LUCA DRILLS 37 METRES OF 6 G/T GOLD, 370 G/T SILVER AND 6% ZINC AT CAMPO MORADO
- Luca has begun to unlock the gold potential at
Campo Morado with consistent high-grade gold intercepts from both the Reforma Deposit and in areas immediately adjacent to underground operations - Surface drillhole CMRF25-07 intercepts 37.2m of 13.85 AuEq** (5.87 g/t gold, 367.50 g/t silver, 0.53% copper, 5.54% zinc and 2.57% lead) including 6.2m of43.77 g/t AuEq (20.81 g/t gold, 1,484.20 g/t silver, 0.82% copper, 5.98% zinc and 4.58% lead)
- Underground drillhole CMUG-25-022 returns assays including 5.5 m of 15.2/t AuEq (5.5m of 3.20 g/t gold, 252.6 g/t silver, 2.19% copper, 12.79% zinc and 5.10% lead) from an unmined area within 20 metres of current underground workings
-
24 underground drillholes totalling 5,070m completed as part of the 5,000m Phase 1 program targeting near-mine resource expansion and exploration of untested areas of the
Campo Morado Mine . Phase 2 program designed to follow up on positive results and test additional priority targets to begin shortly -
Surface drilling continues at
Reforma andEl Rey with ten drillholes completed at the Reforma Deposit
Surface drillholes CMRF-25-02 through CMRF-25-07 were all collared within the Reforma Deposit, and intersected appreciable intervals of massive sulphide mineralization including:
- 6.2m of 43.77 g/t AuEq (20.81 g/t gold, 1,484.20 g/t silver, 0.82% copper, 5.98% zinc and 4.58% lead from 237.0m within a broader interval of 37.2m of 13.85 AuEq (5.87 g/t gold, 367.50 g/t silver, 0.53% copper, 5.54% zinc and 2.57% lead) from 211.2m in hole CMRF25-07
- 9.9m of 28.32 AuEq(11.61 g/t Au, 783.90 g/t Ag, 3.51% Cu, 4.56% Zn and 2.91% Pb from 218.6m within a broader interval of 39.0m of 10.05 AuEq (4.09 g/t gold, 304.90 g/t silver, 0.96% copper, 1.27% zinc and 1.74% lead) from 191.6m in hole CMRF25-06
- 5.0m of 9.13 g/t AuEq (3.56 g/t gold, 196.28 g/t silver, 0.70% copper, 4.43% zinc and 2.24% lead) from 285.5m in hole CMRF25-03
- 3.9m of 19.78 AuEq (11.23 g/t gold, 342.28 g/t silver, 0.36% copper, 3.95% zinc and 7.55% lead) from 273.8m within a larger 7.45m of 12.59 AuEq(6.91 g/t gold, 228.06 g/t silver, 0.37% copper, 2.29% zinc and 4.75% lead) in hole CMRF25-02
These surface holes were drilled across the Reforma Deposit to confirm the size, tenor and grade of precious and base metals historically reported as well as to better define the deposit and test the expansion potential of the
Underground drillholes CMUG-25-17 confirmed mineralization close to the 856 Zone of the
Table 1: Highlighted Diamond Drill Assay Results from UG Drillholes CMUG-25-17, CMUG-25-19 through CMUG-25-22 and Surface Drillholes CMRF-25-through CMRF-25-07.
