LUCA DISCOVERS MULTIPLE NEW HIGH-GRADE ORE SHOOTS AT TAHUEHUETO MINE, DURANGO, MEXICO
- New high-grade breccia ore shoot discovered within the El Creston vein system located approximately 60m below the active mine workings of Level 23; discovery drill hole returned 9.4m of 5.21 g/t AuEq**within a larger 13.9m zone of 3.90 g/t AuEq
- An additional new high-grade breccia ore shoot discovered at an untested area of the Creston FW Vein north of current underground workings, with three (3) new drill holes returning results including: 4.8m of 5.62 g/t AuEq, 6.9m of 4.10 g/t AuEq and 5.1m of 5.62 g/t AuEq, including 2.4m of 9.37 g/t AuEq
- 20 underground drillholes completed to date as part of a 5,000m Phase 1 program targeting near-mine resource expansion
- Additional mineral potential identified in underexplored zones – results to inform updated mineral resource and near and medium term Tahuehueto mine plans
-
Surface drilling is set to begin shortly at the
Santiago deposit – one of 18 identified mineralized veins on the Tahuehueto Property – first exploration this target has seen since 2008
Drillhole DDH24-216 targeted a previously untested zone, approximately 60m below the active mine workings of Level 23, and intersected a new high-grade brecciated zone within the El Creston vein system that returned 9.4m of 0.48 g/t Au, 166.63 g/t Ag, 1.46% Cu, 2.00% Pb, and 0.71% Zn (5.21 g/t Au Eq) within a larger 13.9m zone of 0.43 g/t Au, 121.09 g/t Ag, 1.10% Cu, 1.40% Pb, and 0.51% Zn (3.90 g/t AuE Eq) from 124.6m.
Drillhole DDH25-221 targeted the strike extension of the Creston FW Vein north of previously drilling, in an area approximately 65 horizontal metres from active mine workings of Level 12, and intersected a new high-grade brecciated zone within the El Creston vein system that returned 6.9m of 1.90 g/t Au, 68.40 g/t Ag, 0.19% Cu, 1.40% Pb, and 2.16% Zn (4.10 g/t AuEq) from 119.9m.
Drillhole DDH25-222 was drilled into an undertested area of the Creston FW Vein north of current underground workings, in an area approximately 80 horizontal metres from active mine workings of Level 12, and intersected a new high-grade brecciated zone within the El Creston vein system that returned 4.8m of 3.15 g/t Au, 121.51 g/t Ag, 0.58% Cu, 0.27% Pb and 0.41% Zn (5.62 g/t AuEq) from 117.7m.
Drillhole DDH25-224 was, similar to DDH25-222, drilled into an undertested area of the Creston FW Vein north of current underground workings, in an area approximately 120 horizontal metres from active mine workings of Level 12, and intersected a new high-grade brecciated zone within the El Creston vein system that returned 5.1m of 0.76 g/t Au, 88.19 g/t Ag, 0.42% Cu, 3.36% Pb and 6.85% Zn (5.62 g/t AuEq) from 134.4m, including 2.4m of 1.23 g/t Au, 111.51 g/t Ag, 0.71% Cu, 6.86% Pb and 11.80% Zn (9.37 g/t AuEq).
Figure 1 presents the location of the drillholes and Tables 1 and 2 provide summary analytical results and drill collar details, respectively.
