Power Metallic Provides an Update on Summer 2025 Exploration Programs at Nisk Project
THE BIG PICTURE
Exploration is well underway for the summer to fall drilling campaign. The majority of the logging and core cutting facility upgrade (announced in the
Mobilization of project team members, drillers (RJLL Forage Drilling) and Helicopter support (Expedition) was completed for a
The drills mobilized are targeting the following drilling meters by zone for the summer drilling period.
- 10,000-12500 meters of drilling at Lion
- 5,000-6,250 meters of drilling at Tiger
- 5,000-6,250 meters of drilling at Nisk Main, Nisk West and Nisk East
As previously carried out in 2024 and Q1 2025 drilling programs, borehole EM (BHEM) surveys are being performed by Geophysique TMC on selected drill holes to identify off-hole anomalies. To date Power Metallic has had great success discovering mineralization following up on BHEM conductors. TMC will also conduct localized ground EM surveys following up on re-interpreted Airborne EM data collected in 2023
In addition to drilling, a large field crew is carrying out detailed mapping and prospecting of the property, including the recently announced land acquisition package from Li-FT Power covering the south limb of the basin containing the prospective geology for Cu-PGE-Ni deposits, and the eastern and western extensions of the Nisk-Lion-Tiger host geology (
Supplementing the field mapping Power Metallic has started an airborne EM/magnetic (AEM) survey carried out by
Additional to the AEM survey Power Metallic completed a LiDAR survey with
In the background of the exploration programs Power Metallic is continuing to process detailed mineralogy studies through IOS and Elemission. These studies are designed to quantify the deportment of the Lion style mineralization, and the host rocks containing the
THE EXECUTION
Drill continues to develop the mineralization along the Nisk-Lion-Tiger trend (Figure 1). As drill permitting advances the target area through this host stratigraphy will be expanded. With four (4) drills operating Power Metallic expects an acceleration in discovery and expansion along this trend.
Lion
At Lion there are two (2) fly rigs turning with the aim of both extending Lion down dip/plunge to the SW as well as to infill gaps within the known deposit. Extension holes have been planned within an aggressive 100 x 100m grid following the modelled plunge of Lion, and accumulated BHEM conductive plates. Infill holes have been designed to add tonnes to the future mineral resource estimate. To date five (5) holes have been completed in this drill campaign with assays pending on significant mineralized zones (Figure 2).
Tiger
Power Metallic has scheduled one (1) drill to explore several undrilled targets (both modelled and BHEM) that are designed to expand this area into an additional mineral resource.
Between Lion and Tiger
There is a wide gap of no information between the currently known Lion and Tiger zones. A fourth drill (fly) is being mobilized to site this week with the goal of drilling exploratory holes between Lion and Tiger to cover this gap, as well as to evaluate targets at Tiger following up on mineralized intercepts from the early 2025 programme, as well as to test targets defined by BHEM surveys.
Nisk Deposit
A skid-based drill is active at Nisk East with the goal of understanding the potential that exists between Nisk and Lion, as well as targeting plates generated from recent BHEM and Airborne EM surveys. Select holes in this programme will have BHEM done. Early drilling during the Q1 2025 drilling campaign and in this campaign has encountered interesting mineralization that appears to be a hybrid of Lion and Nisk styles. To date three (3) holes have been completed in this drill campaign with assays pending on significant mineralized zones.
LiFT Acquisition Update
The Company is in the final stages of completing the acquisition that will add 167 km² to our existing ground (Figure 4). Increasing our land package by more than 300%. We expect to close this acquisition in the coming days and will provide a news release upon closing.
Power Metallic is in the process of acquiring drill permits for the additional lands acquired, and for extending the Lion-Nisk target area. It is anticipated that these areas will be permitted for drilling during this current drill campaign. Specific areas of interest include the extension east of the Lion-Tiger stratigraphy that was acquired from Li-FT, and the western extension of the geology hosting the Nisk deposit which has indications of Ni-Cu mineralization from historical drilling.
Once the AEM and LiDAR surveys are completed, and the results of prospecting sample assays are returned, drill targets will be developed in these new areas.
Qualified Person
About
Power Metallic is a Canadian exploration company focused on advancing the Nisk Project Area (Nisk–Lion–Tiger)—a high–grade Copper–PGE, Nickel, gold and silver system—toward Canada's next polymetallic mine.
On
Power Metallic is expanding mineralization at the Nisk and Lion discovery zones, evaluating the Tiger target, and exploring the enlarged land package through successive drill programs.
Beyond the Nisk Project Area, Power Metallic indirectly has an interest in significant land packages in
It also owns 100% of Power Metallic Arabia which owns 100% interest in the Jabul Baudan exploration license in The Kingdon of
For further information, readers are encouraged to contact:
Neither the
Cautionary Note Regarding Forward-Looking Statements
This message contains certain statements that may be deemed "forward-looking statements" concerning the Company within the meaning of applicable securities laws. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "potential," "indicates," "opportunity," "possible" and similar expressions, or that events or conditions "will," "would," "may," "could" or "should" occur. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, are subject to risks and uncertainties, and actual results or realities may differ materially from those in the forward-looking statements. Such material risks and uncertainties include, but are not limited to, among others; the timing for various drilling plans; the ability to raise sufficient capital to fund its obligations under its property agreements going forward and conduct drilling and exploration; to maintain its mineral tenures and concessions in good standing; to explore and develop its projects; changes in economic conditions or financial markets; the inherent hazards associates with mineral exploration and mining operations; future prices of nickel and other metals; changes in general economic conditions; accuracy of mineral resource and reserve estimates; the potential for new discoveries; the ability of the Company to obtain the necessary permits and consents required to explore, drill and develop the projects and if accepted, to obtain such licenses and approvals in a timely fashion relative to the Company's plans and business objectives for the applicable project; the general ability of the Company to monetize its mineral resources; and changes in environmental and other laws or regulations that could have an impact on the Company's operations, compliance with environmental laws and regulations, dependence on key management personnel and general competition in the mining industry.
View original content to download multimedia:https://www.prnewswire.com/news-releases/power-metallic-provides-an-update-on-summer-2025-exploration-programs-at-nisk-project-302502129.html
SOURCE