full year production is trending to the low end of the guidance range of between 29 and 32 Mt (58 and 64 Mt on a 100 per cent basis) as a result of significant wet weather. An additional long wall move at Broadmeadow has been accelerated into the June 2023 quarter due to improved mining rates.

Negotiations for the BMA Enterprise Agreement (EA) 2022 have concluded with a successful workforce ballot on 22 December 2022. The EA applies to the Goonyella Riverside, Peak Downs, Saraji and Blackwater mines. The new EA has been approved by the Fair Work Commission and will operate from 19 January 2023 for a period of three years.

 

7


The Queensland Government's decision to raise coal royalties to the highest maximum rate in the world makes Queensland uncompetitive and puts investment and jobs at risk. We see strong long-term demand from global steelmakers for Queensland's high quality metallurgical coal, however in the absence of government policy that is both competitive and predictable, we are unable to make significant new investments in Queensland. This increase to royalties will impact the local businesses, suppliers and communities in Central Queensland where we operate.

Energy coal - NSWEC production decreased by 24 per cent to 5 Mt, reflecting the ongoing impacts of record wet weather, continued labour shortages, planned wash plant maintenance during the December 2022 quarter and an increased proportion of washed coal. Higher quality coals made up approximately 90 per cent of sales, compared to approximately 80 per cent in the December 2021 half year. Production guidance for the 2023 financial year remains unchanged at between 13 and 15 Mt.

Other

Nickel production


Dec H22

Dec Q22

Dec H22

vs

Dec H21

Dec Q22

vs

Dec Q21

Dec Q22

vs

Sep Q22

Nickel (kt)

 38.4

 17.7

(2%)

(18%)

(14%)

Nickel - Nickel West production decreased by two per cent to 38 kt, reflecting the slower than expected ramp up of the refinery following planned smelter and refinery maintenance during the December 2022 quarter. Guidance for the 2023 financial year remains unchanged at between 80 and 90 kt, with volumes weighted to the second half of the financial year.

Potash - Our major potash project under development at Jansen is tracking to plan. For the 2023 financial year, we will continue to focus on civil and mechanical construction on the surface and underground, as well as equipment procurement and port construction.

Projects

Project and
ownership

Capital expenditure US$M

Initial production target date

Capacity

Progress

Jansen Stage 1
(Canada)
100%

5,723

End-CY26

Design, engineering and construction of an underground potash mine and surface infrastructure, with capacity to produce 4.35 Mtpa.

Project is 16% complete

8

Minerals exploration

Minerals exploration expenditure for the December 2022 half year was US$156 million, of which US$127 million was expensed.

In August 2022, we announced the establishment of BHP Xplor, an innovative accelerator program to support early-stage mineral exploration companies to find critical resources, such as copper and nickel. The program merges concepts from venture capital and early-stage accelerators offering participants in-kind services, mentorship, and networking opportunities. Applications for the program closed on 31 October 2022 and we received a significant number of applications from around the world. We have selected seven companies into the accelerator program which begins in January 2023.

We initiated greenfield exploration activities in southern Colombia and continue to progress activity in Australia, Canada, Chile, Ecuador, north-west Mexico, Peru and the south-west United States.

At Oak Dam in South Australia, BHP is continuing next stage resource definition drilling with six drill rigs. 

Following a review of prospectivity and core results, BHP acquired a 19.9 per cent interest via a placement in Brixton Metals, providing exposure to a large block of ground prospective for copper in northern British Columbia, Canada.

The termination agreement in respect of the Earn-In Agreement over the Tarqui copper project in Ecuador has been signed by BHP and Luminex. BHP's exit from the project was finalised in early January 2023.

                                                                                                                           9

Variance analysis relates to the relative performance of BHP and/or its operations during the six months ended December 2022 compared with the six months ended December 2021, unless otherwise noted. Production volumes, sales volumes and capital and exploration expenditure from subsidiaries are reported on a 100 per cent basis; production and sales volumes from equity accounted investments and other operations are reported on a proportionate consolidation basis. Numbers presented may not add up precisely to the totals provided due to rounding.

 

The following footnotes apply to this Operational Review:

1       2023 financial year unit cost guidance: Escondida US$1.25-1.45/lb, WAIO US$18-19/t, BMA US$100-105/t and NSWEC US$84-91/t; based on exchange rates of AUD/USD 0.72 and USD/CLP 830.

2       493 mm of rainfall recorded at Moranbah in the December 2022 half year compared to 368 mm in the December 2021 half year.

 

The following abbreviations may have been used throughout this report: cost and freight (CFR); cost, insurance and freight (CIF); dry metric tonne unit (dmtu); free on board (FOB); grams per tonne (g/t); kilograms per tonne (kg/t); kilometre (km); megawatt (MW); metre (m); millimetre (mm); million tonnes (Mt); million tonnes per annum (Mtpa); ounces (oz); pounds (lb); thousand ounces (koz); thousand tonnes (kt); thousand tonnes per annum (ktpa); thousand tonnes per day (ktpd); tonnes (t); and wet metric tonnes (wmt).

In this release, the terms 'BHP', the 'Group', 'BHP Group', 'we', 'us', 'our' and 'ourselves' are used to refer to BHP Group Limited and, except where the context otherwise requires, our subsidiaries. Refer to note 28 'Subsidiaries' of the Financial Statements in BHP's 30 June 2022 Appendix 4E for a list of our significant subsidiaries. Those terms do not include non-operated assets. Notwithstanding that this release may include production, financial and other information from non-operated assets, non-operated assets are not included in the BHP Group and, as a result, statements regarding our operations, assets and values apply only to our operated assets unless stated otherwise. Our non-operated assets include Antamina and Samarco. BHP Group cautions against undue reliance on any forward-looking statement or guidance in this release, particularly in light of the current economic climate and significant volatility, uncertainty and disruption arising in connection with COVID-19. These forward-looking statements are based on information available as at the date of this release and are not guarantees or predictions of future performance and involve known and unknown risks, uncertainties and other factors, many of which are beyond our control and which may cause actual results to differ materially from those expressed in the statements contained in this release.

                                                                                                         10

 

Further information on BHP can be found at: bhp.com

 

Authorised for lodgement by:

Stefanie Wilkinson

Group Company Secretary

 

Media Relations

 

Email: media.relations@bhp.com


Investor Relations

 

Email: investor.relations@bhp.com

 


 

Australia and Asia

 

Gabrielle Notley

Tel: +61 3 9609 3830  Mobile: +61 411 071 715

 

Europe, Middle East and Africa

 

Neil Burrows

Tel: +44 20 7802 7484  Mobile: +44 7786 661 683

 

Americas

 

Renata Fernandez

Mobile: +56 9 8229 5357


Australia and Asia

 

Dinesh Bishop

Mobile: +61 407 033 909

 

Europe, Middle East and Africa

 

James Bell

Tel: +44 20 7802 7144  Mobile: +44 7961 636 432

 

Americas

 

Monica Nettleton

Mobile: +1 416 518 6293




BHP Group Limited ABN 49 004 028 077

LEI WZE1WSENV6JSZFK0JC28

Registered in Australia

Registered Office: Level 18, 171 Collins Street

Melbourne Victoria 3000 Australia

Tel +61 1300 55 4757 Fax +61 3 9609 3015






BHP Group is headquartered in Australia




bhp_media_icons.png

Follow us on social media

 

11

 

 

 

Production summary

 



Quarter ended

Year to date

BHP

interest

Dec

2021

Mar

2022

Jun

2022

Sep

2022

Dec

2022

Dec

2022

Dec

2021

Copper 1

 








Copper

 








Payable metal in concentrate (kt)

 








