Interim Results

Source: RNS
RNS Number : 7119F
Phoenix Copper Limited
26 September 2024
 

 

 

Phoenix Copper Limited / Ticker: PXC / Sector: Mining

26 September 2024

Phoenix Copper Limited

("Phoenix" or the "Company", together with subsidiaries the "Group")

Interim Results

Phoenix Copper Ltd (AIM: PXC, OTCQX ADR: PXCLY), the AIM-quoted USA-focused base and precious metals emerging producer and exploration company, is pleased to announce its unaudited interim results for the six months ended 30 June 2024 (the "Period").

Year-to-date Highlights

Corporate & Financial

-      Investment in Empire Mine increased to $42.11 million (2023: $35.88 million)

-      Group reports loss of $1.10 million (2023: loss of $0.63 million)

-      Period-end Group net assets of $48.55 million (2023: $37.39 million)

-      Company reports loss of $0.05 million (2023: profit of $0.31 million)

-      Company loans to Idaho operating subsidiaries increased to $37.47 million (2023: $29.63 million)

-      Placing, subscription, and retail offer to raise $3.52 million (gross) completed in January 2024

-      $2 million unsecured short-term loan refinanced into 18 month unsecured term loan in March 2024

-      $80 million floating rate corporate copper bond issue completed in June 2024. Initial $5 million drawn down, with discussions ongoing with strategic bond investor regarding the timing of future drawdowns (see below)

-      Bonds listing on The International Stock Exchange ("TISE") completed

-      Andre Cohen retired as a director and joined the Advisory Board

-      Paul de Gruchy, VP of Investor Relations, also joined the Advisory Board

Operational

-      Empire Mine open-pit mineral resources upgraded to mineral reserves. Inaugural mineral reserve statement published

-      Proven & Probable mineral reserves of 10.1 million tonnes containing 109,487,970 pounds ("lbs") of copper, 104,000 ounces ("oz") of gold and 4,654,400 oz of silver (66,467 tonnes of copper equivalent metal)

-      Mineral reserves estimated using assay data from 485 drill holes, extensive geological modelling, metallurgical recovery test work, geotechnical evaluation, and mine design

-      Empire Mine open-pit Pre-Feasibility Study ("PFS") published post-Period. Pre-tax cumulative net free cash flow of $153 million over 8 year mine life; total cash costs of $2.44 / lb

-      Life of mine production of 40,424 tonnes copper, 40,161 oz gold and 1.76 million oz silver

-      Initial Empire Mine open-pit equipment delivered to site, including two pre-owned ball mills and a fully equipped assay laboratory, purchased at significant discounts to the price of the same equipment when new

-      Areas of significant and consistent mineralisation identified at the Navarre Creek gold claim block. 20 additional mining claims totalling 400 acres staked

-      Earn-in Agreement on the Redcastle cobalt property renewed with Electra Battery Materials

Chairman's Statement

It gives me great pleasure to report on the achievement of several important milestones on the journey towards our first production at the Empire mine in Idaho, USA.

I would like to thank Ryan and his team for delivering the PFS, which, despite significant price increases in steel, diesel and processing chemicals, shows attractive returns at current metal prices.

The anticipated capital expenditure required to build the mine of $62.6 million compares favourably with cumulative free cashflow, net of all capital and sustaining capital costs, of $153 million over an 8 year mine life. The metal prices used by our independent consultants are lower than prevailing spot prices for copper, gold and silver. The PFS generates an internal rate of return ("IRR") of 46.4% which is significantly higher than the 15% hurdle rate used by mining majors, and our projected cash cost of production of $2.44 per lb of copper would rank us 199th out of the 300 major copper mines in the S & P rankings for 2024 - with cash costs well below several larger and well-established mines in North America.

It is to the technical team's credit that they were able to redesign the mine plan to take into account the challenges presented by the steep rises in capital and operating costs. Our plant will process copper, gold and silver at the same time, and without the need for copper ore to sit on leach pads for 90 days. The plant will also be sited next to the open pit, significantly reducing transport costs and the environmental impact of the project.

Importantly, the plant will also be capable of processing both oxide and sulphide ores. As a result, and resources permitting, we now plan to access the underground deposit as early as next year by driving an adit into the high-grade sulphide ores, in order to blend them with oxide ore to enhance cashflow. In our recent drilling campaign we recovered sulphide core containing over 8% copper, compared with a 0.66% grade in our oxide reserves, and a global average of less than 0.5%.

Our records show that before the Empire mine closed in 1942, they were mining 6% to 8% copper and recovering 3.64%, as well as gold, silver and zinc. The last underground shipment of ore also contained over 4% tungsten, which is high on the list of critical metals, as indeed is antimony, which we have discovered at our 4,070 acre Navarre Creek Gold exploration property.

It is our view that the true value of the Company will be underpinned by the high grade underground deposit, which is open at depth and along strike, potentially spread over many kilometres. It is really exciting to have the opportunity to start unlocking this value a number of years earlier than expected.

As a result of the subscription for our corporate copper bonds from NIU Invest SE ("NIU Invest") in May, as well as the small equity placement we did earlier in the year, we have been able to purchase good quality second- hand equipment at prices which significantly improve the project economics, as well as lowering lead times. This is an ongoing process as you can read in the CEO's report, which will be optimized further as a result of the completion of the PFS. Following the publication of the PFS, we are in discussions with NIU Invest regarding a revised drawdown schedule for future tranches of copper bonds.

We look forward to updating you with further progress on permitting, capital expenditure on mine equipment and financing as the year unfolds and we move ever closer to revenue generation.

Thank you, as always, for your continued support.

 

Marcus Edwards-Jones

Chairman

Chief Executive Officer's Report

The year to date has marked a significant and positive turning point for the Company with the publication of an inaugural Proven and Probable mineral reserve statement for the Empire open pit oxide deposit, which was followed-up by the publication of the PFS.  These publications are the culmination of several seasons of resource drilling, extensive geological and economic modelling, metallurgical test work, and thousands of hours of tireless data evaluation and engineering. The PFS is available on the Company's website and I recommend everyone take the time to read through it.

