LUCA INTERSECTS 118 METRES OF 2.5 G/T GOLD, 78.0 G/T SILVER, 0.8% COPPER, 0.6% PB AND 2.0% ZINC AT LARGO NORTE ZONE, CAMPO MORADO MINE
Highlights
- Continued success in the definition of high-grade, gold and silver-rich VMS mineralization in areas immediately adjacent to active underground workings at Campo Morado
- Underground drillhole CMUG-26-38 intersected 118.2 metres ("m") of 2.53 g/t Au, 77.89 g/t Ag, 0.76% Cu, 0.57% Pb and 1.99% Zn from 179.9m, defining expanded mineralization in the unmined
Largo Norte zone - Underground drillhole CMUG-26-39 intersected 100.7m of 2.80 g/t Au, 90.72 g/t Ag, 0.59% Cu, 0.71% Pb and 2.59% Zn from 113.0m, expanding previously defined mineralization in the unmined
Largo Norte zone - Underground drillhole CMUG-26-37 intersected 77.1m of 2.31 g/t Au, 47.05 g/t Ag, 0.77% Cu, 0.24% Pb and 0.96% Zn from 182.0m
- Underground drillhole CMUG-26-41 intersected 71.0m of 1.57 g/t Au, 20.12 g/t Ag, 0.72% Cu, 0.07% Pb and 0.39% Zn from 113.5m, with the entirety of the mineralized intercept outside of the Largo Norte resource, and together with CMUG-26-36 (See Company News Release of
February 17, 2026 ) have combined to expand mineralization up to approximately 20m beyond the current extents - Exploration drilling operations continue at
Campo Morado with two surface drill rigs and one underground drill rig
"Based on the success of CMUG-26-36, a follow-up drill program was implemented to better define and target potential mineralization extensions in this under-drilled area of the
Near-Mine Underground Drilling
Underground drillhole CMUG-26-37 through CMUG-26-41 targeted the Largo Norte zone and successfully intersected mineralization in each of these drillholes from this unmined zone, including:
- CMUG-26-37:
- 77.1m of 2.31 g/t Au, 47.05 g/t Ag, 0.77% Cu, 0.24% Pb and 0.96% Zn from 182.0m, including 14.0m of 2.06 g/t Au, 43.03 g/t Ag, 0.94% Cu, 0.26% Pb and 1.11% Zn from 199.0m and 5.0m of 6.05 g/t Au, 50.76 g/t Ag, 0.45% Cu, 0.41% Pb and 2.29% Zn from 217.5m
- CMUG-26-38:
- intersected 118.2m of 2.53 g/t Au, 77.89 g/t Ag, 0.76% Cu, 0.57% Pb and 1.99% Zn from 179.9m, including 3.0m of 5.18 g/t Au, 37.07 g/t Ag, 0.72% Cu, 0.37% Pb and 0.82% Zn from 183.6m and 20.8m of 4.02 g/t Au, 180.72 g/t Ag, 0.47% Cu, 2.02% Pb and 3.90% Zn from 275.3m
- CMUG-26-39:
- 100.7m of 2.80 g/t Au, 90.72 g/t Ag, 0.59% Cu, 0.71% Pb and 2.59% Zn from 113.0m, including 35.1m of 3.99 g/t Au, 131.32 g/t Ag, 0.57% Cu, 0.88% Pb and 3.59% Zn from 153.6m and a high grade section of 14.4m of 3.16 g/t Au, 172.31 g/t Ag, 1.88% Cu, 1.27% Pb and 1.56% Zn from 287.8m
- CMUG-26-40:
- 1.8m of 1.36 g/t Au, 17.51 g/t Ag, 0.92% Cu, 0.05% Pb and 0.03% Zn from 22.2m; and 1.5m of 2.48 g/t Au, 5.40 g/t Ag, 0.08% Cu, 0.01% Pb and 0.01% Zn from 238.8m
- CMUG-26-41:
- 71.0m of 1.57 g/t Au, 20.12 g/t Ag, 0.72% Cu, 0.07% Pb and 0.39% Zn from 113.5m, including 5.4m of 2.39 g/t Au, 29.35 g/t Ag, 1.07% Cu, 0.08% Pb and 0.25% Zn from 155.0m
These recent intersections underscore the multiple opportunities to add additional mineable resources proximal to current development headings, existing infrastructure and expand previously defined mineral resources.