Escondida 2

57.5%

196.2

178.2

233.5

203.1

208.3

411.4

390.9

Pampa Norte 3

100.0%

24.2

32.4

28.2

28.6

32.5

61.1

50.6

Antamina

33.8%

38.4

36.1

39.6

37.1

35.2

72.3

74.2



 

 

 

 

 

 

 

Total


258.8

246.7

301.3

268.8

276.0

544.8

515.7



 

 

 

 

 

 

 










Cathode (kt)

 








Escondida 2

57.5%

48.4

48.2

55.8

49.6

49.7

99.3

97.4

Pampa Norte 3

100%

44.1

35.8

49.0

42.0

44.2

86.2

85.2

Olympic Dam

100%

14.2

39.0

55.7

49.7

54.4

104.1

43.7



 

 

 

 

 

 

 

Total


106.7

123.0

160.5

141.3

148.3

289.6

226.3



 

 

 

 

 

 

 



 

 

 

 

 

 

 

Total copper (kt)

 

365.5

369.7

461.8

410.1

424.3

834.4

742.0

 

 

 

 

 

 

 

 

 

Lead









Payable metal in concentrate (t)

 








Antamina

33.8%

277

282

181

228

114

342

655



 

 

 

 

 

 

 

Total


277

282

181

228

114

342

655



 

 

 

 

 

 

 

Zinc









Payable metal in concentrate (t)

 








Antamina

33.8%

29,603

32,732

27,576

32,685

29,929

62,614

62,892



 

 

 

 

 

 

 

Total


29,603

32,732

27,576

32,685

29,929

62,614

62,892



 

 

 

 

 

 

 

Gold









Payable metal in concentrate (troy oz)

 








Escondida 2

57.5%

42,937

36,303

45,770

38,236

48,402

86,638

84,899

Pampa Norte 3

100%

5,776

7,929

8,198

5,521

3,875

9,396

12,743

Olympic Dam (refined gold)

100%

37,805

29,355

26,080

47,184

43,280

90,464

64,082



 

 

 

 

 

 

 

Total


86,518

73,587

80,048

90,941

95,557

186,498

161,724



 

 

 

 

 

 

 

Silver









Payable metal in concentrate (troy koz)

 








Escondida 2

57.5%

1,462

1,270

1,311

1,210

1,510

2,720

2,753

Pampa Norte 3

100%

215

261

262

252

245

497

488

Antamina

33.8%

1,308

1,191

1,212

1,190

923

2,113

2,675

Olympic Dam (refined silver)

100%

258

149

145

295

261

556

449



 

 

 

 

 

 

 

Total


3,243

2,871

2,930

2,947

2,939

5,886

6,365



 

 

 

 

 

 

 


12

Production summary

 



Quarter ended

Year to date

BHP

interest

Dec

2021

Mar

2022

Jun

2022

Sep

2022

Dec

2022

Dec

2022

Dec

2021

Uranium

 








Payable metal in concentrate (t)

 








Olympic Dam

100%

287

781

776

817

943

1,760

818



 

 

 

 

 

 

 

Total


287

781

776

817

943

1,760

818



 

 

 

 

 

 

 

Molybdenum

 








Payable metal in concentrate (t)

 








Pampa Norte 3

100%

-

-

71

34

216

250

-

Antamina

33.8%

217

190

249

262

348

610

359



 

 

 

 

 

 

 

Total


217

190

320

296

564

860

359



 

 

 

 

 

 

 

Iron Ore

 








Iron Ore

 








Production (kt) 4

 








Newman

85%

14,577

11,940

14,063

14,053

16,172

30,225

31,038

Area C Joint Venture

85%

22,911

24,888

27,685

26,971

26,302

53,273

41,858

Yandi Joint Venture

85%

12,261

8,418

6,409

5,497

5,613

11,110

24,095

Jimblebar 5

85%

15,324

13,444

15,005

17,404

17,720

35,124

30,333

Samarco

50%

1,029

994

1,000

1,148

1,095

2,243

2,077



 

