NGEx Drills 46.8m at 9.55% CuEq plus 48.9m at 7.75% CuEq at Lunahuasi
Highlights:
- Drillhole DPDH041 intersected:
- 8.30m at 12.38% copper equivalent ("CuEq") from 266.70m, plus:
- 89.10m at 4.09% CuEq from 581.90m, including:
- 38.10m at 7.07% CuEq from 605.40m
- Drillhole DPDH042 intersected:
- 48.90m at 7.75% CuEq from 281.70m, including:
- 12.55m at 19.05% CuEq from 292.25m, plus:
- 2.30m at 23.82% CuEq from 509.10m
- 48.90m at 7.75% CuEq from 281.70m, including:
- Drillhole DPDH043 intersected:
- 46.80m at 9.55% CuEq from 492.20m, including:
- 15.80m at 19.08% CuEq from 492.20m, including:
- 7.00m at 24.86% CuEq from 492.20m, and including:
- 4.80m at 22.69% CuEq from 503.20m, and including:
- 5.50m at 10.05% CuEq from 520.00m.
- 15.80m at 19.08% CuEq from 492.20m, including:
- 46.80m at 9.55% CuEq from 492.20m, including:
Results to date indicate that these are just the first three of many additional zones that we have discovered in isolated drill intersections, and we are confident that additional closer spaced drilling will ultimately help to define them. With results from the final four holes of the program still to come and planning well underway for our fourth drill campaign, set to start in October, we are in a very strong position to continue increasing the value of this unique asset."
Table 1 : Significant Intersections
Hole ID |
From |
To (m) |
Length |
Est True |
Cu % |
Au g/t |
Ag g/t |
CuEq % |
DPDH040 |
523.00 |
656.30 |
133.30 |
111 |
1.01 |
0.95 |
44.5 |
2.10 |
incl |
554.00 |
562.00 |
8.00 |
6.6 |
1.82 |
7.82 |
442.1 |
11.42 |
incl |
558.00 |
560.00 |
2.00 |
1.7 |
1.46 |
16.83 |
560.0 |
18.66 |
plus |
818.00 |
1177.30 |
359.30 |
359 |
0.28 |
0.12 |
3.2 |
0.40 |
incl |
943.00 |
945.00 |
2.00 |
1.7 |
5.02 |
0.18 |
37.5 |
5.48 |
DPDH041 |
133.00 |
146.00 |
13.00 |
6.6 |
0.46 |
1.88 |
26.6 |
2.07 |
incl |
133.00 |
136.00 |
3.00 |
1.5 |
1.87 |
5.84 |
97.7 |
6.98 |
plus |
208.70 |
229.00 |
20.30 |
11 |
0.66 |
1.11 |
15.5 |
1.60 |
plus |
266.70 |
275.00 |
8.30 |
4.6 |
7.77 |
4.01 |
191.2 |
12.38 |
plus |
507.60 |
1098.50 |
590.90 |
591 |
1.01 |
0.42 |
17.0 |
1.46 |
incl |
507.60 |
512.00 |
4.40 |
2.6 |
1.03 |
1.98 |
40.9 |
2.83 |
and incl |
533.75 |
539.00 |
5.25 |
3.2 |
3.94 |
2.15 |
85.6 |
6.25 |
and incl |
567.80 |
572.30 |
4.50 |
2.7 |
0.65 |
1.59 |
102.4 |
2.71 |
and incl |
581.90 |
671.00 |
89.10 |
56 |
2.93 |
1.11 |
40.8 |
4.09 |
incl |
605.40 |
643.50 |
38.10 |
24 |
5.06 |
1.98 |
63.9 |
7.07 |
and incl |
694.00 |
697.60 |
3.60 |
2.3 |
4.64 |
2.27 |
22.3 |
6.50 |
and incl |
927.40 |
933.80 |
6.40 |
4.6 |
4.37 |
1.68 |
88.6 |
6.37 |
and incl |
1053.30 |
1057.00 |
3.70 |
2.9 |
7.81 |
1.39 |
130.8 |
9.97 |
DPDH042 |
281.70 |
330.60 |
48.90 |
34 |
4.87 |
3.29 |
54.7 |
7.75 |
incl |
292.25 |
304.80 |
12.55 |
8.8 |