Drilling continues at
Table 1: Highlighted Diamond Drill Assay Results from UG Drillholes CMUG-26-37 through CMUG-26-41.
|
Hole ID |
From (m) |
To (m) |
Interval (m)* |
Au g/t |
Ag g/t |
Cu% |
Pb% |
Zn% |
|
CMUG-26-37 |
47.6 |
48.2 |
0.6 |
1.59 |
52.20 |
0.48 |
0.20 |
0.70 |
|
75.0 |
86.6 |
11.6 |
1.21 |
29.75 |
0.75 |
0.13 |
0.95 |
|
|
103.5 |
106.5 |
3.0 |
0.83 |
62.95 |
0.87 |
0.10 |
0.45 |
|
|
106.5 |
118.5 |
12.0 |
1.61 |
39.68 |
0.72 |
0.20 |
1.63 |
|
|
165.4 |
259.1 |
93.6 |
2.01 |
40.38 |
0.70 |
0.20 |
0.83 |
|
|
Including |
|
|
|
|
|
|
|
|
|
182.0 |
259.1 |
77.1 |
2.31 |
47.05 |
0.77 |
0.24 |
0.96 |
|
|
|
Including |
|
|
|
|
|
|
|
|
182.0 |
189.0 |
7.0 |
3.77 |
43.77 |
0.47 |
0.08 |
0.79 |
|
|
|
And |
|
|
|
|
|
|
|
|
192.0 |
199.0 |
7.0 |
1.27 |
45.48 |
1.89 |
0.09 |
0.40 |
|
|
|
And |
|
|
|
|
|
|
|
|
199.0 |
213.0 |
14.0 |
2.06 |
43.03 |
0.94 |
0.26 |
1.11 |
|
|
|
And |
|
|
|
|
|
|
|
|
213.0 |
217.5 |
4.5 |
0.98 |
37.92 |
0.82 |
0.13 |
0.64 |
|
|
|
And |
|
|
|
|
|
|
|
|
217.5 |
222.5 |
5.0 |
6.05 |
50.76 |
0.45 |
0.41 |
2.29 |
|
|
|
And |
|
|
|
|
|
|
|
|
229.5 |
238.4 |
8.9 |
1.42 |
49.54 |
0.64 |
0.45 |
1.14 |
|
|
|
And |
|
|
|
|
|
|
|
|
238.4 |
251.8 |
13.4 |
3.18 |
92.51 |
0.56 |
0.29 |
1.41 |
|
|
|
And |
|
|
|
|
|
|
|
|
251.8 |
259.1 |
7.3 |
1.89 |
52.65 |
0.64 |
0.14 |
0.47 |
|
|
CMUG-26-38 |
74.8 |
140.0 |
65.2 |
1.21 |
25.91 |
1.24 |
0.12 |
0.37 |
|
Including |
|
|
|
|
|
|
|
|
|
80.5 |
116.4 |
35.8 |
1.55 |
28.50 |
1.56 |
0.11 |
0.30 |
|
|
|
Including |
|
|
|
|
|
|
|
|
80.5 |
90.2 |
9.7 |
2.21 |
27.77 |
2.15 |
0.09 |
0.30 |
|
|
|
And |
|
|
|
|
|
|
|
|
99.8 |
103.1 |
3.3 |
1.11 |
25.55 |
2.08 |
0.06 |
0.14 |
|
|
And |
|
|
|
|
|
|
|
|
|
136.3 |
139.5 |
3.2 |
1.35 |
31.83 |
0.85 |
0.24 |
0.88 |
|
|
179.9 |
298.1 |
118.2 |
2.53 |
77.89 |
0.76 |
0.57 |
1.99 |
|
|
Including |
|
|
|
|
|
|
|
|
|
183.6 |
186.5 |
3.0 |
5.18 |
37.70 |
0.72 |
0.37 |
0.82 |
|
|
Including |
|
|
|
|
|
|
|
|
|
194.5 |
204.5 |
10.1 |
3.15 |
42.21 |
0.90 |
0.14 |
0.47 |
|
|
And |
|
|
|
|
|
|
|
|
|
214.4 |
230.6 |
16.2 |
3.03 |
59.79 |
0.61 |
0.43 |
1.98 |
|
|
And |
|
|
|
|
|
|
|
|
|
236.2 |
252.8 |
16.6 |
2.75 |
58.65 |
1.09 |
0.21 |
1.59 |
|
|
And |
|
|
|
|
|
|
|
|
|
258.4 |
275.3 |
16.8 |
1.70 |
90.93 |
0.83 |
0.42 |
3.51 |
|
|
And |
|
|
|
|
|
|
|
|
|
275.3 |
296.0 |
20.8 |
4.02 |
180.72 |
0.47 |
2.02 |
3.90 |
|
|
CMUG-26-39 |
26.1 |
27.7 |
1.7 |
1.29 |
25.80 |
1.31 |
0.11 |
0.14 |
|
85.0 |
86.5 |
1.5 |
1.95 |
30.40 |
2.08 |
0.05 |
0.37 |
|
|
91.4 |
92.4 |
1.0 |
2.43 |
9.80 |
0.62 |
0.19 |
0.50 |
|
|
94.4 |
98.4 |
4.0 |
0.58 |
