TomaGold Set to Launch Strategic Drilling Campaign on its Chibougamau Projects
Planned 53-hole exploration drilling campaign targeting mainly the Berrigan, Radar, David, Dufault and Obalski properties
This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20250620881407/en/

Figure 1 – Map of TomaGold’s Chibougamau Projects
Drill and Work Permits Secured
TomaGold has obtained all the necessary drilling and work permits, including the ATI (“Autorisation de Travaux à Impact”) and forestry permits, to begin exploration activities across its Chibougamau Projects.
Drill Pad Setup and Mobilization Status
All access trails to the drill sites have been cleared and secured, and the drill setups are ready for immediate mobilization. A total of 53 drill targets have been identified and are fully permitted. While preparing the sites during the winter, the team also conducted limited and selective surface sampling in select areas. Analytical results from this sampling are currently pending.
Geophysical Survey Work on Obalski
A downhole resistivity/induced polarization (IP) logging survey was conducted in hole OBS-17-002, which intersected the newly interpreted
3D Modelling and Structural Reinterpretation
TomaGold has completed approximately 95% of the geological reinterpretation and 3D modeling of the Obalski project. The updated model incorporates historical and recent data, providing a more comprehensive understanding of structural controls and mineralization trends. Final conclusions and visuals from the model will be presented shortly.
The Company has initiated a similar modelling and reinterpretation process across its other projects, leveraging the structural insights gained from the Obalski project reinterpretation.
Upcoming Geophysical Surveys (Pending Crew Availability)
TomaGold has outlined a series of geophysical surveys to be conducted across its Chibougamau Projects in 2025, pending crew availability and seasonal access. These surveys are designed to refine drill targeting and enhance geological modelling across key assets.
Summary of Planned Geophysical Work by Project:
Project |
|
Obalski (100% TomaGold) |
IP survey along the D vein, covering the Wilson and South zones |
Radar (Under option from SOQUEM) |
Airborne magnetic survey (50 m line spacing), ground IP surveys on new targets, possible 3D ambient tomography |
David (Under option from SOQUEM) |
Downhole IP in historical and recent drill holes, pending casing verification |
Dufault (Under option from SOQUEM) |
NW–SE IP survey over the 055° vein corridor; NE–SW IP over the Bourbeau Sill outlet zone |
Berrigan (Under option from Chibougamau Independent Mines) |
2D and 3D modelling under way; geophysical surveys anticipated in subsequent phases |
These surveys will complement the current structural reinterpretation work and support future drilling campaigns across the portfolio.
The technical content of this press release has been reviewed and approved by
About TomaGold
Cautionary Statement on Forward-Looking Information
This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this news release, other than statements of historical facts, that address events or developments that the Company expects to occur, are forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words “expects”, “plans”, “anticipates”, “believes”, “intends”, “estimates”, “projects”, “potential” and similar expressions, or that events or conditions “will”, “would”, “may”, “could” or “should” occur. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include the potential results of exploration and drilling activities, market prices, continued availability of capital and financing, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. Forward-looking statements are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made. Except as required by applicable securities laws, the Company undertakes no obligation to update these forward-looking statements in the event that management’s beliefs, estimates, opinions, or other factors should change.
Neither
View source version on businesswire.com: https://www.businesswire.com/news/home/20250620881407/en/
President and Chief Executive Officer
(514) 583-3490
www.tomagoldcorp.com
Source: