Fireweed Intersects Zinc Mineralization in 300 m Step Out at Tom South and Provides Macpass Regional Update
TSXV: FWZ
OTCQX: FWEDF
FSE: M0G
Highlights
- Hole TS25-003, a 300 metre ("m") step-out at Tom South ended with 58.30 m of laminated sulphides interbedded with black mudstones from 1,164 m downhole grading 2.33% zinc ("Zn"), 0.04% lead ("Pb"), and 1.79 g/t silver ("Ag"), including 5.24 m of 7.80% Zn, 0.05% Pb, and 2.33 g/t Ag. This intersection represents the stratigraphic interval that typically overlies the massive sulphide mineralization at Tom South. At a depth of ~1,222 m, the hole was shut down in mineralization due to seasonal constraints but will be resumed in 2026.
CEO & VP Exploration Statements
Fireweed's VP Exploration, Dr.
Summary of Results
The drill holes in this release comprise intervals from Tom South and regional zinc-primary and gold-focused exploration across several targets at Macpass. The intersection at Tom South is from an incomplete hole, terminated in mineralization and Fireweed intends to complete the hole in 2026. TS25-003 intersected mineralization 300 m down-dip of a previously reported high-grade intersection at Tom South of 30 m true width at 33.2% zinc equivalent2 that stepped out 115 m from previous drilling (hole TS25-001D1; for further details, see Fireweed's news release dated
Regional zinc and gold focused exploration in this release was carried out across four targets in the Macpass district: zinc at Harvest, and gold at
Tom South (Cross Section TH–TH')
TS25-003 was successful in intersecting 58.30 m of stratiform sulphide mineralization grading 2.33% Zn, 0.04% Pb, and 1.79 g/t Ag, including 5.24 m of 7.80% Zn, 0.05% Pb, and 2.33 g/t Ag. This interval comprises intermittent black facies from 1,164 m to the current depth of 1,222.3 m consisting of centimetre to decimetre scale beds of laminated sphalerite-mudstone interbedded with black mudstones. The intersection contains bedding and sedimentary lamination oriented sub-parallel to the core axis and has an intersected (apparent) width of at least 58.30 m. The true width of the intersection cannot be accurately estimated until completed and may be as little as 10 to 20% of the intersected width. The hole was terminated in mineralization due to inclement weather conditions and there is the potential for this mineralized zone to continue to greater depths when drilling resumes, anticipated for the start of the 2026 field season.
In other Tom South drill intersections, laminated sulphides overlie high-grade sections of high-grade massive sulphides. Fireweed cautions that the presence of massive sulphides beneath laminated sulphide mineralization in several other drill holes at Tom South does not guarantee that massive sulphides will be present once TS25-003 is advanced to greater depths.
TS25-004 was drilled approximately 100 m up-dip of previous Tom South intersections and transitioned into non-prospective footwall rocks without intersecting mineralization, interpreted as a pinch out of mineralization in the up-dip direction.
Harvest
Barite/witherite beds like those at Harvest are an attractive replacement host for zinc and lead sulphide mineralization, and the proximity to a significant surface exposure of smithsonite (zinc carbonate) and bladed barite at surface (diagnostic of boiling, a pressure change indicator which signals potential for deposition of metal) in a nearby creek indicates the continued potential for zinc mineralization in this area.
Historical drilling at
Fireweed drilled one hole, MP25-003, which intersected several felsic dykes with minor sub-parallel quartz veining, and three gold assay composite intervals above 0.05 g/t Au: 5.00 m of 0.10 g/t Au, 7.00 m of 0.13 g/t Au, and 13.00 m of 0.45 g/t Au.
A source intrusion for these felsic dykes has not been found and requires additional geophysical surveys or exploration drilling to identify.
Goliath
The Goliath target consists of elevated RIRGS pathfinder elements in rock and soil, elevated gold in rock values including one sample returning 0.57 g/t Au, and a coincident resistivity anomaly from an ELF survey corroborated by airborne geophysics ("VTEM").
MP25-006 was completed without intersecting any significant gold values, reduced dykes or intrusive rocks, suggesting the source of this geochemical anomaly may lie deeper than originally interpreted.
Centroid
The Centroid target was delineated through elevated RIRGS pathfinder elements and a co-incident resistivity signature indicative of a potential buried intrusion.
