G Mining Ventures Achieves Nameplate Capacity at Tocantinzinho; Q2 2025 Production Results Released
Second Quarter 2025 Production Highlights
- No lost time or recordable incidents in Q2 2025
- Q2-2025 gold production of 42,587 ounces, a 20% increase over Q1 2025
- Gold recovery improved to 90.3% (from 87.7% in Q1 2025)
- Average mining rate of ~47,900 tpd, an 18% increase from Q1 2025
- Average plant throughput of 11,100 tpd or 86% of nameplate
- April: 8,600 tpd (67% of nameplate)
- May and June: 12,300 tpd (96% of nameplate)
"The team at TZ has delivered an impressive Q2 following the SAG mill liner challenges earlier this year, leading to a successful ramp up to nameplate throughput," said
Tocantinzinho Key Production Highlights:
TZ Production |
Q1 2025 |
Q2 2025 |
YTD 2025 |
|
Mining Activities |
||||
Ore Tonnes Mined |
kt |
1,512 |
1,649 |
3,161 |
Waste Tonnes Mined |
kt |
2,195 |
2,707 |
4,902 |
Total Tonnes Mined |
kt |
3,707 |
4,356 |
8,063 |
Strip Ratio |
Waste/Ore |
1.45 |
1.64 |
1.55 |
Average |
tpd |
41,186 |
47,873 |
44,548 |
Processing Activities |
||||
Total Tonnes Processed |
kt |
904 |
1,011 |
1,915 |
Average Plant Throughput |
tpd |
10,046 |
11,107 |
10,579 |
Average Gold Recovery |
% |
87.7 % |
90.3 % |
89.1 % |
Average Gold Grade Processed |
g/t Au |
1.40 |
1.45 |
1.43 |
Gold Produced |
oz |
35,578 |
42,587 |
78,165 |
Tocantinzinho Processing Update
During the ramp-up phase of the TZ mine, GMIN identified premature wear of the poly-met liners in the Semi-Autogenous Grinding ("SAG") mill, which resulted in frequent unscheduled downtime for liner replacements. While the mill performed as designed when running, these repeated shutdowns lowered the plant availability, resulting in less tonnage processed. To resolve the issue, the Corporation completed a permanent replacement of the rubber liners with a steel system in April, effectively eliminating the need for unplanned stoppages with normal wear expected going forward.
Since the installation of the steel liners in April, the mill has performed to expectations, achieving an average throughput of 96% of nameplate for the months of May and June, with an exceptional 103% of nameplate for the month of May. This performance demonstrates the robustness of the permanent solution and highlights the stability of the TZ processing circuit.
Operating Period |
April Poly-met Liner |
May & June Steel Liner |
Q2 2025 |
|
Processing Activities |
||||
Total Tonnes Processed |
kt |
259 |
752 |
1,011 |
Days in Period |
days |
30 |
61 |
91 |
Average Plant Throughput |
tpd |
8,633 |
12,324 |
11,107 |
Percent of Nameplate |
% |
67 % |
96 % |
86 % |
The expert control systems installed on the SAG mill and flotation circuit have contributed to increased plant throughput, enhanced stability and improved gold recoveries.
Tocantinzinho Mining Update
The mine delivered strong operational performance in Q2, achieving an average mining rate of 47,900 tpd — an 18% increase over Q1, which had been adversely impacted by above-average rainfall relative to historical data. During the quarter, additional mine fleet equipment was delivered to
Strong Operational Performance Underway
2025 production guidance for the TZ mine is forecast to be between 175,000 to 200,000 gold ounces, with a 44% of the production targeted for H1 and 56% in H2.
Second-quarter gold production totaled 42,587 ounces, representing 23% of the midpoint of annual guidance, slightly above the planned 22%.
First-half 2025 gold production totaled 78,165 ounces, representing 42% of the midpoint of annual guidance, slightly below the planned 44%.
2025 Outlook Reaffirmed
Following the successful resolution of the SAG mill issue, GMIN reiterates its previously issued 2025 production guidance for the TZ mine of 175,000 to 200,000 oz. Commentary on cost guidance will be provided with the upcoming Q2 results.
2025 Catalysts
Over 2025, the Corporation will focus on the following activities:
- Final environmental permit for
Oko West (early Q3 2025) -
Oko West financing and construction decision (H2-2025) - Greenfield and brownfield exploration (TZ,
Oko West and Gurupi) (2025)
Second Quarter 2025 Earnings Results Conference Call and Webcast
GMIN will release its second quarter 2025 results on
- Conference ID: 2442486
- Participant Toll-Free Dial-In Number: 1 (800) 715-9871
- Participant International Dial-In Number: 1-646-307-1963
Participants can also access a live webcast of the conference call via https://edge.media-server.com/mmc/p/vnz2p26e or via the GMIN website at: https://gmin.gold/investors/presentations-and-events/
A replay of this conference call will be available via the webcast for 12 months. Replay details will be provided on the GMIN website 24 hours after the call at:
https://gmin.gold/investors/presentations-and-events/
Qualified Person
About
Cautionary Statement on Forward-Looking Information
All statements, other than statements of historical fact, contained in this press release constitute "forward-looking information" and "forward-looking statements" within the meaning of certain securities laws and are based on expectations and projections as of the date of this press release. Forward-looking statements contained in this press release include, without limitation, those related to (i) the replacement of the SAG mill liners effectively eliminating unplanned stoppages; (ii) the additional mine fleet equipment expected to further elevate mining productivity in the second half of the year; (iii) the 2025 production guidance for the TZ mine; (iv) the quoted comments of GMIN's President & Chief Executive Officer; (v) the above-listed 2025 catalysts; and (vi) more generally,
the section entitled "About
Forward-looking statements are based on expectations, estimates and projections as of the time of this press release. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by the Corporation as of the time of such statements, are inherently subject to significant business, economic and competitive uncertainties and contingencies. These estimates and assumptions may prove to be incorrect. Such
assumptions include, without limitation, those relating to (i) the improved gold recoveries at TZ, (ii) a stable plant throughput at TZ, (iii) the price of gold, and (iv) currency exchange rates; and those underlying the items listed in the above section entitled "About
Many of these uncertainties and contingencies can directly or indirectly affect, and could cause, actual results to differ materially from those expressed or implied in any forward-looking statements. There can be no assurance that, notably but without limitation, (i) the average mining rate, mill throughput and gold recoveries will continue to improve or at least be maintained at same levels, or (ii) the 2025 production guidance for TZ will be achieved, or (iii) the 2025 catalysts will materialize as expected by management, or (iv) TZ and Oko West will grow GMIN into the next intermediate producer, as future events could differ materially from what is currently anticipated by the Corporation. In addition, there can be no assurance that
By their very nature, forward-looking statements involve inherent risks and uncertainties, both general and specific, and risks exist that estimates, forecasts, projections and other forward-looking statements will not be achieved or that assumptions do not reflect future experience. Forward-looking statements are provided for the purpose of providing information about management's expectations and plans relating to the future. Readers are cautioned not to place undue reliance on these forward-looking statements as a number of important risk factors and future events could cause the actual outcomes to differ materially from the beliefs, plans, objectives, expectations, anticipations, estimates, assumptions and intentions expressed in such forward-looking statements. All of the forward-looking statements made in this press release are qualified by these cautionary statements and those made in the Corporation's other filings with the securities regulators of