13.30 |
6.63 |
104.6 |
19.05 |
plus |
411.50 |
423.20 |
11.70 |
8.4 |
2.36 |
0.67 |
11.6 |
2.95 |
plus |
509.10 |
521.30 |
12.20 |
9.0 |
3.85 |
6.03 |
126.4 |
9.36 |
incl |
509.10 |
511.40 |
2.30 |
1.7 |
15.03 |
4.30 |
642.2 |
23.82 |
plus |
772.35 |
855.80 |
83.45 |
68 |
0.69 |
0.50 |
26.2 |
1.29 |
DPDH043 |
198.40 |
288.00 |
89.60 |
46 |
1.54 |
1.03 |
14.4 |
2.42 |
incl |
202.00 |
205.00 |
3.00 |
1.5 |
9.23 |
6.03 |
74.5 |
14.29 |
and incl |
257.80 |
268.40 |
10.60 |
5.4 |
4.04 |
1.93 |
37.7 |
5.78 |
plus |
457.00 |
459.35 |
2.35 |
1.2 |
3.22 |
17.05 |
115.8 |
16.67 |
plus |
492.20 |
539.00 |
46.80 |
23 |
6.63 |
3.05 |
79.2 |
9.55 |
incl |
492.20 |
508.00 |
15.80 |
7.9 |
14.25 |
5.02 |
132.8 |
19.08 |
incl |
492.20 |
499.20 |
7.00 |
3.5 |
18.71 |
7.01 |
118.6 |
24.86 |
incl |
492.20 |
494.00 |
1.80 |
0.9 |
14.98 |
11.47 |
128.6 |
24.47 |
and incl |
503.20 |
508.00 |
4.80 |
2.4 |
17.27 |
4.60 |
235.8 |
22.69 |
and incl |
520.00 |
525.50 |
5.50 |
2.8 |
5.34 |
4.67 |
148.3 |
10.05 |
Copper equivalent (CuEq) for drill intersections is calculated based on
Estimated true widths are rounded to the nearest metre for widths over 10m and to the nearest 0.1m for widths less than 10m, as this better reflects the precision of the estimates. True widths should be regarded as approximate as these are derived from an estimate that uses a preliminary interpretation of the geological model and are subject to change as more information becomes available. Intervals greater than 300m are interpreted as bulk disseminated and stockwork mineralization and drilled width is equal to estimated true width.
DPDH040 was collared on a new platform at the western edge of the drill pattern and angled to the west at -46o to explore the up-dip extension of the vein system. Several mineralized zones were intersected as shown in Table 1, all of which extend the deeper zones upwards and remain open to surface. For example, the intersection at 554.00m to 562.00m is 314m vertically above the intersection from 842.00m to 855.00m in hole DPDH039 and may be on the same structure. On a larger scale, the 133.30m interval at 2.10% CuEq from 523.00m correlates well with the 400.40m interval at 1.72% CuEq in hole DPDH039, over 300m below (News Release dated
Hole DPDH040 also intersected the far eastern edge of the porphyry system, starting at about 818m as indicated by the presence of porphyry veins and a transition indicated by the sequential copper analyses from enargite-dominated copper mineralization to chalcopyrite-dominated. The 359.30m interval from 818.00m to the end of the hole at 1,177.30m averaged 0.28% Cu and 0.12 g/t Au (0.40% CuEq) consistent with the distal part of the porphyry system. This interval is just over 400m north of the porphyry interval in DPDH027.