Six holes (MP25-007 through MP25-012) were drilled at Centroid attempting to identify a buried intrusion. Drilling intersected hornfelsed sedimentary lithologies indicative of a nearby intrusion; however, no significant gold mineralization or intrusions were intersected, indicating any potential intrusion may be more deeply buried.
See Tables 1, 2, and 3, Cross Sections TH–TH' and OA–OA', Long Section TG–TG' and Maps 1, 2, and 3 below for further details.
Drill Program Update
To date, the Company has released all results for drill holes of the 2025 campaign at Macpass, with 6 focused at
Planning for a 2026 drill program is well underway. Fireweed intends to focus exploration efforts around the high-grade mineralization intersected to date at Tom, targeting step-out holes at Tom South,
Qualified Person Statement
Technical information in this news release has been reviewed and approved by
About Fireweed
Fireweed is an exploration company focused on unlocking value in a new critical metals district located in
Fireweed trades on the
Additional information about Fireweed and its projects can be found on the Company's website at FireweedMetals.com and at www.sedarplus.com
ON BEHALF OF FIREWEED METALS CORP.
"
CEO & Director
Neither the
Data Verification
The diamond drill core logging and sampling program was carried out under a rigorous quality assurance / quality control program using industry best practices. Drill intersections in this release are NQ2 size (50.5 mm/ 1.99-inch diameter) and HQ size (63.5 mm/ 2.50-inch diameter) with recoveries typically above 85% unless otherwise noted in the results tables. After drilling, core was cleaned, logged for geology, structure, and geotechnical characteristics, then marked for sampling and photographed on site. Certain cores were selected for core scanning using light detection and ranging (LiDAR), short-wave infrared (SWIR), X-ray fluorescence (XRF), and high resolution RGB image capture. The cores for analyses were marked for sampling based on geological intervals with individual samples two metres or less in length, with one metre samples within mineralized zones. Drill core was cut lengthwise in half with a core saw; half-core was sent for assays reported in this news release, and the other half is stored on site for reference. Bulk density was determined on site for the entire length of each assay sample by measurement of mass in air and mass in water. Sample duplicate bulk density determinations and in-house bulk density standard determinations were each made at a rate of 5%. Since 2017, in-house bulk density that span a range of densities have been used and show acceptable long-term precision. Certified standard masses are used to calibrate the scale balance used for bulk density determinations.
A total of 5% assay standards or blanks and 5% core duplicates were included in the sample stream as a quality control measure and were reviewed after analyses were received. Standards and blanks in 2025 drill results to date have been approved as acceptable. Duplicate data add to the long-term estimates of precision for assay data on the project, and precision for reported drill results has been deemed to be within acceptable levels. Samples were sent to the Bureau Veritas (BV) preparation laboratory in
Assay values may appear rounded to one decimal place but are given in full in Table 1, and Cross Sections where gold, zinc, and lead grades are reported to two decimal places.
Results in this news release are length and bulk-density weighted averages as would be used in a Mineral Resource estimate. Length and bulk-density weighted averages have been reported as these most accurately represent the average metal-content of the intersections.
True widths for primary intervals in TS25-003 are estimated by measuring perpendicular to strike within the short axis of a stratiform wireframe that has been constructed in 3D around the mineralized intercepts at Tom based on assay results, geological logging, stratigraphic correlation, and bedding measurements from oriented core. The massive sulphide mineralization and laminated mineralization at Tom are stratiform (oriented parallel to bedding), therefore the true width, or thickness, of the zone is estimated perpendicular to both the strike and dip direction of bedding. As hole TS25-003 is not complete and remains in stratiform laminated sulphides, an estimation of true width for the total intersection is not available until the hole is completed. Current estimates for true width are based on the average angle of bedding in the stratiform sulphides relative to core axis of the drillcore. This estimate is preliminary in nature and may range between 10% to 20% of intersected width. An accurate estimate of true width will be provided upon completion of the drillhole.