Hole ID |
From (m) |
To (m) |
Interval* (m) |
Au g/t |
Ag g/t |
Cu% |
Pb% |
Zn% |
AuEq** |
Logged |
CMUG25-017 |
9.3 |
10.3 |
1.0 |
0.62 |
158.00 |
2.75 |
1.00 |
3.85 |
7.79 |
>90% |
CMUG-25-019 |
232.3 |
248.7 |
16.4 |
0.62 |
45.95 |
0.34 |
0.31 |
0.97 |
2.06 |
>90% |
Including |
|
|
|
|
|
|
|
|
|
|
232.3 |
242.9 |
10.6 |
0.74 |
52.85 |
0.38 |
0.37 |
1.08 |
2.38 |
>90% |
|
CMUG-25-020 |
231.6 |
238.5 |
7.0 |
0.73 |
52.56 |
0.36 |
0.24 |
0.92 |
2.23 |
>90% |
Including |
|
|
|
|
|
|
|
|
|
|
235.5 |
238.5 |
3.0 |
0.91 |
63.30 |
0.50 |
0.24 |
1.22 |
2.85 |
>90% |
|
CMUG25-021 |
329.3 |
330.9 |
1.6 |
1.23 |
36.60 |
0.07 |
0.53 |
0.02 |
1.93 |
>90% |
340.3 |
344.4 |
4.2 |
0.59 |
34.17 |
0.42 |
0.18 |
0.53 |
1.79 |
>90% |
|
379.1 |
380.2 |
1.0 |
0.59 |
38.20 |
0.44 |
0.23 |
0.02 |
1.70 |
>90% |
|
CMUG25-022 |
151.5 |
178.9 |
27.4 |
1.15 |
91.21 |
0.78 |
1.36 |
4.27 |
5.22 |
>90% |
Including |
|
|
|
|
|
|
|
|
|
|
158.0 |
174.7 |
16.6 |
1.51 |
131.40 |
1.14 |
2.14 |
6.55 |
7.58 |
>90% |
|
Including |
|
|
|
|
|
|
|
|
|
|
158.0 |
163.6 |
5.5 |
3.20 |
252.59 |
2.19 |
5.10 |
12.79 |
15.22 |
>90% |
|
181.9 |
210.1 |
28.3 |
0.15 |
13.13 |
0.25 |
0.14 |
1.89 |
1.36 |
>90% |
|
Including |
|
|
|
|
|
|
|
|
|
|
187.5 |
205.5 |
18.0 |
0.15 |
15.51 |
0.31 |
0.15 |
2.41 |
1.65 |
>90% |
|
238.5 |
259.5 |
21.0 |
0.08 |
11.03 |
0.38 |
0.14 |
2.00 |
1.47 |
>90% |
|
Including |
|
|
|
|
|
|
|
|
|
|
246.5 |
256.5 |
10.1 |
0.10 |
16.98 |
0.64 |
0.16 |
3.41 |
2.42 |
>90% |
|
CMRF25-02 |
271.5 |
278.9 |
7.5 |
6.91 |
228.06 |
0.37 |
2.29 |
4.75 |
12.59 |
99 |
Including |
|
|
|
|
|
|
|
|
|
|
273.8 |
277.7 |
3.9 |
11.23 |
342.28 |
0.36 |
3.95 |
7.55 |
19.78 |
98 |
|
CMRF25-03 |
284.6 |
293.1 |
8.5 |
2.38 |
138.52 |
0.69 |
1.43 |
2.93 |
6.45 |
98 |
Including |
|
|
|
|
|
|
|
|
|
|
285.5 |
293.1 |
7.6 |
2.65 |
146.76 |
0.59 |
1.59 |
3.24 |
6.85 |
97 |
|
Including |
|
|
|
|
|
|
|
|
|
|
285.5 |
290.5 |
5.0 |
3.56 |
196.28 |
0.70 |
2.24 |
4.43 |
9.13 |
98 |
|
CMRF25-04 |
131.2 |
132.6 |
1.4 |
3.89 |
277.00 |
0.36 |
6.90 |
23.55 |
18.29 |
74 |
132.6 |
167.6 |
35.0 |
Very Low Core Recovery |
7-21% |
||||||
167.8 |
170.8 |
3.0 |
0.13 |
328.00 |
0.08 |
0.37 |
0.07 |
4.44 |
33 |
|
CMRF25-05 |
134.4 |
193.4 |
59.0 |
0.78 |
44.30 |
0.88 |
0.30 |
1.67 |
3.15 |
97 |
Including |
|
|
|
|
|
|
|
|
|
|
134.4 |
155.5 |
21.1 |
0.72 |
32.89 |
1.30 |
0.06 |
0.49 |
2.99 |
93 |
|
Including |
|
|
|
|
|
|
|
|
|
|
134.4 |
147.3 |
12.9 |
0.87 |
39.75 |
1.43 |
0.06 |
0.57 |
3.42 |
91 |
|
Including |
|
|
|
|
|
|
|
|
|
|
134.4 |
143.5 |
9.1 |
0.93 |
45.29 |
1.71 |
0.08 |
0.68 |
3.95 |
99 |
|
and |
|
|
|
|
|
|
|
|
|
|
163.6 |
171.4 |
7.9 |
0.08 |
19.70 |
0.55 |
0.08 |
2.11 |
1.82 |
100 |
|
and |
|
|
|
|
|
|
|
|
|
|
171.4 |
193.4 |