 

 

 

 

 

 

Total


66,102

59,684

64,162

65,073

66,902

131,975

129,401



 

 

 

 

 

 

 

Coal









Metallurgical coal

 








Production (kt) 6

 








BHP Mitsubishi Alliance (BMA)

50%

6,300

7,944

8,183

6,662

6,952

13,614

13,015



 

 

 

 

 

 

 

Total


6,300

7,944

8,183

6,662

6,952

13,614

13,015



 

 

 

 

 

 

 

Energy coal

 








Production (kt)

 








NSW Energy Coal

100%

2,967

2,577

3,919

2,622

2,851

5,473

7,205



 

 

 

 

 

 

 

Total


2,967

2,577

3,919

2,622

2,851

5,473

7,205



 

 

 

 

 

 

 

Other









Nickel

 








Saleable production (kt)

 








Nickel West

100%

21.5

18.7

18.8

20.7

17.7

38.4

39.3



 

 

 

 

 

 

 

Total


21.5

18.7

18.8

20.7

17.7

38.4

39.3



 

 

 

 

 

 

 

Cobalt

 








Saleable production (t)

 








Nickel West

100%

220

125

110

238

93

331

397



 

 

 

 

 

 

 

Total


220

125

110

238

93

331

397

 

1      Metal production is reported on the basis of payable metal.

2      Shown on a 100% basis. BHP interest in saleable production is 57.5%.

3      Includes Cerro Colorado and Spence.

4      Iron ore production is reported on a wet tonnes basis.

5      Shown on a 100% basis. BHP interest in saleable production is 85%.

6      Metallurgical coal production is reported on the basis of saleable product. Production figures may include some thermal coal.

 

Throughout this report figures in italics indicate that this figure has been adjusted since it was previously reported.

 

 

 

13

Production and sales report

 



Quarter ended

Year to date


Dec

2021

Mar

2022

Jun

2022

Sep

2022

Dec

2022

Dec

2022

Dec

2021

Copper

 








Metals production is payable metal unless otherwise stated.

Escondida, Chile 1

 








Material mined

(kt)

117,284

107,676

115,409

110,248

101,987

212,235

231,158

Concentrator throughput

(kt)

35,787

30,235

34,318

32,894

33,911

66,805

69,315

Average copper grade - concentrator

(%)

0.71%

0.80%

0.88%

0.83%

0.76%

0.79%

0.72%

Production ex mill

(kt)

203.6

191.5

239.5

214.6

212.8

427.4

404.8

Production

 








Payable copper

(kt)

196.2

178.2

233.5

203.1

208.3

411.4

390.9

Copper cathode (EW)

(kt)

48.4

48.2

55.8

49.6

49.7

99.3

97.4

 - Oxide leach

(kt)

13.1

12.2

17.5

15.2

17.6

32.8

27.9

 - Sulphide leach

(kt)

35.3

36.0

38.3

34.4

32.1

66.5

69.5



 

 

 

 

 

 

 

Total copper

(kt)

244.6

226.4

289.3

252.7

258.0

510.7

488.3



 

 

 

 

 

 

 

Payable gold concentrate

(troy oz)

42,937

36,303

45,770

38,236

48,402

86,638

84,899

Payable silver concentrate

(troy koz)

1,462

1,270

1,311

1,210

1,510

2,720

2,753

Sales

 








Payable copper

(kt)

200.2

177.0

230.4

196.7

216.0

412.7

390.7

Copper cathode (EW)

(kt)

49.7

47.2

58.9

45.9

53.5

99.4

96.4

Payable gold concentrate

(troy oz)

42,937

36,303

45,770

38,236

48,402

86,638

84,899

Payable silver concentrate

(troy koz)

1,462

1,270

1,311

1,210

1,510

2,720

2,753

 