The Empire mineral reserves statement reports Proven & Probable reserves of 10.1 million tonnes containing 109,487,970 lbs of copper, 104,000 ounces ("oz") of gold and 4,654,400 oz of silver, for a total of 66,467 copper equivalent metric tonnes ("mt"). This is a considerable step forward because, unlike mineral resources, mineral reserves meet the requirements of geological certainty, accessibility, and economic viability.

Using the Empire mineral reserves as a basis, the Company's PFS highlights an 8-year mine life producing payable metal of 89,094,705 copper lbs (40,424 mt), 40,161 oz gold, and 1,759,717 oz silver, with an estimated $62.6 million capex and total cash operating cost of $2.44/lb of copper equivalent metal, and pre-tax economics of US$87.86 million discounted net present value at 7.5% ("NPV7.5"), a 46.4% internal rate of return ("IRR"), and cumulative net free cashflow of US$152.98 million over the life of the mine.

The production highlighted in the PFS is made possible employing standard open-pit mining methods and a newly designed crush-grind-flotation-tank leach milling process engineered with a small enough footprint for siting on the Company's patented mining claims near the open pit.  The proximity of the mill to the open pit reduces the haulage distance of the ore to the crusher, which requires a smaller mining fleet in terms of truck count and size, and thereby reduces both capital and operating costs. The mill will produce two pay streams, a copper, gold, silver concentrate stream and a cementation copper stream, both of which will be shipped to market without the need of further processing or refining at the Empire site.

In addition to processing ore from the Empire open pit, the flotation circuit will be capable of recovering copper, gold, and silver as a concentrate from the high-grade sulphide vein material that exists below the open pit and was mined extensively until the early 1940s. The Empire team is currently finalizing a plan to advance the exploration of the deeper sulphide vein system with an eye on augmenting the open pit ore with feed from the higher-grade sulphide vein system below the pit. The planning includes driving an adit toward known sulphide mineralization and developing underground drilling stations along the length of the adit. Known sulphide mineralization includes the 8.38% copper interval intercepted in the 2021 core drilling program, which also assayed 1.31 grammes per tonne ("g/t") gold and 120 g/t silver. Historically mined grades from the sulphide vein system below the open pit were recorded as high as 8% copper, with smelter recoveries of the time recorded as averaging 3.64% copper, 1.64 g/t gold, and 54 g/t silver. Resources permitting, we hope to commence underground work during the 2024/2025 winter season.

The estimated capital requirements outlined in the PFS assume that the majority of the hard assets, i.e. milling equipment, rolling stock, and tankage, will be purchased as used or pre-owned, significantly reducing the costs compared to purchasing all new assets.  The Phoenix Copper team has already purchased the grinding circuit, the mine assay laboratory equipment, light duty rolling stock, disk filtration circuit, and numerous lesser components, all in good, pre-owned condition. The Company has also invested in a mine office, core logging facility, and an equipment storage facility in Mackay, all of which will service the mine.

 

Activities outside of the core Empire Mine property, which includes the Navarre Creek gold exploration property and the Redcastle and Bighorn cobalt exploration properties, are still progressing, albeit more slowly due to the workload required of the Empire mineral reserves statement and the PFS. Follow up drillhole targeting from the 2023 Navarre Creek drilling program was completed over the summer and included further evaluation of the 2023 drilling results, as well as field evaluation of the additional 400 acres of mining claims filed as a result of last year's drilling results. A second phase of drilling at Navarre Creek will be conducted as resources permit. The earn-in agreement with Electra Battery Materials on the Company's Redcastle cobalt project was also renewed and extended earlier this year.

Empire Proven and Probable Mineral Reserves

A Proven and Probable reserve estimate was completed by Hardrock Consulting in April 2024 and reported for the polymetallic Empire Mine open pit oxide deposit. The estimate reports Proven and Probable reserves in the Empire open-pit oxide deposit of 10,097,000 tonnes containing 49,677 mt of copper, 104,000 oz of gold, and 4,654,400 oz of silver, for a combined 66,467 mt of copper equivalent metal. It was estimated using assay data from 485 drill holes, extensive geological modelling, metallurgical recovery test work, geotechnical evaluation, and mine design.

Mineral Reserve Statement for Empire Mine, after Hard Rock Consulting April 2024

Fully diluted tonnes at a Net Smelter Return ("NSR") cut-off of $22.59/tonne

Classification

Tonnes

Copper

Gold

Silver

Copper Equivalent


(x1000)

%

lb (x1000)

gpt

oz (x1000)

gpt

oz (x1000)

%

lbs (x1000)

tonnes

Proven

7,515

0.49

81,070.56

0.38

90.9

14.42

3,483.70

0.68

111,995.19

  50,814

Probable

2,582

0.5

28,417.41

0.16

13.2

14.1

1,170.70

0.61

34,498.69

   15,652

Proven + Probable

10,097

0.49

109,487.97

0.32

104

14.34

4,654.40

0.66

146,493.89

    66,467

 

The mineral reserves reported herein for the Empire project have been estimated in a manner consistent with the NI 43-101 Committee of Mineral Reserves International Reporting Standards ("CRIRSCO"), of which both the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") and Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the "JORC Code") are members.

 

PFS - Summary of Economic Results

The economic analysis of the base case scenario for the Empire open-pit mine uses metal prices of $4.45/lb for copper, $2,325/oz for gold and $27.25/oz for silver. The economic model shows a pre-tax NPV7.5 of $87.86 million using a $22.59/tonne NSR cut-off, as well as a pre-tax IRR of 46.4%. Table 1 summarises the projected cashflow, NPV at varying rates, IRR, years of positive cash flows to repay the negative cash flow ("Payback Period"), and multiple of positive cash flows compared to the maximum negative cash flow ("Payback Multiple") on both after-tax and before-tax bases.

