ARRAS MINERALS DRILLS 276 METERS GRADING 0.58% CUEQ INCLUDING 104 METRES GRADING 1.14% CUEQ STARTING AT SURFACE ON BEREZSKI NORTH TARGET & ANNOUNCES CHANGES TO BOARD OF DIRECTORS
TSX-V: ARK / OTCQB: ARRKF
Highlights include:
-
EL25016: 276m of mineralization grading 0.58 % copper-equivalent ("CuEq") (0.21% Cu and 0.32 g/t Au), starting at surface; including:
- 104m grading 1.14% CuEq (0.46 % Cu, 0.63 g/t Au) starting from surface
- 52m grading 1.64% CuEq (0.72 % Cu and 0.86 g/t Au) starting at 48m depth
Results from this news release include:
Table 1. Summary results from holes EL25016
Hole_ID |
Intersection |
Interval |
Au |
Cu |
Ag |
Mo |
CuEq |
AuEq |
|
From (m) |
To (m) |
(m) |
(g/t) |
( %) |
(g/t) |
ppm |
( %) |
(g/t) |
|
EL25016 |
0.0 |
276.0 |
276.0 |
0.32 |
0.21 |
3.7 |
2.0 |
0.58 |
0.50 |
Including |
0.0 |
158.0 |
158.0 |
0.48 |
0.33 |
6.0 |
2.8 |
0.93 |
0.80 |
including |
0.0 |
104.0 |
104.0 |
0.63 |
0.46 |
4.2 |
3.5 |
1.14 |
0.97 |
including |
48.0 |
100.0 |
52.0 |
0.86 |
0.72 |
6.2 |
5.0 |
1.64 |
1.41 |
Notes: For copper and gold equivalent calculations the following metal process were used:
Table 2. Drill-hole locations
Hole_ID |
Coordinates (UTM) |
Azimuth |
Dip |
Hole Depth |
||
Easting |
Northing |
RL |
||||
EL25016 |
508114.2 |
5717557 |
236 |
050 |
-70 |
30 |
Hole EL25016: Drillhole EL25016 was drilled approximately 300m to the southeast of drill-hole EL24005 and was designed to test the extent of the hydrothermal breccias and associated mineralization. The hole was collared in highly weathered andesites from surface to 29m depth. From 29 metres to 124.5 metres, the andesites were intensely altered, fractured, and showing strong argillic alteration overprinting an earlier phyllic phase characterised by sericite-altered D-type veins. At 124.5 metres, the lithology changes into diorites containing xenoliths of monzonites, gabbros, and andesites. Alteration in this zone changes to strong inner propylitic with a weak argillic overprint along fractures.
Mineralization is most intense in the upper part of the drill hole. From 30 to 90 metres, mineralization consists of patches and disseminations of pyrite, chalcopyrite, and enargite, and at 123.4 metres, the hole intersected a fault zone where mineralization changed, becomes weaker and consisting predominantly of disseminated pyrite and chalcopyrite with occasional quartz-sulphide veins.
Overall, the drill hole continues to show that the is a vertically zoned hydrothermal system at Berezski North. In the upper part of the drill-hole, argillic-altered volcanics host high-grade copper mineralization dominated by chalcopyrite with enargite, while the deeper part of the hole are dominated by disseminated pyrite and chalcopyrite, and may represent a different part of a porphyry system that was intersected by drill-hole EL24005.
Notes: For copper and gold equivalent calculations the following metal process were used:
Elemes Phase II Drill Program: Since late June, Arras has been advancing its 20,000-metre
Elemes Project Overview:
Situated within the prolific Bozshakol-Chingiz metallogenic belt, Elemes lies near significant regional deposits, including the Beskauga porphyry copper-gold-silver deposit (~80 km east) and
Geologically, the property is underlain by interbedded intermediate volcanic and sedimentary rocks intruded by multiple phases of diorite and monzodiorite porphyry. Copper-gold mineralization occurs in sheeted and stockwork quartz-chalcopyrite veins associated with these intrusions. In addition, high-grade low-sulphidation epithermal veins have been mapped on the property, representing a secondary exploration target.
Property-wide soil sampling programs in 2022 and 2023 defined two extensive Cu-Mo-As geochemical anomalies: the Berezski and Aimandai Trends, both considered priority targets for follow-up exploration drilling. Initial drilling on the Berezski Trend in late 2024 returned high-grade porphyry/epithermal copper and gold mineralization.
Changes to Board of Directors
Effective today, Mr.
About
Stock Option Grant
The Company's Board of Directors has authorized, pursuant to its Equity Incentive Plan, the grant of 300,000 stock options ("Options") to certain directors, effective prior to the start of trading on
References
1Bozshakol 2024 Report
https://www.kazminerals.com/media/23240/q4-2024-production-report_final.pdf
Qualified Person: The scientific and technical disclosure for this news release has been prepared under supervision of and approved by Matthew Booth, Vice President of Exploration, of Arras Minerals Corp., a Qualified Person for the purposes of NI 43-101.
On behalf of the Board of Directors
"Tim Barry"
Tim Barry, MAusIMM CP(Geo)
Chief Executive Officer and Director
INVESTOR RELATIONS:
+1 604 687 5800
info@arrasminerals.com
Further information can be found on:
- the Company's website https://www.arrasminerals.com or
- follow us on LinkedIn: https://www.linkedin.com/company/arrasminerals or
- follow us on X (formerly Twitter): https://twitter.com/arrasminerals
About
Technical Disclaimer
The Company is aware of historical drilling on the Elemes property, with approximately 30 holes reportedly completed by a previous operator in 2007–2008. Efforts to validate this information have been unsuccessful, as the available data is incomplete and lacks critical details on drill hole locations, downhole surveys, assays, and geological records.
Field inspections revealed significant discrepancies, often tens to hundreds of meters between reported coordinates and the physical locations of unidentified drill collars observed on site.
Given these limitations, the Company has determined that the historical data cannot be relied upon for resource estimation or technical interpretation. Nonetheless, the results suggest that past drilling encountered copper and gold mineralization related with a porphyry–epithermal system.
The Company has not disclosed mineral resources in respect of any of its projects. All disclosure regarding the Company's projects including, without limitation, the Bozshakol copper project owned/operated by
There is no guarantee that the information presented with respect to such projects will be comparable to values calculated in accordance with NI 43-101. Information contained herein with respect to any other projects is not indicative or representative of the results that may be obtained by the Company in respect of its projects. Readers are expressly cautioned not to assume any correlation between information presented herein with respect to such other projects and the Company's projects. We assume no responsibility for any information contained herein in respect of any such other projects.
Cautionary Note to U.S. Investors concerning estimates of Measured, Indicated, and Inferred Resources: References contained in this press release uses the terms "measured resources", "indicated resources", and "inferred resources" which are defined in, and required to be disclosed by, NI43-101. The Company advises U.S. investors that these terms are not recognized by the
Cautionary note regarding forward-looking statements: This news release contains forward-looking statements regarding future events and Arras' future results that are subject to the safe harbors created under the
SOURCE