DPDH041 was collared from the same platform as DPDH018, 22, 28 and 34 and drilled towards the west at a dip of -56o to test for a southern extension to the Saturn zone. The 89.10m intersection at 4.09% CuEq from 581.90m correlates well with the Saturn zone and is located 150m below and to the south of the interval in DPDH028 and 100m above and to the south of the interval in DPDH034, providing a significant expansion to the zone.
DPDH042 was drilled from a new platform on the eastern edge of the drill pattern and angled to the west at a dip of -48o to test for both a northern extension to the Saturn zone and a southern extension to the Mars zone. The hole intersected a broad zone of very strong mineralization from 281.70m (48.9m at 7.75% CuEq), including a 12.55m section of 19.05% CuEq, which is interpreted as the southern continuation of the Mars zone structure. The intersection here is 100m south of the Mars zone intersection in DPDH032 (27.40m at 25.19% CuEq – see News Release dated
DPDH043 was collared at the northern edge of the deposit from the same platform as DPDH038 and drilled at an azimuth of 316o and a dip of -54o to test the northern extent of the deposit. It intersected the interpreted continuation of the Mars zone at 198.40m with a broad zone (89.60m) at 2.42% CuEq including high-grade intervals of 3.00m at 14.29% CuEq from 202.00m and 10.60m at 5.78% CuEq from 257.80m. This intersection extends the Mars zone by 50m from DPDH038. The hole then went on to hit a much stronger zone at 492.20m (46.80m at 9.55% CuEq) which included several much higher-grade intervals as shown in Table 1 above. This interval is thought to represent the first intersection into a new high-grade zone and clearly indicates that the deposit is completely open to the north.
Discussion
With these latest results, we now have enough confidence in the location and continuity of the three initial zones discussed in earlier news releases to name them and begin designing drill holes specifically to understand their geometry and extent. These three zones have been named Jupiter, Saturn and Mars, and we believe that they represent the first group of what will ultimately become several distinct high-grade zones within the Lunahuasi deposit.
Jupiter is the initial high-grade zone discovered by hole DPDH002 - the first hole drilled into this part of the property. Mars is the shallow high-grade zone first discovered by hole DPDH014 and described in the
In addition to these three zones, we have numerous isolated drill intersections that we are confident will develop into new zones. For example, Table 1 shows intersections from hole DPDH040 (8.00m at 11.42% CuEq) and DPDH043 (46.80m at 9.55% CuEq) which, along with multiple intersections in other holes, appear to represent additional high-grade zones which will be defined with more drilling.
The Phase 3 drill program was completed on
Table 2: Assay Intervals by News Release Date
Hole ID |
Feb 19 2025 |
Mar 13 |
Apr 24 2025 |
May 21 2025 |
June 18 |
Jul-02 |
Pending |
2025 |
2025 |
2025 |
|||||
DPDH024 |
757.0-968 |
- |
- |
- |
|
|
None |
DPDH025 |
652.0-1303.8 |
- |
- |
- |
|
|
None |
DPDH026 |
553.0-1261.2 |
- |
- |
- |
|
|
None |
DPDH027 |
459.0-1075.1 |
- |
- |
1015.1-2005.0 |
|
|
None |
DPDH028 |
588.0-1530.7 |
- |
- |
- |
|
|
None |
DPDH029 |
0-1060.0 |
- |
- |
1060.0-1600.0 |
|
|
None |
DPDH030 |
|
0-502.9 |
- |
- |
|
|
None |
DPDH031 |
|
0-860.0 |
- |
- |
|
|
None |
DPDH032 |
|
0-573.0 |
573.0-896.1 |
- |
|
|
None |
DPDH033 |
|
0-475.8 |
475.8-1235.0 |
- |
|
|
None |
DPDH034 |
|
0-353.3 |
353.3-1329.7 |
- |
|
|
None |
DPDH035 |
|
0-273.5 |
273.5-1073.0 |
- |
|
|
None |
DPDH036 |
|
|
|
|
0-1105.2 |
|
None |
DPDH037 |
|
|
|
|
0-1196.1 |
|
None |
DPDH038 |
|
|
|
|
0-785.0 |
|
None |
DPDH039 |
|
|
|
|
0-1200.8 |
|
None |
DPDH040 |
|
|
|
|
|
0-1177.3 |
None |
DPDH041 |
|
|
|
|
|
0-1098.5 |
None |
DPDH042 |
|
|
|
|
|
0-891.5 |
None |
DPDH043 |
|
|
|
|
|
0-554.0 |
None |
DPDH044 |
|
|
|
|
|
|
All |
DPDH045 |
|
|
|
|
|
|
All |
DPDH046 |
|
|
|
|
|
|
All |
DPDH047 |
|
|
|
|
|
|
All |
Qualified Persons and Technical Notes
The scientific and technical disclosure included in this news release have been reviewed and approved by
Samples were cut at NGEx's operations base in