 

 

 

Project Evaluation Overview

After Tax

Before Tax

Cumulative Net Cashflow

$132.44

$152.98

NPV @ 5.0%; (millions)

$89.55

$105.44

NPV @ 7.5%; (millions)

$73.75

$87.86

NPV @ 10.0%; (millions)

$60.71

$73.29

Internal Rate of Return

40.2%

46.4%

Payback Period

1.66

1.41

Payback Multiple

2.92

3.21

Benefit Cost Ratio

7.61

8.87

Initial Capital

$62.60

$62.60

Max. Neg. Cashflow (millions)

-$69.09

-$69.09

 

PFS - Metallurgy and Process Design

3,502 feet (1,067 metres) of core from the Empire copper oxide deposit was sampled and evaluated for the metallurgical recovery of copper, gold, and silver. The results of the metallurgical test work, as presented in the PFS, show that a crush-grind-flotation-tank leach milling process provides the optimum metal recoveries for the cost. The flotation-leaching circuit that has been designed for the Empire open pit ore has a much smaller footprint than a classic heap leach design, allowing for the processing plant to be sited on the Company's patented (private) mining claims near the open pit. The proximity of the plant to the open pit will reduce overall operating costs by reducing the ore haulage distance. The improved haulage cycle-time gained from the shortened haulage distance also allows for the use of smaller, less expensive haul trucks.

In addition to the cost benefits of a smaller footprint plant sited on private land, the flotation-leaching circuit will be capable of processing sulphide material currently being explored elsewhere on the Empire property. From an environmental permitting standpoint, siting the processing plant on private land should help to simplify the overall permitting process.

The flotation and leaching metallurgical recovery results and reserve pit optimization parameters are shown in the table below. Optimization of the processing circuit is ongoing.

Reserve Pit Optimization Parameters (Metric tons)

Units

Cu

Au

Ag

Commodity Prices

$/oz or $/lb

$4.00

$1,788

$24.00

Flotation Process Recoveries





Flotation _ Cu Concentrate

%

33.0%

50.0%

36.0%

Concentrate (Payables)





Flotation_ Cu Concentrate (Au Payable based on grade)

%

95.0%

90-97%

95.0%

Cementation Process Recoveries





Cementation (Total Copper Recovery after Flotation)

%

90.0%

0.0%

0.0%

Treatment/Refining Charges





Copper Con. Refining

Ag $/oz

0.40



Copper Con. Refining

Au $/oz

4.00



Copper Con. Trucking & Shipping $/t conc

wet

$80.00



Copper Con. Treatment $/t conc

wet

$90.00








Copper Cementation Shipping $/lb

Cu $/lb

$0.02



Operating Costs


 

 


Mining Cost - Surface

$/t mined

$2.56



Mining Cost - Incremental Increase for each 20ft depth

$/t mined

$0.018



Processing Cost

$/t milled

$18.74



G&A

$/t milled

$2.20



Total Ore cost $/t milled

$/t milled

$20.94



Pit Slope Assumptions

Five sectors were modelled based on core logging with inter-ramp angles ranging from 42º to 45º

 

Outlook

While the copper price has come down from its spring 2024 high above $5.00/lb, it has managed to maintain a price above $4.00 despite the recent recalibration of the futures market.  Whether this is a result of the change in interest rates or in recent demand, it is clear that the long-term demand for copper will only increase as the world continues to demand sources of clean green energy, which requires the red metal at every turn in the process, from generation to distribution to end user commodities.  Achieving a green economy is simply not possible without a growing supply of copper.

Perhaps as important to the Empire Mine project as the copper price is the price of both gold and silver. The processing circuit designed to recover copper at Empire is also designed to recover the gold and silver ounces hosted in the Empire reserves. At today's spot prices of $2,647/oz gold and $31.50/oz silver, the gross revenue of the anticipated precious metal recovery at Empire is roughly $161,000,000. The price of gold has steadily increased over 34% in the past 12 months and silver has increased 28% in the same period. The importance of the new processing design at Empire that enables the recovery of precious metals should not be underestimated.

Now that we have developed Proven and Probable mineral reserves, our focus is on completing all of the necessary detailed engineering required to successfully permit and construct the open pit mine. As our process design includes the siting of the plant on private, patented mining claims, we will reduce the operational footprint on public lands, further demonstrating how ESG considerations are at the heart of our operation. As the regulatory authorities looked closely at our operating plan application two years ago, I am confident that in due course the plan will be approved. 

In the meantime, we will complete the necessary engineering and continue to source the plant and equipment required to bring the mine into production. We will also be stepping up the exploration and development of the Empire sulphide vein system, now that we have a milling design capable of processing that material.     

Conclusion

The Company's focus thus far in 2024 has been clearly aimed at completing the Empire mineral reserve statement and the PFS.  Both reports were the culmination of extensive geological and engineering efforts by the Phoenix team. The result of that extensive effort is an economically feasible and environmentally conscious mine plan and processing circuit that not only allows for the production of metals from the Company's open pit reserve, but also from future high-grade sulphide mineralization below the open pit.  The design elements in the PFS move the Company many steps forward to becoming a US-based producer of metals vital to life as we know it. Our team of engineers, geoscientists, and industry consultants have done an admirable job in completing work necessary to move the Company into the next stage of development.

As I have said before, and will continue to say, thank you to all of our professional staff, consultants and advisors, all of whom work tirelessly to accomplish our common goal of metal production. And I would like to thank our community liaisons, shareholders, and directors for their considerable support. I am truly grateful to work with such a diverse and remarkably talented group of individuals.

 

Ryan McDermott

Chief Executive Officer

 

 

 


ESG & Sustainability Committee Chairman's Report

 

It is a pleasure to provide an update on the activities of our Environmental, Social & Governance ("ESG") & Sustainability team. We last reported shortly after receiving the results of our second Digbee ESG submission for the Empire Mine, once again receiving an overarching score of 'A', a combination of a corporate score of 'BB' with the Empire Mine Exploration Project achieving a score of 'A'. We use the Digbee questionnaire as a framework for building our own internal protocols for auditing our operations as they expand. In this way, we can more proactively measure our ESG performance targets, and ensure they are met. One of our aims is to investigate ways to link certain KPIs to remuneration. We want to do this in a practical way that genuinely rewards employees and teams that contribute towards our long-term strategic goals.