Cautionary Statements
Forward Looking Statements
This news release contains "forward-looking" statements and information ("forward-looking statements"). All statements, other than statements of historical facts, included herein, including, without limitation, statements relating to interpretation of drill results, targets for exploration, potential extensions of mineralized zones, and the potential of the Company's projects, are forward looking statements. Forward-looking statements are frequently, but not always, identified by words such as "expects", "anticipates", "believes", "intends", "estimates", "potential", "possible", and similar expressions, or statements that events, conditions, or results "will", "may", "could", or "should" occur or be achieved. Forward-looking statements are based on the beliefs of Company management, as well as assumptions made by and information currently available to Company management and reflect the beliefs, opinions, and projections on the date the statements are made. Forward-looking statements involve various risks and uncertainties and accordingly, readers are advised not to place undue reliance on forward-looking statements. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's expectations include but are not limited to, exploration and development risks, unanticipated reclamation expenses, expenditure and financing requirements, general economic conditions, changes in financial markets, the ability to properly and efficiently staff the Company's operations, the sufficiency of working capital and funding for continued operations, title matters, First Nations relations, operating hazards, political and economic factors, competitive factors, metal prices, relationships with vendors and strategic partners, governmental regulations and oversight, permitting, seasonality and weather, technological change, industry practices, uncertainties involved in the interpretation of drilling results and laboratory tests, and one-time events. The Company assumes no obligation to update forward‐looking statements or beliefs, opinions, projections or other factors, except as required by law.
Footnotes and References
|
1: For Tom, Jason,
|
|
2: Zinc equivalent calculations assume metal prices of
|
|
*: Estimates of true width are preliminary in nature and range between 5 to 20% of intersected thickness. A revised estimate will be provided once the hole is drilled to completion and additional information is available to make a more refined estimate. |
Table 1: Tom Analytical Results
|
Drillhole |
Interval |
From |
To |
Interval |
Zinc |
Lead |
Silver |
Gallium |
Germanium |
Bulk |
|
TS25-003 |
Primary |
1164.00 |
1222.30 |
58.30 |
2.33 |
0.04 |
1.79 |
10.23 |
2.68 |
2.75 |
|
TS25-003 |
Including |
1193.76 |
1199.00 |
5.24 |
7.80 |
0.05 |
2.33 |
9.72 |
3.00 |
2.74 |
Table 2: Oro Analytical Results
|
Drillhole |
Interval |
From (m) |
To (m) |
Interval |
Gold (g/t) |
Bulk |
|
MP25-003 |
Primary |
200.00 |
205.00 |
5.00 |
0.10 |
2.81 |
|
MP25-003 |
Primary |
214.00 |
221.00 |
7.00 |
0.13 |
2.74 |
|
MP25-003 |
Primary |
248.00 |
261.00 |
13.00 |
0.45 |
2.76 |
Table 3: 2025 Drilling Summary
|
Drillhole |
Length (m) |
Zone |
Significant Intersection |
Type |
|
NB25-001 |
62.00 |
|
Results Disclosed |
Step Out |
|
NB25-002 |
535.00 |
|
Results Disclosed |
Step Out |
|
NB25-003 |
187.75 |
|
Results Disclosed |
Step Out |
|
NB25-004 |
242.00 |
|
Results Disclosed |
Step Out |
|
NB25-005 |
198.00 |
|
Results Disclosed |
Step Out |
|
NB25-006 |
79.00 |
|
Results Disclosed |
Exploration |
|
MP25-001 |
