LITEON Showcases Next-Generation 800 VDC and NVIDIA Vera Rubin Platform Solutions at NVIDIA GTC 2026
Empowering Enterprises to Deploy Megawatt-Scale AI Data Centers based on NVIDIA MGX
|
News Summary
|
As AI workloads drive rapid increases in rack power density, data-center power architectures are undergoing structural transformation. Traditional power-shelf architectures face efficiency and current-handling limitations when supporting megawatt-scale AI clusters. In an 800 VDC environment, power architectures are gradually shifting toward a power rack configuration. By increasing system voltage and reducing current load, this approach fundamentally improves power distribution efficiency and overcomes limitations in power density. This evolution represents not only a power-system upgrade, but also a re-architecture of data-center infrastructure.
LITEON's 800 VDC solution integrates high-efficiency power modules, DC distribution designs, and system-level energy-management capabilities. It supports the stringent dynamic-load requirements of AI servers and accelerated computing platforms while enabling greater flexibility for liquid-cooling and thermal-management systems. The high-voltage architecture simplifies the power hierarchy inside data centers and enhances deployment speed and long-term operational efficiency.
"AI data centers are entering a critical phase where power and thermal systems must be re‑architected together," said
As AI computing platforms rapidly expand, LITEON will continue deepening collaboration with ecosystem partners and advancing power-optimization technologies for high-performance GPUs and AI‑accelerated systems. Through close collaboration with NVIDIA in high-performance computing (HPC) and AI infrastructure, LITEON is accelerating its development of next-generation integrated data-center solutions, covering 800 VDC, high-efficiency power conversion, mechanical design, and liquid-cooling integration. These efforts address the structural requirements for high energy efficiency, high power density, and operational resilience in the AI era.
For more information, please visit: https://www.liteon.com/zh-tw/solutions/green-data-center.
LITEON Technology at 2026 GTC:
Date: March 16–19, 2026
Venue:
Booth: 635
View original content to download multimedia:https://www.prnewswire.com/news-releases/liteon-showcases-next-generation-800-vdc-and-nvidia-vera-rubin-platform-solutions-at-nvidia-gtc-2026-302715737.html
SOURCE LITEON Technology