Our Company culture is focused on environmental stewardship and social responsibility and in communicating clearly with our stakeholders. To this end, we continue to work closely with the Konnex Community Advisory Team ("KCAT"), a team of independent individuals with diverse experience who act as liaison between the Company and the community. Amongst their responsibilities, the KCAT review applications for community funding and decide how the annual Phoenix Copper community budget is spent. So far this year we have provided sponsorship for several community activities and awarded funds to high school graduates to assist with college fees.

Ahead of hiring and relocating a large work force to Mackay, we have held meetings with representatives from the City of Mackay, Custer County, local Economic Development and the Department of Commerce in relation to housing. Our goal is to build better cities and protect the surrounding agricultural community. We have multiple options that will require thought and preparation. We are working with the local municipalities to identify opportunities to improve city infrastructure, particularly water and sewage, as these will need to be updated to support development within city limits. There are several ways in which this can be achieved, including applying for local and federal grants.

We have maintained and built our relationship with Caterpillar, who offer a mechanical programme to current and future employees. We have recently supported the local school in implementing a similar programme for high school students. In May, the school held a groundbreaking event for a new diesel mechanic and animal science building which will offer new career paths to current and future students. Of particular value to Phoenix is the early training of future mechanics.

We have updated several of our Company policies to ease the due diligence process for external investors. In addition, we continue to improve Company practices, such as strengthening cyber security.

We look forward to providing further updates on our activities in the future. All comments and suggestions to our ESG team are welcomed: esg@phoenixcopper.com.

 

Catherine Evans

Non-Executive Director

 

 

 

 

 

Financial Overview

 

The Group reports a loss for the Period of $1.10 million (2023: loss of $0.63 million). This includes a non-cash foreign exchange loss on sterling denominated assets of $4,128 (2023: foreign exchange gain of $96,172), and a charge of $34,239 (2023: $18,991) relating to non-cash share based payments attributable to warrants or options extended or amended during the Period, and which amount is simultaneously credited back to the retained deficit. Net assets at 30 June 2024 totalled $48.55 million (2023: $37.39 million), including $42.11 million (2023: $35.88 million) relating to the Empire Mine, and $2.72 million (2023: $2.75 million) in cash.

The Company reports a loss for the Period of $47,220 (2023: profit of $309,759), and net assets of $55.16 million (2023: $41.81 million). During the Period, the Company charged its operating subsidiaries $450,000 (2023: $450,000) in respect of management services provided, and $910,196 (2023: $837,108) in respect of interest on its inter-company loans, the latter eliminating on consolidation. At 30 June 2024, the Company's loan to Konnex Resources Inc ("Konnex"), owner of the Empire Mine, stood at $31.20 million (2023: $27.03 million), and the loan to KPX Holdings Inc ("KPX"), the Company's Idaho registered intermediate holding company, stood at $6.27 million (2023: $2.60 million). These loans will be repaid from operating cash flows in due course and are intended, together with royalties receivable from Konnex, to form a platform for a future proposed dividend policy to return money to shareholders.

During the Period, the Company issued 60,030,345 ordinary shares of no par value ("Ordinary Shares"), raising $8.9 million, pursuant to a placing subscription and retail offer, subscription for 10-year corporate bonds, partial conversion of borrowings, and warrant exercises. Since the Period-end a further 3,081,137 Ordinary Shares have been issued, raising $0.63 million, pursuant to the partial conversion of borrowings. The outstanding share capital of the Company is currently 188,040,104 Ordinary Shares.

On 27 December 2023 the Company created a class of corporate copper bonds ("Bonds") in an authorised amount of $300 million. $110 million in principal value of Bonds were issued and deposited with The Bank of New York Mellon ("BNYM") as Settlement Agent, pending onward transfer to Bonds investors. During the Period the Company received an initial subscription for $80 million of Bonds from NIU Invest, $5 million of which were drawn down. Despite instructing BNYM to issue the second tranche of bonds totalling $5 million in early July, these bonds were not drawn down due to ongoing discussions with NIU Invest regarding the Company's updated economic model, prepared in association with the Company's PFS.

Following the publication of the PFS on 19 September 2024, the Company has recommenced discussions with NIU Invest regarding the Company's cash flow requirements of the PFS's economic model, and a revised drawdown schedule for future tranches of copper bonds. Further draw downs will be announced as appropriate.

The Bonds have a final maturity of 10 years, are not convertible, are secured on the Group's interests in the Empire Mine, and are listed on The International Stock Exchange in the Channel Islands ("TISE"), under the ticker PHCOUSDN. The Bonds pay a floating rate coupon calculated as to the higher of a copper price coupon linked to the copper price on the London Metal Exchange, or an interest rate coupon linked to the US Federal Discount Rate.

On 2 March 2024 the Company refinanced a $2 million short-term unsecured funding arrangement into an 18-month term loan, repayable over 15 months following an initial 90-day repayment holiday, unless the Company redeems the loan earlier. The loan remains unsecured and is potentially convertible into approximately 10.5 million Ordinary Shares.

 

The Company's shares are listed on AIM, operated by the London Stock Exchange under the ticker PXC, and are also admitted to trading on New York's OTCQX Market under the ticker PXCLF, and in the form of American Depositary Receipts ("ADRs") under the ticker PXCLY, with each ADR comprising 10 Ordinary Shares. BNYM sponsored the ADR Program and acts as ADR depositary, custodian and registrar.

The Directors recognise the importance of sound corporate governance and have applied the Quoted Companies Alliance's Corporate Governance Code 2018. The Company's Corporate Governance Statement dated 2024, and the Company's 2023 Sustainability Report, can be viewed on the Company's website at https://phoenixcopperlimited.com.