205.00 |
Target B |
Results Disclosed |
Exploration |
|
MP25-002 |
354.00 |
Steele |
Results Disclosed |
Exploration |
|
MP25-003 |
392.00 |
|
Results disclosed in this release |
Exploration |
|
MP25-004 |
258.00 |
Harvest |
Results disclosed in this release |
Exploration |
|
MP25-005 |
245.00 |
Harvest |
Results disclosed in this release |
Exploration |
|
MP25-006 |
542.00 |
Goliath |
Results disclosed in this release |
Exploration |
|
MP25-007 |
400.00 |
Centroid |
Results disclosed in this release |
Exploration |
|
MP25-008 |
466.00 |
Centroid |
Results disclosed in this release |
Exploration |
|
MP25-009 |
401.00 |
Centroid |
Results disclosed in this release |
Exploration |
|
MP25-010 |
123.00 |
Centroid |
Results disclosed in this release |
Exploration |
|
MP25-011 |
242.00 |
Centroid |
Results disclosed in this release |
Exploration |
|
MP25-012 |
160.00 |
Centroid |
Results disclosed in this release |
Exploration |
|
TS25-001 |
801.00 |
Tom South |
Results Disclosed |
Step Out |
|
TS25-001D1 |
963.00 |
Tom South |
Results Disclosed |
Step Out |
|
TS25-002 |
800.00 |
|
Results Disclosed |
Infill |
|
TS25-002D1 |
338.00 |
|
Results Disclosed |
Infill |
|
TS25-003 |
1222.50 |
Tom South |
Results disclosed in this release |
Step Out |
|
TS25-004 |
551.00 |
Tom South |
Results disclosed in this release |
Step Out |
Table 4: Macpass Drill Hole Collar Information
|
Drillhole |
Zone |
Length (m) |
Easting |
Northing |
Elevation (m.s.l) |
Azimuth (°) |
Dip (°) |
|
MP25-001 |
Regional |
205.00 |
431663.56 |
7005073.72 |
1258.67 |
205.03 |
-51.30 |
|
MP25-002 |
Regional |
354.00 |
409349.00 |
7018979.00 |
1490.00 |
019.92 |
-50.29 |
|
MP25-003 |
Regional |
392.00 |
401002.00 |
7020117.00 |
1428.00 |
050.19 |
-50.83 |
|
MP25-004 |
Regional |
258.00 |
417801.00 |
7018103.00 |
1413.00 |
150.88 |
-59.12 |
|
MP25-005 |
Regional |
245.00 |
417929.00 |
7018313.00 |
1297.00 |
190.02 |
-54.82 |
|
MP25-006 |
Regional |
542.00 |
415990.00 |
7018227.00 |
1466.00 |
140.66 |
-50.07 |
|
MP25-007 |
Regional |
400.00 |
427407.00 |
7011974.00 |
1450.00 |
169.99 |
-74.54 |
|
MP25-008 |
Regional |
466.00 |
427932.00 |
7011655.00 |
1538.00 |
000.49 |
-75.62 |
|
MP25-009 |
Regional |
401.00 |
428051.00 |
7012179.00 |
1548.00 |
000.44 |
-55.14 |
|
MP25-010 |
Regional |
123.00 |
428126.00 |
7012474.00 |
1716.00 |
000.00 |
-59.83 |
|
MP25-011 |
Regional |
242.00 |
428797.00 |
7011739.00 |
1844.00 |
025.48 |
-49.87 |
|
MP25-012 |
Regional |
160.00 |
428126.00 |
7012474.00 |
1716.00 |
359.98 |
-70.22 |
|
NB25-001 |
Boundary |
62.00 |
422469.38 |
7010518.89 |
1193.09 |
025.00 |
-70.00 |
|
NB25-002 |
Boundary |
535.00 |
422469.38 |
7010518.89 |
1193.09 |
027.37 |
-70.21 |
|
NB25-003 |
Boundary |
187.75 |
422668.21 |
7010230.31 |
1131.81 |
216.10 |
-49.58 |
|
NB25-004 |
Boundary |
242.00 |
422656.00 |
7010291.00 |
1140.38 |
215.32 |
-49.51 |
|
NB25-005 |
Boundary |
198.00 |
422581.16 |
7010273.67 |
1133.71 |
214.79 |
-59.46 |
|
NB25-006 |
Boundary |
79.00 |
421920.28 |
7010301.58 |
1137.44 |
004.83 |
-50.01 |
|
TS25-001 |
Tom South |
801.00 |
442371.80 |
7003057.00 |
1753.16 |
179.47 |
-89.93 |
|
TS25-001D1 |
Tom South |
963.00 |
442371.80 |
7003057.00 |
1753.16 |
179.47 |
-89.93 |
|
TS25-002 |
|
800.00 |
441812.16 |
7003717.89 |
1536.01 |
047.71 |
-68.81 |
|
TS25-002D1 |
|
338.00 |
441812.16 |
7003717.89 |
1536.01 |
047.71 |
-68.81 |
|
TS25-003 |
Tom South |
1222.50 |
442396.15 |
7002787.36 |
1758.79 |
315.50 |
-87.90 |
|
TS25-004 |
Tom South |
551.00 |
442327.05 |
7003265.97 |
1734.33 |
358.04 |
-78.28 |
|
Coordinates listed in |
SOURCE