1      Shown on a 100% basis. BHP interest in saleable production is 57.5%.

 


 

14

Production and sales report

 



Quarter ended

Year to date


Dec

2021

Mar

2022

Jun

2022

Sep

2022

Dec

2022

Dec

2022

Dec

2021

Pampa Norte, Chile

 








Cerro Colorado









Material mined

(kt)

4,782

3,516

3,604

3,179

583

3,762

10,160

Ore stacked

(kt)

4,029

3,181

4,259

4,373

4,119

8,492

7,595

Average copper grade - stacked

(%)

0.62%

0.53%

0.55%

0.54%

0.56%

0.55%

0.61%

Production

 








Copper cathode (EW)

(kt)

15.3

11.6

14.7

12.8

12.2

25.0

28.7

Sales

 








Copper cathode (EW)

(kt)

16.0

10.5

16.2

13.3

12.2

25.5

28.1

Spence









Material mined

(kt)

24,025

24,040

26,749

26,956

26,980

53,936

45,179

Ore stacked

(kt)

5,071

5,055

5,099

5,577

5,155

10,732

10,329

Average copper grade - stacked

(%)

0.66%

0.67%

0.66%

0.70%

0.66%

0.68%

0.65%

Concentrator throughput

(kt)

6,234

6,512

6,311

6,433

7,602

14,035

12,020

Average copper grade - concentrator

(%)

0.60%

0.65%

0.66%

0.63%

0.60%

0.61%

0.62%

Production

 








Payable copper

(kt)

24.2

32.4

28.2

28.6

32.5

61.1

50.6

Copper cathode (EW)

(kt)

28.8

24.2

34.3

29.2

32.0

61.2

56.5



 

 

 

 

 

 

 

Total copper

(kt)

53.0

56.6

62.5

57.8

64.5

122.3

107.1



 

 

 

 

 

 

 

Payable gold concentrate

(troy oz)

5,776

7,929

8,198

5,521

3,875

9,396

12,743

Payable silver concentrate

(troy koz)

215

261

262

252

245

497

488

Payable molybdenum

(t)

-

-

71

34

216

250

-

Sales

 








Payable copper

(kt)

24.9

28.1

28.1

26.0

22.0

48.0

53.3

Copper cathode (EW)

(kt)

31.2

20.2

35.4

29.1

33.4

62.5

58.9

Payable gold concentrate

(troy oz)

5,776

7,929

8,198

5,521

3,875

9,396

12,743

Payable silver concentrate

(troy koz)

215

261

262

252

245

497

488

Payable molybdenum

(t)

-

-

25

25

216

241

-

 


15

Production and sales report

 



Quarter ended

Year to date


Dec

2021

Mar

2022

Jun

2022

Sep

2022

Dec

2022

Dec

2022

Dec

2021

Copper (continued)

 








Metals production is payable metal unless otherwise stated.

Antamina, Peru

 








Material mined (100%)

(kt)

58,179

58,118

64,026

63,865

68,750

132,615

124,760

Concentrator throughput (100%)

(kt)

13,011

13,135

13,131

13,858

14,272

28,130

26,230

Average head grades









 - Copper

(%)

1.00%

0.94%

1.02%

0.93%

0.86%

0.89%

0.98%

 - Zinc

(%)

1.11%

1.13%

1.05%

1.09%

0.99%

1.04%

1.14%

Production

 








Payable copper

(kt)

38.4

36.1

39.6

37.1

35.2

72.3

74.2

Payable zinc

(t)

29,603

32,732

27,576

32,685

29,929

62,614

62,892

Payable silver

(troy koz)

1,308

1,191

1,212

1,190

923

2,113

2,675

Payable lead

(t)

277

282

181

228

114

342

655

Payable molybdenum

(t)

217

190

249

262

348

610

359

Sales

 








Payable copper

(kt)