 

 

Richard Wilkins

Chief Financial Officer



 

 

 

 


 


Condensed consolidated income statement


 


Unaudited

Unaudited

Audited

 


 


6 months to

 30 June

 2024

6 months to

 30 June

 2023

12 months to

31 December

2023


 


 

 

 


 

Note

$

$

$




 

 

 


Continuing operations

 





Revenue

        3

-
-

-

-


Exploration and evaluation expenditure


-

(28,839)

(28,839)


Gross loss


-

(28,839)

(28,839)


 






Administrative expenses

       4

(1,098,146)

(617,788)

(1,564,759)


Other operating expenses

9

-

-

(14,372)








Loss from operations

 

(1,098,146)

(646,627)

(1,607,970)








Finance income


5,321

21,258

34,196


Finance expenses


(7,913)

-

-








Loss before taxation

 

(1,100,738)

(625,369)

(1,573,774)


Taxation

 

-

-

-


Loss for the period


(1,100,738)

(625,369)

(1,573,774)


 






Loss attributable to:






-     Owners of the parent company


(1,072,109)

(612,262)

(1,535,494)


-     Non-controlling interests


(28,629)

(13,107)

(38,280)




(1,100,738)

(625,369)

(1,573,774)








Basic and diluted loss per share - US cents

           5

(0.71)

(0.50)

                    (1.24)

 

The revenue, expenditures and operating result for each period is derived from acquired and continuing operations in North America and the United Kingdom.

 

 

 

 

 

 

 

 

 

 

Condensed consolidated statement of comprehensive income

Unaudited

Unaudited

Audited

 

6 months to

 30 June

 2024

6 months to

 30 June

2023

12 months to

31 December

2023


$

$

$



 

 

Loss for the period and total comprehensive income for the period

(1,100,738)

(625,369)

(1,573,774)





Total comprehensive income for the period attributable to:




Owners of the parent company

(1,072,109)

(612,262)

(1,535,494)

Non-controlling interests

(28,629)

(13,107)

(38,280)


(1,100,738)

(625,369)

(1,573,774)

 

 

 

 

Condensed consolidated statement of

financial position

 

Unaudited

Unaudited

Audited


Note

30 June

2024

30 June

2023

31 December 2023


 

$

$

$

Non-current assets





Property, plant and equipment - mining property

6

42,105,065

35,876,914

38,432,522

Intangible assets

7

356,805

347,000

356,805

Total non-current assets

 

42,461,870

36,223,914

38,789,327


 




Current assets

 




Trade and other receivables

8

10,991,243

1,433,783

1,434,280

Finance assets

9

4,191

18,563

4,191

Cash and cash equivalents

 

2,717,492

2,749,407

283,721

Total current assets

 

13,712,926

 

4,201,753

 

1,722,192


 




Total assets

 

56,174,796

 

40,425,667

 

40,511,519


 




Current liabilities

 




Trade and other payables

10

149,488

35,321

426,723

Borrowings and other liabilities

11

2,682,525

2,240,000

2,238,501

Total current liabilities

 

2,832,013

2,275,321

2,665,224

 

 




Non-current liabilities

 




Borrowings

12

4,139,884

-

-

Provisions

13

657,702

757,702

657,702

Total non-current liabilities

 

4,797,586

757,702

657,702

 










Total liabilities


7,629,599

3,033,023

3,322,926

 





Net assets


48,545,197

37,392,644

37,188,593






Equity





Share capital

14

-

-

-

Share premium account

 

53,770,810

44,889,817

45,390,217

Retained deficit


(5,204,618)

(7,529,980)

(8,209,258)

Translation reserve


(18,588)

(18,588)

(18,588)

Capital and reserves attributable to owners of the parent company


48,547,604

37,341,249

37,162,371

Non-controlling interests


(2,407)

51,395

26,222

Total equity


48,545,197

37,392,644

37,188,593

 

 

 

Condensed consolidated statement of changes in equity

 

Ordinary shares

Share premium

Retained loss

Foreign exchange

translation reserve

Total

Non-controlling interest

Total equity


 

$

$

$

$

$

$

$

At 1 January 2023


-

44,878,927

(7,086,480)

(18,588)

37,773,859

64,502

37,838,361

Loss for the period


-

-

(612,262)

-

(612,262)

(13,107)

(625,369)

Total comprehensive income for the period


-

-

(612,262)

-

(612,262)

(13,107)

(625,369)

 









Shares issued in the period


-

10,890

-

-

10,890

-

10,890

Share issue expenses


-

-

-

-

-

-

-

Share-based payments


-

-

168,762

-

168,762

-

168,762

Total transactions with owners


-

10,890

168,762

-

179,652

-

179,652

 









At 30 June 2023


-

44,889,817

(7,529,980)

(18,588)

37,341,249

51,395

37,392,644

Loss for the period


-

-

(923,232)

-

(923,232)

(25,173)

(948,405)

Total comprehensive income for the period


-

-

(923,232)

-

(923,232)

(25,173)

(948,405)

 









Shares issued in the period


-

500,400

-

-

500,400

-

500,400

Share issue expenses


-

-

-

-

-

-

-

Share-based payments


-

-

243,954

-

243,954

-

243,954

Total transactions with owners


-

500,400

243,954

-

744,354

-

744,354

At 31 December 2023


-

45,390,217

(8,209,258)

(18,588)

37,162,371

26,222

37,188,593

Loss for the period


-

-

(1,072,109)

-

(1,072,109)

(28,629)

(1,100,738)

Total comprehensive income for the period


-

-

(1,072,109)

-

(1,072,109)

(28,629)

(1,100,738)

 









Shares issued in the period


-

8,869,790

-

-

8,869,790

-

8,869,790

Share issue expenses


-

(489,197)

-

-

(489,197)

-

(489,197)

Share-based payments


-

-

4,076,749

-

4,076,749

-

4,076,749

Total transactions with owners


-

8,380,593

4,076,749

-

12,457,342

-

12,457,342

 









At 30 June 2024


-

53,770,810

(5,204,618)

(18,588)

48,547,604

2,407

48,545,197

Condensed consolidated statement of cash flows

 

 

Unaudited

Unaudited

Audited

 

6 months to

 30 June

 2024

6 months to

 30 June

 2023

12 months to 31 December 2023

 

$

$

$

 

 

 

Loss before taxation


(1,100,738)

(625,369)