22.0 |
1.34 |
74.71 |
0.59 |
0.71 |
3.14 |
4.37 |
100 |
|
Including |
|
|
|
|
|
|
|
|
|
|
173.5 |
180.7 |
7.2 |
2.12 |
100.40 |
0.53 |
0.97 |
4.22 |
5.85 |
99 |
|
and |
|
|
|
|
|
|
|
|
|
|
184.7 |
190.7 |
6.0 |
1.41 |
77.47 |
0.59 |
0.91 |
2.74 |
4.38 |
100 |
|
CMRF25-06 |
173.2 |
181.5 |
8.3 |
0.18 |
27.80 |
0.70 |
0.07 |
1.08 |
1.83 |
76 |
Including |
|
|
|
|
|
|
|
|
|
|
173.2 |
179.0 |
5.8 |
0.24 |
34.70 |
0.83 |
0.09 |
1.28 |
2.23 |
75 |
|
Including |
|
|
|
|
|
|
|
|
|
|
173.2 |
176.8 |
3.2 |
0.34 |
48.20 |
1.05 |
0.13 |
1.34 |
2.81 |
77 |
|
191.6 |
230.6 |
39.0 |
4.09 |
304.90 |
0.96 |
1.74 |
1.27 |
10.05 |
44 |
|
Including |
|
|
|
|
|
|
|
|
|
|
191.6 |
195.6 |
4.0 |
4.48 |
141.00 |
0.08 |
3.16 |
0.15 |
7.26 |
41 |
|
and |
|
|
|
|
|
|
|
|
|
|
197.6 |
216.8 |
19.2 |
1.28 |
181.20 |
0.10 |
1.34 |
0.13 |
4.08 |
17 |
|
and |
|
|
|
|
|
|
|
|
|
|
218.6 |
228.5 |
9.9 |
11.61 |
783.90 |
3.51 |
2.91 |
4.56 |
28.32 |
100 |
|
and |
|
|
|
|
|
|
|
|
|
|
230.0 |
230.6 |
0.5 |
2.33 |
101.30 |
0.18 |
0.81 |
1.74 |
4.68 |
100 |
|
CMRF25-07 |
185.4 |
250.1 |
64.7 |
3.41 |
224.30 |
0.48 |
1.61 |
4.29 |
8.82 |
95 |
Including |
|
|
|
|
|
|
|
|
|
|
185.4 |
211.2 |
25.9 |
0.09 |
30.30 |
0.43 |
0.32 |
2.70 |
2.09 |
100 |
|
Including |
|
|
|
|
|
|
|
|
|
|
185.4 |
198.3 |
13.0 |
0.10 |
22.60 |
0.48 |
0.18 |
1.00 |
1.41 |
100 |
|
and |
|
|
|
|
|
|
|
|
|
|
198.3 |
211.2 |
12.9 |
0.09 |
38.00 |
0.39 |
0.46 |
4.41 |
2.80 |
100 |
|
and |
|
|
|
|
|
|
|
|
|
|
211.2 |
248.4 |
37.2 |
5.87 |
367.50 |
0.53 |
2.57 |
5.54 |
13.85 |
91 |
|
Including |
|
|
|
|
|
|
|
|
|
|
232.7 |
248.4 |
15.7 |
12.41 |
777.10 |
0.65 |
3.40 |
5.83 |
25.97 |
97 |
|
Including |
|
|
|
|
|
|
|
|
|
|
237.0 |
243.2 |
6.2 |
20.81 |
1,484.20 |
0.82 |
4.58 |
5.98 |
43.77 |
93 |
|
*True widths are estimated to be >90% of drilled intervals. |
** AuEq equation is: AuEq = Au + (Ag*0.0124) + (Cu%*1.2787) + (Pb%*0.2740) + (Zn%*0.3653), at |
|
To date, 24 underground diamond drillholes are complete totaling 5,070 metres with "HQ" and/or "NQ" sized diamond drill core at the
In addition, 2,500m are complete at the Reforma Deposit in ten surface drillholes with "HQ" and/or "PQ" sized diamond drill core. These surface drillholes represent the Phase 1 2,500m surface drilling campaign at the
Table 2: Underground and Surface Drill Collar Details for Released Results
|
UTM WGS84 |
|
|
|
|
|
Hole ID |
Easting |
Northing |
Elevation |
Azimuth |
Dip |
Depth (m) |
CMUG-25-017 |
378604 |
2011338 |
891 |
014 |
12 |
179 |
CMUG-25-019 |
379152 |
2011575 |
1,064 |
279 |
-34 |
290 |
CMUG-25-020 |
379152 |
2011575 |
1,064 |
280 |
-25 |
297 |
CMUG-25-021 |
379160 |
2011575 |
1,064 |
151 |
-42 |
396 |
CMUG-25-022 |
379159 |
2011568 |
1,064 |
150 |
