Power Metallic intercepts 17.45 Meters of 9.47% CuEqRec¹ in Hole 26-094 and 39 Meters of 5.66% CuEqRec¹ in Hole 26-101 at Lion
Lion Zone MRE Infill Program
Drilling continued to define the high-grade
The 2026 winter drill campaign continues to support the modelled interpretation of the
Hole PML-26-101 tested the zone approximately 100 m east of PML-26-094 at a slightly deeper vertical depth and contained high grade over a very wide intersection with 39.00 m @ 5.66% CuEqRec1 including 9.20 m @ 15.18% CuEqRec1. A further 100 m west hole PML-26-104 tested the western edge of the
|
Table 1: Lion Results - Winter 2026 |
||||||||||
|
Hole |
From |
To |
Length |
Au |
Ag |
Cu |
Pd |
Pt |
Ni |
CuEq Rec* |
|
(m) |
(m) |
(m) |
(g/t) |
( g/t ) |
( %) |
(g/t) |
( g/t ) |
( %) |
( %) |
|
|
LION MRE |
||||||||||
|
PML-26-094 |
134.60 |
152.05 |
17.45 |
0.53 |
23.76 |
4.43 |
7.07 |
3.11 |
0.23 |
9.47 |
|
Including |
134.60 |
140.90 |
6.30 |
0.74 |
36.22 |
8.11 |
12.83 |
8.19 |
0.41 |
17.91 |
|
PML-26-101 |
120.00 |
159.00 |
39.00 |
1.04 |
16.27 |
1.89 |
3.51 |
3.34 |
0.13 |
5.66 |
|
Including |
146.50 |
155.70 |
9.20 |
2.96 |
31.99 |
6.91 |
6.33 |
6.90 |
0.43 |
15.18 |
|
PML-26-104 |
115.60 |
123.00 |
7.40 |
0.20 |
4.20 |
0.53 |
0.50 |
0.23 |
0.04 |
1.07 |
|
Note: Reported length is downhole distance; true width based on model projections is estimated as 85% of downhole length |
1 Copper Equivalent Rec Calculation (CuEqRec1)
CuEqRec represents CuEq calculated based on the following metal prices (USD) : 2,360.15 $/oz Au, 27.98 $/oz Ag, 1,215.00 $/oz Pd, 1000.00 $/oz Pt, 4.00 $/lb Cu, 10.00 $/lb Ni and 22.50 $/lb Co., and recovered grades based on recent locked-cycle metallurgical recoveries by
Power Metallic is expecting more assay results from the MRE drilling and the regional exploration in the coming days and weeks.
Exploratory Drilling – Between Lion and Tiger
Drill holes PML-26-071, 074, and 078 were designed to test relatively shallow depths to explore for additional zones of mineralization between Lion and Tiger. While none of the holes hit sufficiently wide zones of mineralization, narrow zones included 0.8 meters @ 0.33% Cu, 0.78 g/t Pd, and 0.35 g/t Pt in hole PML-26-074, indicating the mineralizing structures are still present in the Lion to Tiger area.
"The heart of Lion continues to deliver impressive results. Both of these holes would have broken into our top six holes at the
Qualified Person
About
Power Metallic is a Canadian exploration company focused on advancing the Nisk Project Area (Nisk–Lion–Tiger)—a high–grade Copper–PGE, Nickel, gold and silver system—toward
On
Power Metallic is expanding mineralization at the Nisk and Lion discovery zones, evaluating the Tiger target, and exploring the enlarged land package through successive drill programs.
Beyond the Nisk Project Area, Power Metallic indirectly has an interest in significant land packages in
It also owns 100% of Power Metallic Arabia which owns 100% interest in the Jabul Baudan exploration license in The Kingdon of
For further information, readers are encouraged to contact:
Neither the
QAQC and Sampling
All core in this news release is NQ sized core. Drill core is re-fitted and measured. Geotech on core includes photographs (wet & dry), rock quality index, magnetic susceptibility, conductivity, and recovery estimates. Core is logged for lithology, mineralogy, and structural features, and sample intervals are delineated and tagged.
Sampled core is mechanically sawn, and half-core is retained for future reference. GeoVector's QAQC program includes regular insertion of CRM standards, duplicates, and blanks into the sample stream with a stringent review of all results. QAQC and data validation was performed, and no material errors were observed.
All samples were submitted to and analyzed at
Cautionary Note Regarding Forward-Looking Statements
This message contains certain statements that may be deemed "forward-looking statements" concerning the Company within the meaning of applicable securities laws. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "potential," "indicates," "opportunity," "possible" and similar expressions, or that events or conditions "will," "would," "may," "could" or "should" occur. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, are subject to risks and uncertainties, and actual results or realities may differ materially from those in the forward-looking statements. Such material risks and uncertainties include, but are not limited to, among others; the timing for various drilling plans; the ability to raise sufficient capital to fund its obligations under its property agreements going forward and conduct drilling and exploration; to maintain its mineral tenures and concessions in good standing; to explore and develop its projects; changes in economic conditions or financial markets; the inherent hazards associates with mineral exploration and mining operations; future prices of nickel and other metals; changes in general economic conditions; accuracy of mineral resource and reserve estimates; the potential for new discoveries; the ability of the Company to obtain the necessary permits and consents required to explore, drill and develop the projects and if accepted, to obtain such licenses and approvals in a timely fashion relative to the Company's plans and business objectives for the applicable project; the general ability of the Company to monetize its mineral resources; and changes in environmental and other laws or regulations that could have an impact on the Company's operations, compliance with environmental laws and regulations, dependence on key management personnel and general competition in the mining industry.
View original content to download multimedia:https://www.prnewswire.com/news-releases/power-metallic-intercepts-17-45-meters-of-9-47-cueqrec-in-hole-26-094-and-39-meters-of-5-66-cueqrec-in-hole-26-101-at-lion-302760848.html
SOURCE