(1,573,774)

Adjustments for:





Share-based payments


34,239

18,991

18,991

Finance costs


32,340

-

-

Fair value adjustment to financial asset


-

-

14,372



(1,034,159)

(606,378)

(1,540,411)

Changes in working capital





(Increase)/decrease in trade and other receivables


(1,967,328)

172,175

100,226)

(Decrease) in trade and other payables


(277,234)

(537,148)

(97,245)

Cash (used in)/generated from operating activities


(3,278,721)

(971,351)

(1,537,430)






Investing activities





Purchase of intangible assets


-

-

(9,805)

Purchase of property, plant and equipment                           


(2,625,118)

(2,622,914)

(5,034,567)

Net cash outflow from investing activities


(2,625,118)

(2,622,914)

(5,044,372)






Cash flows from financing activities





Proceeds from the issuance of ordinary shares


3,559,994

10,890

511,290

Share-issue expenses


(489,198)

-

-

Preliminary bond-issue expenses


-

(71,451)

-

Proceeds from the issue of 10-year bonds


4,750,000

-

-

Proceeds from new short-term loans


899,553

2,000,000

2,000,000

Repayment of short-term loans


(138,212)

-

-

Payment of interest


(54,527)

-

-

Repayment of deferred liability


(190,000)

(260,000)

(310,000)

Net cash inflow from financing activities


8,337,610

1,679,439

2,201,290






Net increase/(decrease) in cash and cash equivalents


2,433,771

(1,914,826)

(4,380,512)

Cash and cash equivalents at the beginning of the period


283,721

4,664,233

4,664,233

Cash and cash equivalents at the end of the period


2,717,492

2,749,407

283,721






 

An amount of $720,215, (30 June 2023: $149,770; 31 December 2023: $412,716) in respect of the charge for share-based payments was capitalised into mining property. An amount of $327,210 of loan arrangement fees and interest has been capitalised into mining property (30 June 2023: $nil; 31 December 2023: $nil).

An amount of $3,322,295 (30 June 2023: $nil; 31 December 2023: $nil) in respect of the charge for share-based payments was taken to bond issue expenses arising from the issue of a 10-year bonds.

An amount of $4,909,796 (30 June 2023: $nil; 31 December 2023: $nil) arising from the issue of share capital was taken to bond issue expenses. An amount of $400,000 (30 June 2023: $nil; 31 December 2023: $nil) of share capital was issued in respect of partial conversion of borrowings. An amount of $642,456 of bond issue expenses was deducted from the 10-year bond liability.

The loss before taxation includes a foreign exchange loss of $4,128 (30 June 2023: a gain of $96,172; 31 December 2023: a gain of $82,634) related to sterling denominated cash balances.

1.    Basis of preparation and principal accounting policies

This condensed consolidated interim financial information was approved for issue by the Board on 25 September 2024.

This condensed consolidated interim financial information has not been audited and does not include all of the information required for full annual financial statements. While the financial figures included within this interim report have been computed in accordance with IFRS applicable to interim periods, this report does not contain sufficient information to constitute an interim financial report as set out in International Accounting Standard 34: Interim Financial Reporting.

Basis of consolidation

Principles of consolidation

Subsidiaries are all entities (including structured entities) over which the Group has control. The Group controls an entity when the Group is exposed to, or has rights to, variable returns from its involvement with the entity and has the ability to affect those returns through its power to direct the activities of the entity. Subsidiaries are fully consolidated on the date on which control is transferred to the Group. They are deconsolidated from the date that control ceases.

The acquisition method of accounting is used to account for business combinations by the Group.

Intercompany transactions, balances and unrealised gains of transactions between Group companies are eliminated. Unrealised losses are also eliminated unless the transaction provides evidence of an impairment to the transferred asset.

Accounting policies of subsidiaries have been changed where necessary to ensure consistency with the policies adopted by the Group.

Non-controlling interests in the results and equity of subsidiaries are shown separately in the consolidated income statement, consolidated statement of comprehensive income, statement of changes in equity and consolidated statement of financial position respectively.

2.    Information on the Group

 

Phoenix Copper Limited (the "Company") and its subsidiary undertakings (the "Group") are engaged in exploration and mining activities, primarily precious and base metals, primarily in North America. The Company is domiciled and incorporated in the British Virgin Islands on 19 September 2013 (registered number 1791533). The address of its registered office is OMC Chambers, Wickhams Cay 1, Road Town, Tortola VG1110, British Virgin Islands. The Company is quoted on London's AIM (ticker: PXC) and trades on New York's OTCQX Market (ticker: PXCLF; ADR ticker PXCLY).

 

3.    Revenue

 

The Group is not yet producing revenues from its mineral exploration and mining activities. During the period the Company charged its subsidiary entities $450,000 (30 June 2023: $450,000; 31 December 2023: $900,000) in respect of management services provided.

 

4.    Administrative expenses

 

Administrative expenses include a foreign exchange loss of $4,128 (30 June 2023: a gain of $96,172; 31 December 2023: a gain of $82,634).

 

Administrative expenses also include share-based payments of $34,239 (30 June 2023: $18,991; 31 December 2023: $18,991). The related credits to equity are taken to the retained loss.

 

 

5.     Loss per share

 

Unaudited

Unaudited

Audited

 

 

6 months to

 30 June

 2024

6 months to

 30 June

2023

12 months to 31 December 2023


 

$

$

$


 

 

 

 

Loss for the period attributable to equity holders of the parent company


(1,072,109)

(612,262)

(1,535,494)








Number

 

Number

 

Number 

Weighted average number of ordinary shares for the purposes of basic and diluted loss per share


 

150,687,794

 

122,668,401

123,483,143






Loss per share - basic and diluted (US cents)


(0.71)

             (0.50)

(1.24)

 

 

 



 

Non-current assets

 

 

 

 

 

6.    Property, plant and equipment - mining property

 

 

Mining Property


 

$

Cost or valuation



At 1 January 2023


33,104,230

Additions


2,772,684

At 30 June 2023


35,876,914

Additions


2,555,608

At 31 December 2023


38,432,522

Additions


3,672,543

At 30 June 2024


42,105,065







Depreciation



At 30 June 2023, 31 December 2023 and 30 June 2024


-




Net book value:



30 June 2023


35,876,914

31 December 2023


38,432,522

30 June 2024


42,105,065

 

Mining property assets relate to the past producing Empire Mine copper - gold - silver - zinc project in Idaho, USA. The Empire Mine has not yet recommenced production and no depreciation has been charged in the statement of comprehensive income. There has been no impairment charged in any period due to the early stage in the Group's project to reactivate the mine.