Twenty (20) holes have been completed to date for over 4,500m as part of the current Phase 1 exploration drilling campaign, which has a primary resource development objective to determine both vertical and lateral extents of known mineralization within the
With the success of the Phase 1 exploration campaign, a Phase 2 underground drilling program consisting of an additional 5,000m of drilling has been approved and has commenced. Phase 2 will target the extension of the Creston Vein System to the north and will be bolstered by surface drilling in and around the underexplored Santiago Deposit, located ~950m from the eastern extent of the existing Tahuehueto mine development. The Santiago Deposit (See Company News Release of
Table 1: Highlighted Diamond Drill Assay Results from DDH24-216 through DDH2 5-224
Hole ID |
From (m) |
To (m) |
Interval (m)* |
Au (g/t) |
Ag (g/t) |
Cu (%) |
Pb (%) |
Zn (%) |
AuEq ** |
DDH24-216 |
124.6 |
138.5 |
13.9 |
0.43 |
121.09 |
1.10 |
1.40 |
0.51 |
3.90 |
including |
124.6 |
134.0 |
9.4 |
0.48 |
166.63 |
1.46 |
2.00 |
0.71 |
5.21 |
DDH24-217 |
158.8 |
159.3 |
0.5 |
0.34 |
79.20 |
1.31 |
0.04 |
0.05 |
3.03 |
DDH25-218 |
175.5 |
177.0 |
1.5 |
0.23 |
28.30 |
0.23 |
0.44 |
1.12 |
1.37 |
DDH25-219 |
175.5 |
178.6 |
3.1 |
0.28 |
65.99 |
0.85 |
0.34 |
0.55 |
2.47 |
DDH25-220 |
199.5 |
202.5 |
3.0 |
0.08 |
58.25 |
0.56 |
0.24 |
0.32 |
1.69 |
and |
208.0 |
214.5 |
6.5 |
0.23 |
70.98 |
0.57 |
0.13 |
0.10 |
1.91 |
DDH25-221 |
119.9 |
132.5 |
12.6 |
1.11 |
40.51 |
0.12 |
0.87 |
1.77 |
2.60 |
including |
119.9 |
126.8 |
6.9 |
1.90 |
68.40 |
0.19 |
1.40 |
2.16 |
4.10 |
DDH24-222 |
113.5 |
129.5 |
16.0 |
1.50 |
67.03 |
0.38 |
0.37 |
0.65 |
3.14 |
including |
117.7 |
129.5 |
11.8 |
2.00 |
85.73 |
0.47 |
0.27 |
0.53 |
3.92 |
or including |
117.7 |
122.5 |
4.8 |
3.15 |
121.51 |
0.58 |
0.27 |
0.41 |
5.62 |
or including |
117.7 |
118.5 |
0.8 |
7.25 |
376.00 |
1.09 |
0.32 |
0.14 |
13.45 |
DDH25-223 |
43.6 |
44.8 |
1.2 |
0.12 |
10.34 |
0.05 |
0.22 |
3.27 |
1.47 |
and |
125.3 |
128.1 |
2.9 |
0.73 |
17.89 |
0.07 |
0.11 |
1.50 |
1.58 |
and |
146.6 |
154.8 |
8.2 |
0.35 |
62.37 |
0.35 |
0.72 |
1.23 |
2.18 |
including |
149.5 |
154.8 |
5.3 |
0.41 |
91.15 |
0.50 |
0.90 |
1.22 |
2.84 |
DDH25-224 |
127.1 |
139.5 |
12.4 |
0.79 |
45.32 |
0.23 |
1.66 |
3.44 |
3.26 |
including |
134.4 |
139.5 |
5.1 |
0.76 |
88.19 |
0.42 |
3.36 |
6.85 |
5.62 |
or including |
135.9 |
138.2 |
2.4 |
1.23 |
111.51 |
0.71 |
6.86 |
11.80 |
9.37 |
*True widths are estimated to be 85% of drilled intervals. |
** AuEq equation is: AuEq = Au + (Ag*0.0128) + (Cu%*1.2799) + (Pb%*0.2737) + (Zn%*0.3359), at |
Table 2: Drill Collar Locations and Details for Released Results
Hole ID |
WGS84 Z14 Easting |
WGS84 Z14 Northing |
Elevation (m) |
Azimuth |
Dip (°) |
Total Depth (m) |
DDH24-216 |
337564 |
2812620 |
1,262 |
320 |
-35 |
177.3 |
DDH24-217 |
337564 |
2812620 |
1,262 |
320 |
-55 |
190.7 |
DDH25-218 |
337565 |
2812622 |
1,262 |
355 |
-25 |
244.1 |
DDH25-219 |
337565 |
2812622 |
1,262 |
355 |
-38 |
208.2 |
DDH25-220 |
337565 |
2812622 |
1,262 |
355 |
-60 |
228.0 |
DDH25-221 |
337804 |
2813099 |
1,513 |
298 |
5 |
243.5 |
DDH25-222 |
337804 |
2813099 |
1,513 |
323 |
-20 |
225.0 |
DDH25-223 |
337804 |
2813099 |
1,513 |
323 |
-50 |
222.0 |
DDH25-224 |
337804 |
2813099 |
1,513 |
323 |
18 |
246.5 |
About 2025 Tahuehueto Exploration Program