-71 |
282 |
CMRF-25-02 |
380103 |
2013316 |
1,585 |
044 |
-65 |
308 |
CMRF-25-03 |
380141 |
2013196 |
1,576 |
049 |
-70 |
320 |
CMRF-25-04 |
380221 |
2013304 |
1,557 |
046 |
-47 |
200 |
CMRF-25-05 |
380223 |
2013300 |
1,557 |
020 |
-50 |
223 |
CMRF-25-06 |
380247 |
2013179 |
1,524 |
040 |
-55 |
262 |
CMRF-25-07 |
380247 |
2013179 |
1,524 |
047 |
-63 |
280 |
About 2025 Campo Morado Surface Exploration Program
Luca's inaugural surface drill program is running in parallel with the ongoing underground exploration program at Campo Morado. The Phase 1 program includes 2,500m of diamond drilling focused on definition and expansion the
Thirty-eight (38) priority targets have been identified from assessment of the substantive historical exploration database of
Of particular interest with respect to
About 2025 Campo Morado Underground Exploration Program
The current
The Company planned 5,000 metres of underground diamond drilling from approximately 25 holes during this first phase of exploration activities. This program's primary target is the definition of additional mineral resources from under-drilled zones proximal to existing underground production areas, as well as the identification of mineralization within previously untested areas with high potential for the discovery of new mineral resources.
Previous exploration at
Analytical Method and Quality Assurance/Quality Control Measures
All drill core splits reported in this news release were analysed by Bureau Veritas of
Qualified Person
The technical information contained in this news release has been reviewed and approved by Mr.
About
The Company's
On Behalf of the Board of Directors
(signed) "Dan Barnholden"
For more information, please visit: www.lucamining.com
Cautionary Note Regarding Forward-Looking Statements
Statements contained in this news release that are not historical facts are "forward-looking information" or "forward-looking statements" (collectively, "Forward-Looking Information") within the meaning of applicable Canadian securities laws. Forward Looking Information includes, but is not limited to, estimated production guidelines for 2025 and other possible events, conditions or performance that are based on assumptions about the proposed exploration program and its anticipated results; the timing and costs of future activities on the Company's properties, such as production rates and increases and sustaining capital expenditures; success of exploration, development, and metres to be drilled in exploration on the
Neither
View original content to download multimedia:https://www.prnewswire.com/news-releases/luca-drills-37-metres-of-6-gt-gold-370-gt-silver-and-6-zinc-at-campo-morado-302539761.html
SOURCE