 

 

 


 

7.    Intangible assets

 

 

 


 

Exploration and evaluation expenditure

 


 

$

 

Cost or valuation



 

At 1 January 2023


347,000

 

Additions


-

 

At 30 June 2023


347,000

 

Additions


9,805

 

At 31 December 2023


356,805

 

Additions


-

 

At 30 June 2024


356,805

 

 

Net book value:



30 June 2023


347,000

31 December 2023


356,805

30 June 2023


356,805

 

Exploration and evaluation expenditure relates to the Bighorn and Redcastle properties on the Idaho Cobalt Belt in Idaho, USA. The Bighorn property is owned by Salmon Canyon Resources Inc. The Redcastle property is owned by Borah Resources Inc. Both companies are wholly owned subsidiaries of KPX Holdings Inc, a wholly owned subsidiary of the parent entity, and each of which are registered and domiciled in Idaho. The Redcastle property is subject to an Earn-In Agreement with First Cobalt Idaho, a wholly owned subsidiary of Electra Battery Materials Corporation of Toronto, Canada.

 

 

 

 

 

 

 

 

 

 

 

 

 

8.    Trade and other receivables

 

Unaudited

Unaudited

Audited


 

30 June

2024

30 June

2023

31 December 2023


 

$

$

$






Other receivables


1,304,561

193,952

382,179

Preliminary bond issue expenses


9,636,852

1,181,617

882,814

Prepaid expenses


49,830

58,214

169,287



10,991,243

1,433,783

1,434,280

 

There were no receivables that were past due or considered to be impaired. There is no significant difference between the fair value of the other receivables and the values stated above. The preliminary bond issue expenses relate to the issue of 10-year corporate copper bonds and will be deducted from the proceeds of the bonds and amortised to finance expenses over the expected life of the bonds (see also note 12).

 

 

9.

Financial assets

 

Unaudited

Unaudited

Audited



 

6 months to

 30 June

 2024

6 months to

 30 June

2023

12 months to 31 December

 2023



 

$

$

$



 

 

 

 

 

Quoted investments

 

4,191

18,563

4,191

 

Quoted investments represent 11,111 shares in Toronto-based Electra Battery Materials Corporation. The shares have been valued at market price as at 30 June 2024. A fair value adjustment of $nil (30 June 2023: $nil; 31 December 2023: $14,372) has been charged to other operating expenses.

 

 

10.  Trade and other payables

 


 

30 June

2024

30 June

2023

31 December 2023


 






Trade payables


126,777

19,175

410,448

Other payables



22,712

16,146

16,275



149,489

35,321

426,723

 

 

 

 

 

 

 

 

 

 

 

 

11.  Borrowings and other liabilities

 


 

30 June

2024

30 June

2023

31 December 2023


 






Current liabilities


Short-term borrowings


Deferred consideration




 

In 2023 the Company entered a short-term unsecured funding arrangement of $2,000,000, with an initial fixed 4% coupon, which was subsequently modified on several occasions. Under the terms of the agreement the term of the loan was extended to 23 March 2024, at an interest rate of 1% per month. On 2 March 2024 the Company refinanced the facility into an 18-month term loan, repayable over 15 months following an initial 90-day repayment holiday, unless the Company redeems the loan earlier. The loan remains unsecured and attracts interest at 15% per annum. The loan is potentially convertible into approximately 10.5 million new ordinary shares in the Company.

 

In April 2021 the Group entered into an agreement with Mackay LLC to acquire 1% of the 2.5% net smelter royalty payable on mining leases on the Empire Mine in Idaho, USA. Consideration payable to Mackay LLC was $nil (30 June 2023: $240,000; 31 December 2023: $190,000).

 

 

 

 

 

 


 

 

12.  Borrowings

 

Unaudited

Unaudited

Audited


 

30 June

2024

30 June

2023

31 December 2023


 






Non-Current liabilities


Corporate Copper Bonds (Secured)


Value of 10-year bonds issued


Discount on initial subscription


Bond issue expenses


Effective interest rate



 

On 27 December 2023 the Company created a class of corporate copper bonds ("Bonds") in an authorised amount of $300 million. $110 million in principal value of Bonds were issued and deposited with The Bank of New York Mellon as Settlement Agent, pending onward transfer to Bonds investors.

During the period the Company received an initial subscription for $80 million of Bonds from NIU Invest SE. The Company paid the Bonds investor an arrangement fee by way of an issue of 33.88 million new ordinary shares of no-par value in the Company, and a drawdown fee by way of warrants to subscribe at no cost for a further 22.59 million of new ordinary shares. The warrants will vest over drawdown of the first $30 million of Bonds, the principal value of which will also be discounted by 5%. As of 30 June 2024, $5 million of Bonds have been drawn down and transferred to the Bonds investor and discussions regarding the timing of future drawdowns remain ongoing. $9.6 million of bond issue expenses will be amortised against the value of further Bonds as and when drawn down (see Note 8).

The Bonds are not convertible, are secured on the Group's interests in the Empire open pit mine, and are listed on The International Stock Exchange in the Channel Islands ("TISE"), under the ticker PHCOUSDN. The Bonds have a final maturity of 10 years with Bond investor option to request redemption at principal value after six years, and the Company's option to offer early redemption at a 10% premium to principal value after five years. The Bonds will remain listed on TISE until the earlier of redemption or maturity.