23.28 |
1.62 |
0.03 |
0.16 |
|
|
100.4 |
105.4 |
5.0 |
0.74 |
43.12 |
1.77 |
0.08 |
0.30 |
|
|
113.0 |
213.7 |
100.7 |
2.80 |
90.72 |
0.59 |
0.71 |
2.59 |
|
|
Including |
|
|
|
|
|
|
|
|
|
118.7 |
129.6 |
10.9 |
0.95 |
45.63 |
0.79 |
0.21 |
1.90 |
|
|
And |
|
|
|
|
|
|
|
|
|
129.6 |
135.6 |
6.0 |
1.05 |
37.18 |
0.64 |
0.18 |
0.88 |
|
|
And |
|
|
|
|
|
|
|
|
|
135.6 |
140.6 |
5.0 |
2.49 |
57.52 |
0.56 |
0.76 |
2.21 |
|
|
And |
|
|
|
|
|
|
|
|
|
140.6 |
146.6 |
6.0 |
3.95 |
100.37 |
0.65 |
1.09 |
5.85 |
|
|
And |
|
|
|
|
|
|
|
|
|
146.6 |
153.6 |
7.0 |
2.80 |
65.61 |
0.42 |
0.61 |
5.26 |
|
|
And |
|
|
|
|
|
|
|
|
|
153.6 |
188.7 |
35.1 |
3.99 |
131.32 |
0.57 |
0.88 |
3.59 |
|
|
And |
|
|
|
|
|
|
|
|
|
188.7 |
195.0 |
6.3 |
1.94 |
77.29 |
0.55 |
0.36 |
0.46 |
|
|
And |
|
|
|
|
|
|
|
|
|
195.0 |
199.0 |
4.0 |
2.50 |
74.55 |
0.61 |
0.35 |
0.57 |
|
|
And |
|
|
|
|
|
|
|
|
|
199.0 |
203.1 |
4.1 |
1.44 |
64.10 |
0.63 |
0.86 |
1.10 |
|
|
And |
|
|
|
|
|
|
|
|
|
203.1 |
213.7 |
10.6 |
3.47 |
118.02 |
0.52 |
1.36 |
0.97 |
|
|
225.8 |
302.2 |
76.4 |
1.83 |
92.61 |
0.77 |
0.79 |
2.47 |
|
|
Including |
|
|
|
|
|
|
|
|
|
227.3 |
234.0 |
6.7 |
1.94 |
46.69 |
0.79 |
0.20 |
1.09 |
|
|
And |
|
|
|
|
|
|
|
|
|
246.0 |
263.0 |
17.0 |
1.90 |
82.32 |
0.47 |
0.88 |
4.33 |
|
|
And |
|
|
|
|
|
|
|
|
|
263.0 |
273.6 |
10.6 |
1.08 |
78.50 |
0.29 |
0.90 |
4.13 |
|
|
And |
|
|
|
|
|
|
|
|
|
273.6 |
279.5 |
5.9 |
1.24 |
91.73 |
0.20 |
0.93 |
2.62 |
|
|
And |
|
|
|
|
|
|
|
|
|
284.2 |
287.8 |
3.6 |
1.69 |
176.30 |
0.37 |
2.35 |
4.12 |
|
|
And |
|
|
|
|
|
|
|
|
|
287.8 |
302.2 |
14.4 |
3.16 |
172.31 |
1.88 |
1.27 |
1.56 |
|
|
CMUG-26-40 |
22.2 |
24.0 |
1.8 |
1.36 |
17.51 |
0.92 |
0.05 |
0.03 |
|
238.8 |
240.3 |
1.5 |
2.48 |
5.40 |
0.08 |
0.01 |
0.01 |
|
|
CMUG-26-41 |
113.5 |
184.5 |
71.0 |
1.57 |
20.12 |
0.72 |
0.07 |
0.39 |
|
Including |
|
|
|
|
|
|
|
|
|
114.9 |
122.7 |
7.9 |
1.40 |
22.64 |
0.79 |
0.11 |
0.50 |
|
|
And |
|
|
|
|
|
|
|
|
|
128.1 |
133.9 |
5.8 |
1.98 |
13.35 |
0.58 |
0.08 |
0.32 |
|
|
|
Including |
|
|
|
|
|
|
|
|
129.1 |
130.1 |
1.0 |
4.36 |
11.20 |
0.27 |
0.20 |
0.89 |
|
|
And |
|
|
|
|
|
|
|
|
|
137.0 |
148.1 |
11.1 |
1.43 |
19.57 |
0.73 |
0.06 |
0.36 |
|
|
And |
|
|
|
|
|
|
|
|
|
148.1 |
152.8 |
4.8 |
3.20 |
29.80 |
1.08 |
0.10 |
0.36 |
|
|
And |
|
|
|
|
|
|
|
|
|
155.0 |
160.4 |
5.4 |
2.39 |
29.35 |
1.07 |
0.08 |
0.25 |
|
|
And |
|
|
|
|
|
|
|
|
|
161.8 |
165.8 |
4.0 |
3.25 |
34.58 |
1.12 |
0.09 |
0.41 |
|
|
And |
|
|
|
|
|
|
|
|
|
165.8 |
172.6 |
6.8 |
1.72 |
21.44 |
0.56 |
0.09 |
0.26 |
|
|
204.6 |
205.9 |
1.3 |
2.60 |
4.40 |