The Tahuehueto property comprises a large, epithermal gold-silver vein system comprising 11 kilometres of strike length of known veins and mineralized and structures. These campaigns represent the first substantive exploration drilling on the Property in over 12 years. Mineralization remains open along strike and at depth for most of the modeled Mineral Resource areas. The objective of the current campaigns will be a combination of in-fill and step-out drilling to demonstrate the vertical and lateral extent of mineralization as well as to target thick, high-grade mineralized breccia-type ore shoots known to exist within the epithermal vein system. Recent mining in Level 23 encountered higher grade mineralization averaging 3.30 g/t Au over vein widths up to 20 metres (with values up to 65.04 g/t Au) in ore shoots branching off the main
In addition to the four veins that comprise the mineral resource, there are at least 14 additional prospective veins documented within the concession area that have potential to host additional epithermal Au-Ag(-Cu-Zn-Pb) mineralization. In some cases, these prospective targets may represent extensions of the currently defined Mineral Resource. The Company estimates that there are more than 11 km of prospective vein structures (measured along strike), compared to the 4.5 km of mineralized veins that support the current Mineral Resource model.
Figure 2 below shows the relative location of prospective veins (yellow) and veins modeled for resources and reserves (red) within the Company's concession area.
INTERACTIVE VRIFY 3D MODEL
To explore an interactive 3D model featuring the results announced today, click the following link or visit the
https://vrify.com/decks/18763
About
The
Analytical Method and Quality Assurance/Quality Control Measures
All drill core splits reported in this news release were analysed by Bureau Veritas of
Qualified Person
The technical information contained in this news release has been reviewed and approved by Mr.
On Behalf of the Board of Directors
(signed) "Dan Barnholden"
For more information, please visit: www.lucamining.com
Cautionary Note Regarding Forward-Looking Statements
It should be noted that Luca declared commercial production at
Statements contained in this news release that are not historical facts are "forward-looking information" or "forward-looking statements" (collectively, "Forward-Looking Information") within the meaning of applicable Canadian securities laws. Forward Looking Information includes, but is not limited to, disclosure regarding the Financings, the anticipated timing of closing thereof and the expected use of proceeds therefrom; and other possible events, conditions or financial performance that are based on assumptions about future economic conditions and courses of action; the timing and costs of future activities on the Company's properties, such as production rates and increases; success of exploration, development and bulk sample processing activities, and timing for processing at its own mineral processing facility on the Tahuehueto project site. In certain cases, Forward-Looking Information can be identified using words and phrases such as "plans," "expects," "scheduled," "estimates," "forecasts," "intends," "anticipates" or variations of such words and phrases. In preparing the Forward-Looking Information in this news release, the Company has applied several material assumptions, including, but not limited to, that all requisite approvals in respect of the Financings will be received, and all conditions precedent to completion of the Financings will be satisfied, in a timely manner; the Company will be able to raise additional capital as necessary; the current exploration, development, environmental and other objectives concerning the
Neither
View original content to download multimedia:https://www.prnewswire.com/news-releases/luca-discovers-multiple-new-high-grade-ore-shoots-at-tahuehueto-mine-durango-mexico-302445388.html
SOURCE