About
NGEx owns 100% of Lunahuasi and is the majority partner and operator for the Los Helados project, subject to a Joint Exploration Agreement with
The Company's common shares are listed on the TSX under the symbol "NGEX" and also trade on the OTCQX under the symbol "NGXXF". NGEx is part of the
Additional information relating to NGEx may be obtained or viewed on SEDAR+ at www.sedarplus.ca.
Additional Information
Neither the TSX nor its Regulation Services Provider (as that term is defined in the policies of the TSX) accepts responsibility for the adequacy or accuracy of this news release.
The information contained in this news release was accurate at the time of dissemination but may be superseded by subsequent news release(s). The Company is under no obligation, nor does it intend to update or revise the forward-looking information, whether as a result of new information, future events or otherwise, except as may be required by applicable securities laws.
Cautionary Note Regarding Forward-Looking Statements
Certain statements made and information contained herein in the news release constitutes "forward-looking information" and "forward-looking statements" within the meaning of applicable securities legislation (collectively, "forward-looking information"). All statements other than statements of historical facts included in this document constitute forward-looking information, including but not limited to, statements regarding: the geological interpretation of the Lunahuasi system which is expected to evolve with additional drilling, the nature and timing of the work to be undertaken to advance the Lunahuasi project, including the timing of the Phase 4 drill campaign, the potential for further discovery and/or extension of mineralized zones at the Lunahuasi project; the timing of, and conclusions resulting from, an update to the geological interpretation at Lunahuasi, including the ultimate size potential of the Lunahuasi system, or the timing and/or results thereof; and the Company's ability to use information gathered from drilling to date to effectively target and drill in future campaigns. Generally, this forward-looking information can frequently, but not always, be identified by use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "projects", "budgets", "assumes", "strategy", "objectives", "potential", "possible", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or statements that certain actions, events, conditions or results "will", "may", "could", "would", "should", "might" or "will be taken", "will occur" or "will be achieved" or the negative connotations thereof.
Forward-looking information is necessarily based upon various estimates and assumptions including, without limitation, the expectations and beliefs of management with respect to the nature, scope and timing of the work to be undertaken to advance the
The forward-looking information contained in this news release is based on information available to the Company as at the date of this news release. Except as required under applicable securities legislation, the Company does not undertake any obligation to publicly update and/or revise any of the forward-looking information included, whether as a result of additional information, future events and/or otherwise. Forward-looking information is provided for the purpose of providing information about management's current expectations and plans and allowing investors and others to get a better understanding of the Company's operating environment. Although the Company has attempted to identify important factors that would cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated, or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. All the forward-looking information contained in this document is qualified by these cautionary statements. Readers are cautioned not to place undue reliance on forward-looking information due to the inherent uncertainty thereof.
Cautionary Note to
Information concerning the mineral properties of the Company contained in this news release has been prepared in accordance with the requirements of Canadian securities laws, which differ in material respects from the requirements of securities laws of
SOURCE