41.9

32.9

40.7

37.6

34.7

72.3

74.6

Payable zinc

(t)

32,513

29,920

30,847

33,820

29,127

62,947

65,148

Payable silver

(troy koz)

1,405

1,078

1,230

1,015

850

1,865

2,508

Payable lead

(t)

344

269

363

130

91

221

576

Payable molybdenum

(t)

170

199

205

250

298

548

256

Olympic Dam, Australia

 








Material mined 1

(kt)

1,998

2,424

2,477

2,412

2,264

4,676

3,933

Ore milled

(kt)

1,105

2,122

2,436

2,570

2,687

5,257

3,129

Average copper grade

(%)

2.17%

2.21%

2.15%

2.13%

2.08%

2.10%

2.08%

Average uranium grade

(kg/t)

0.55

0.62

0.56

0.58

0.58

0.58

0.55

Production

 








Copper cathode (ER and EW)

(kt)

14.2

39.0

55.7

49.7

54.4

104.1

43.7

Payable uranium

(t)

287

781

776

817

943

1,760

818

Refined gold

(troy oz)

37,805

29,355

26,080

47,184

43,280

90,464

64,082

Refined silver

(troy koz)

258

149

145

295

261

556

449

Sales

 








Copper cathode (ER and EW)

(kt)

17.9

36.3

55.8

45.9

56.8

102.7

47.0

Payable uranium

(t)

541

236

1,031

272

1,127

1,399

1,077

Refined gold

(troy oz)

38,768

30,935

24,622

49,542

41,900

91,442

63,422

Refined silver

(troy koz)

290

182

87

320

233

553

416

 

1      Material mined refers to underground ore mined, subsequently hoisted or trucked to surface.

 


16

Production and sales report

 



Quarter ended

Year to date


Dec

2021

Mar

2022

Jun

2022

Sep

2022

Dec

2022

Dec

2022

Dec

2021

Iron Ore

 








Iron ore production and sales are reported on a wet tonnes basis.

Western Australia Iron Ore, Australia

 








Production

 








Newman

(kt)

14,577

11,940

14,063

14,053

16,172

30,225

31,038

Area C Joint Venture

(kt)

22,911

24,888

27,685

26,971

26,302

53,273

41,858

Yandi Joint Venture

(kt)

12,261

8,418

6,409

5,497

5,613

11,110

24,095

Jimblebar 1

(kt)

15,324

13,444

15,005

17,404

17,720

35,124

30,333



 

 

 

 

 

 

 

Total production

(kt)

65,073

58,690

63,162

63,925

65,807

129,732

127,324



 

 

 

 

 

 

 

Total production (100%)

(kt)

73,852

66,674

71,660

72,135

74,292

146,427

144,439



 

 

 

 

 

 

 

Sales

 








Lump

(kt)

17,827

16,966

20,006

19,561

20,375

39,936

35,373

Fines

(kt)

46,809

42,187

44,308

42,696

44,121

86,817

91,848



 

 

 

 

 

 

 

Total

(kt)

64,636

59,153

64,314

62,257

64,496

126,753

127,221



 

 

 

 

 

 

 

Total sales (100%)

(kt)

73,222

67,110

72,796

70,276

72,688

142,964

144,037



 

 

 

 

 

 

 

 

1      Shown on a 100% basis. BHP interest in saleable production is 85%.

 

Samarco, Brazil

 








Production

(kt)

1,029

994

1,000

1,148

1,095

2,243

2,077

Sales

(kt)

950

943

991

1,146

1,097

2,243

2,061

 


17

Production and sales report

 



Quarter ended

Year to date


Dec

2021

Mar

2022

Jun

2022

Sep

2022

Dec

2022

Dec

2022

Dec

2021

Coal









Coal production is reported on the basis of saleable product.