0.15 |
0.01 |
0.51 |
|
|
270.6 |
272.6 |
2.0 |
2.04 |
30.00 |
2.43 |
0.02 |
0.22 |
|
|
282.1 |
286.7 |
4.6 |
0.25 |
19.74 |
0.20 |
2.31 |
5.04 |
|
*CMUG-26-37 through CMUG-26-41 were all drilled parallel to the mineralized body which ranges from 20 to 60m in thickness and has a known length of up to 650m. |
Figures 1 through 5 present assay results from this latest batch of results and location maps of all drillholes presented in this news release.
About Campo Morado Exploration Program
The current
To date, 47 underground diamond drillholes totaling 10,880m have been completed at the
In addition, 11,570m have been drilled from 44 surface drillholes at the
Previous exploration at
Table 2: Underground and Surface Drill Collar Details for Released Results
|
Hole ID |
UTM WGS84 Z14 |
Elevation (m) |
Azimuth |
Dip |
Final Depth (m) |
|
|
Easting |
Northing |
|||||
|
CMUG-26-37 |
379210 |
2012134 |
1,132 |
36 |
34 |
275 |
|
CMUG-26-38 |
379207 |
2012132 |
1,132 |
25 |
34 |
323 |
|
CMUG-26-39 |
379207 |
2012132 |
1,132 |
18 |
31 |
316 |
|
CMUG-26-40 |
379207 |
2012132 |
1,132 |
18 |
24 |
261 |
|
CMUG-26-41 |
379208 |
2012132 |
1,131 |
6 |
33 |
352 |
Analytical Method and Quality Assurance/Quality Control Measures
All drill core splits reported in this news release were analysed by Bureau Veritas of
Qualified Person
The technical information contained in this news release has been reviewed and approved by Mr.
About
The
On Behalf of the Board of Directors
(signed) "
For more information, please visit: www.lucamining.com
Cautionary Note Regarding Forward-Looking Statements
Statements contained in this news release that are not historical facts are "forward-looking information" or "forward-looking statements" (collectively, "Forward-Looking Information") within the meaning of applicable Canadian securities laws. Forward Looking Information includes, but is not limited to, estimated production guidelines for 2026 and other possible events, conditions or performance that are based on assumptions about the proposed exploration program and its anticipated results; the timing and costs of future activities on the Company's properties, such as production rates and increases and sustaining capital expenditures; success of exploration, development, and metres to be drilled in exploration on the
Neither
View original content to download multimedia:https://www.prnewswire.com/news-releases/luca-intersects-118-metres-of-2-5-gt-gold-78-0-gt-silver-0-8-copper-0-6-pb-and-2-0-zinc-at-largo-norte-zone-campo-morado-mine-302755167.html
SOURCE