The Bonds pay a floating rate coupon subject to a minimum of 8.5% per annum and a maximum of 20%. The coupon is calculated as to the higher of a copper price coupon linked to the copper price on the London Metal Exchange, or an interest rate coupon linked to the US Federal Discount Rate. The coupon is only payable on the principal value of Bonds drawn down.

 

 

 

 

 

 

 

 

13.  Provisions

 

Unaudited

Unaudited

Audited


 

30 June

2024

30 June

2023

31 December 2023


 

$

$

$






Decommissioning provision


-

100,000

-

Royalties payable


657,702

657,702

657,702



657,702

757,702

657,702

 

The provision for royalties payable of $657,702 arises from a business combination in 2017 and comprises potential royalties payable in respect of future production at the Empire Mine. This liability will only be payable if the Empire Mine is successfully restored to production and will be deducted from the royalties payable. The amount of the provision will be reassessed as exploration work continues and when commercial production commences.

 

The provision of $100,000 for decommissioning the Empire Mine was released in 2023. All current environmental reclamation and rehabilitation costs are now covered by insurance bonds and other deposits contracted in the United States by Konnex Resources as and when required.

 

 

 

 

 

 

  

 

 

 

 

 

14.  Share capital

 

Unaudited

Unaudited

Audited


 

30 June

2023

30 June

2023

31 December 2022


 

Number

Number

Number

Allotted and issued





Ordinary shares with no par value


184,958,967

122,678,622

124,928,622

 

The Company does not have an authorised capital and is authorised to issue an unlimited number of no-par value shares of a single class.

 

In the period Company issued 60,030,345 ordinary shares at an average issue price of $0.148 per share to raise $8.9 million in respect of a placing, subscription and retail offer, subscription for 10-year corporate bonds (see also Notes 8 and 12), partial conversion of borrowings, and warrants exercised.  

 

Since the period end a further 3,081,137 ordinary shares have been issued pursuant to the partial conversion of borrowings raising $0.63 million and with an average issue cost of $0.204 per share.

 

15.  Events after the reporting date

 

In July 2024 the Company renewed its Earn-in Agreement in respect of the Redcastle cobalt property with First Cobalt Idaho, a wholly owned subsidiary of Electra Battery Materials (TSX.V: ELBM; NASDAQ: ELBM). The renewal extends the two main exploration expenditure commitments totalling $3 million by two years, to 2026 and 2028 respectively.


 

 

 

 


 

 

Environmental, Social, and Corporate Governance

Phoenix is committed to meeting and exceeding the environmental standards required by law as a core value of the Company. The baseline environmental data collected to date will be used to further the permitting process, but as importantly, will be used as the building blocks for the Company's ongoing Environmental, Social, and Corporate Governance ("ESG") platform, overseen by the Company's ESG & Sustainability Committee. The Company has recently published its inaugural Sustainability Report, which can be viewed on the Company's website.

Market Abuse Regulation (MAR) Disclosure

The Company deems the information contained within this announcement to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014, which has been incorporated into UK law by the European Union (Withdrawal) Act 2018. Upon the publication of this announcement via the Regulatory Information Service, this inside information is now considered to be in the public domain.

 

Contacts

For further information please visit https://phoenixcopperlimited.com, or contact:

 

Phoenix Copper Limited

Ryan McDermott

Brittany Lock

Paul de Gruchy

Richard Wilkins

Tel: +1 208 954 7039 

Tel: +1 208 794 8033

Tel: +44 7484 203720

Tel: +44 7590 216 657 

SP Angel Corporate Finance LLP (Nominated Adviser)

David Hignell / Caroline Rowe / Devik Mehta

Tel: +44 20 3470 0470

Tavira Financial Limited (Joint Broker)

Jonathan Evans / Oliver Stansfield

 

Tel: +44 20 7100 5100

Zeus Capital Limited (Joint Broker)

Harry Ansell / Katy Mitchell

Tel: +44 20 7220 1666

Panmure Liberum Limited (Joint Broker)

Mark Murphy / Kieron Hodgson

Tel: +44 20 7886 2500

EAS Advisors (US Corporate Adviser)

Matt Bonner / Rogier de la Rambelje

Tel: +1 (646) 495-2225

BlytheRay
(Financial PR)

Tim Blythe / Megan Ray

Tel: +44 20 7138 3204

 

Notes

Phoenix Copper Limited is an emerging producer and exploration company specialising in base and precious metals, with an initial focus on copper, gold, and silver extraction from an open-pit mining operation within the United States.

Located in the historic Alder Creek mining district near Mackay, Idaho, Phoenix's flagship asset is the Empire Mine, in which the Company holds an 80% ownership stake. The historic Empire underground mine, located beneath the surface of the Company's proposed open pit, boasts a rich history of producing high-grade copper, gold, silver, zinc, and tungsten.

Since 2017, Phoenix has executed extensive drilling initiatives, resulting in an expansion of the Empire Open-Pit resource by over 200%. In May 2024 the Company published its inaugural mineral reserve statement for the Empire Open-Pit Mine. Proven and Probable mineral reserves are 10.1 million tonnes containing 109,487,970 lbs of copper, 104,000 oz of gold and 4,654,400 oz of silver. This reserve was estimated using assay data from 485 drill holes, extensive geological modelling, metallurgical recovery test work, geotechnical evaluation, and mine design. The reserve represents a combined 66,467 tonnes of copper equivalent metal.

In addition to the Empire Mine, Phoenix's holdings in the district also encompass the Horseshoe, White Knob, and Blue Bird Mines, all of which have been producers of copper, gold, silver, zinc, lead, and tungsten from underground operations, a new high-grade silver and lead orebody at Red Star, and the Navarre Creek gold exploration project, which was first drilled in 2023. The Company's land package at Empire spans 8,434 acres (34 sq km).

Phoenix also owns two cobalt properties situated along the Idaho Cobalt Belt to the north of Empire. An Earn-In Agreement has been established concerning one of these properties.

Phoenix is listed on London's AIM (PXC), and trades on New York's OTCQX Market (PXCLF and PXCLY (ADRs)). More details on the Company, its assets and its objectives can be found on PXC's website at https://phoenixcopperlimited.com/

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 