BHP Mitsubishi Alliance (BMA), Australia








Production 1

 








Blackwater

(kt)

1,202

1,478

1,751

1,283

1,160

2,443

2,605

Goonyella

(kt)

1,797

2,336

2,429

1,780

1,997

3,777

3,595

Peak Downs

(kt)

960

1,395

1,366

1,325

1,480

2,805

2,183

Saraji

(kt)

1,081

1,366

1,168

1,020

1,243

2,263

2,080

Daunia

(kt)

304

338

472

324

441

765

681

Caval Ridge

(kt)

956

1,031

997

930

631

1,561

1,871



 

 

 

 

 

 

 

Total production

(kt)

6,300

7,944

8,183

6,662

6,952

13,614

13,015



 

 

 

 

 

 

 

Total production (100%)

(kt)

12,600

15,888

16,366

13,324

13,904

27,228

26,030



 

 

 

 

 

 

 

Sales

 








Coking coal

(kt)

4,875

6,334

6,734

5,615

5,872

11,487

10,290

Weak coking coal

(kt)

754

805

1,118

600

727

1,327

1,488

Thermal coal

(kt)

455

484

765

267

428

695

1,031



 

 

 

 

 

 

 

Total sales

(kt)

6,084

7,623

8,617

6,482

7,027

13,509

12,809



 

 

 

 

 

 

 

Total sales (100%)

(kt)

12,168

15,246

17,234

12,964

14,054

27,018

25,618



 

 

 

 

 

 

 

 

1      Production figures include some thermal coal.

 

 

18

Production and sales report

 



Quarter ended

Year to date


Dec

2021

Mar

2022

Jun

2022

Sep

2022

Dec

2022

Dec

2022

Dec

2021

NSW Energy Coal, Australia

 








Production

(kt)

2,967

2,577

3,919

2,622

2,851

5,473

7,205

Sales - export

(kt)

3,718

2,703

3,923

2,441

2,862

5,303

7,498











 



Quarter ended

Year to date


Dec

2021

Mar

2022

Jun

2022

Sep

2022

Dec

2022

Dec

2022

Dec

2021

Other

 








Nickel production is reported on the basis of saleable product






Nickel West, Australia

 








Mt Keith









Nickel concentrate

(kt)

47.0

47.1

48.0

42.6

39.6

82.2

100.7

Average nickel grade

(%)

13.2

14.4

16.1

17.0

15.5

16.3

13.9

Leinster









Nickel concentrate

(kt)

77.4

78.0

76.0

66.8

47.9

114.7

151.2

Average nickel grade

(%)

9.1

8.9

10.3

9.9

9.4

9.7

9.0

Saleable production

 








Refined nickel 1

(kt)

18.2

13.3

11.7

17.5

10.8

28.3

32.6

Nickel sulphate 2

(kt)

0.4

0.7

0.5

1.2

0.4

1.6

0.4

Intermediates and nickel by-products 3

(kt)

2.9

4.7

6.6

2.0

6.5

8.5

6.3



 

 

 

 

 

 

 

Total nickel

(kt)

21.5

18.7

18.8

20.7

17.7

38.4

39.3



 

 

 

 

 

 

 

Cobalt by-products

(t)

220

125

110

238

93

331

397

Sales

 





 



Refined nickel 1

(kt)

16.9

15.3

11.7

18.1

10.2

28.3

30.7

Nickel sulphate 2

(kt)

0.1

0.7

0.5

0.8

0.5

1.3

0.1

Intermediates and nickel by-products 3

(kt)

3.1

2.7

6.4

1.8

7.7

9.5

7.0



 

 

 

 

 

 

 

Total nickel

(kt)

20.1

18.7

18.6

20.7

18.4

39.1

37.8



 

 

 

 

 

 

 

Cobalt by-products

(t)

220

125

110

238

93

331

397











 

1      High quality refined nickel metal, including briquettes and powder.

2      Nickel sulphate crystals produced from nickel powder.

3      Nickel contained in matte and by-product streams.

 

 

19

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 