P2 Gold Intersects 0.69 g/t Gold and 0.25% Copper Over 74.68 Meters, Including 1.32 g/t Gold and 0.38% Copper over 30.48 meters at Lucky Strike Zone
Drilling Highlights
Select drill results (see Table 1 below for drill results) from holes GBR-097 to 101 and GBR-107 to 111 drilled at the
-
Hole GBR-099 intersected 0.69 g/t gold and 0.25% copper over 74.68 meters from 149.35 meters downhole, including 30.48 meters grading 1.32 g/t gold and 0.38% copper starting 150.88 meters downhole and ended in mineralization;
-
Hole GBR-110 intersected 0.72 g/t gold and 0.31% copper over 44.20 meters starting 92.96 meters downhole, including 15.24 meters grading 0.93 g/t gold and 0.31% copper starting 94.49 meters downhole and also intersected 0.19 g/t gold and 0.18% copper over 30.48 meters starting 164.59 meters downhole;
- Hole GBR-111 intersected 0.71 g/t gold and 0.30% copper over 70.10 meters from 134.11 meters downhole, including 15.24 meters grading 0.99 g/t gold and 0.40% copper starting 137.16 meters downhole and ended in mineralization.
Drill holes GBR-107 to 111 were drilled on the western half of the
The available drill data confirms that the ore controls at Lucky Strike are the same as at the
Since the start of the Program in
On completion of the Infill and Expansion Drill Program, an updated Mineral Resource estimate will be prepared for Gabbs, which is expected to be completed in the third quarter of 2026. The updated Mineral Resource estimate will form the basis of a feasibility study on placing Gabbs in production, which is expected to be completed in the fourth quarter of 2026.
Table 1: Selected Gabbs Drill Results,
|
Hole |
Collar |
Dip/
|
From
|
To
|
Interval
|
Gold
|
Copper
|
|
GBR-097 |
N4293703/ |
-90/0 |
153.92 |
195.07 |
41.15 |
0.46 |
0.14 |
|
|
|
incl |
167.64 |
179.83 |
12.19 |
0.85 |
0.16 |
|
GBR-098 |
N4293708/ |
-70/45 |
161.54 |
169.16 |
7.62 |
0.15 |
0.12 |
|
GBR-099(4) |
N4293708/ |
-60/315 |
149.35 |
224.03 |
74.68 |
0.69 |
0.25 |
|
|
|
incl |
150.88 |
181.36 |
30.48 |
1.32 |
0.38 |
|
GBR-100(4) |
N4293703/ |
-55/225 |
176.78 |
217.93 |
41.15 |
0.22 |
0.06 |
|
|
|
|
217.93 |
266.70 |
48.77 |
0.34 |
0.16 |
|
|
|
incl |
217.93 |
233.17 |
15.24 |
0.48 |
0.21 |
|
GBR-101 |
N4293703/ |
-70/135 |
176.78 |
196.60 |
19.81 |
0.23 |
0.08 |
|
GBR-107 |
N4293873/ |
-90/0 |
106.68 |
173.74 |
67.06 |
0.56 |
0.24 |
|
|
|
FM (3) |
173.74 |
211.84 |
38.10 |
0.18 |
0.15 |
|
GBR-108 |
N4293873/ |
-60/225 |
102.11 |
176.78 |
74.68 |
0.59 |
0.24 |
|
|
|
incl |
129.54 |
146.30 |
16.76 |
0.79 |
0.28 |
|
|
|
FM (3) |
190.50 |
216.41 |
25.91 |
0.14 |
0.17 |
|
GBR-109 |
N4293873/ |
-70/135 |
114.30 |
167.64 |
53.34 |
0.57 |
0.24 |
|
|
|
FM (3) |
167.64 |
187.45 |
19.81 |
0.24 |
0.14 |
|
GBR-110 |
N4293873/ |
-60/315 |
92.96 |
137.16 |
44.20 |
0.72 |
0.31 |
|
|
|
incl |
94.49 |
109.73 |
15.24 |
0.93 |
0.31 |
|
|
|
FM (3) |
164.59 |
195.07 |
30.48 |
0.19 |
0.18 |
|
GBR-111(4) |
N4293968/ |
-55/225 |
134.11 |
204.22 |
70.10 |
0.71 |
0.30 |
|
|
|
incl |
137.16 |
152.40 |
15.24 |
0.99 |
0.40 |
|
(1) |
True thickness to be determined. |
|
(2) |
All samples were submitted for preparation by ALS Global at its facilities in |
|
(3) |
FM means footwall mineralization. |
|
(4) |
Drill hole ended in mineralization. |
Qualified Person
About
Neither the
Forward Looking Information
This press release contains "forward-looking information" within the meaning of applicable securities laws that is intended to be covered by the safe harbours created by those laws. "Forward-looking information" includes statements that use forward-looking terminology such as "may", "will", "expect", "anticipate", "believe", "continue", "potential" or the negative thereof or other variations thereof or comparable terminology. Such forward-looking information includes, without limitation, information with respect to the Company's expectations, strategies and plans for the
Forward-looking information is not a guarantee of future performance and is based upon a number of estimates and assumptions of management at the date the statements are made as well as the other assumptions disclosed in this news release. Furthermore, such forward-looking information involves a variety of known and unknown risks, uncertainties and other factors which may cause the actual plans, intentions, activities, results, performance or achievements of the Company to be materially different from any future plans, intentions, activities, results, performance or achievements expressed or implied by such forward-looking information and risks associated with mineral exploration, including the risk that actual results and timing of exploration and development will be different from those expected by management. See "Risk Factors" in the Company's annual information form for the year ended
The Company cautions that there can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, investors should not place undue reliance on forward-looking information.
Except as required by law, the Company does not assume any obligation to release publicly any revisions to forward-looking information contained in this press release to reflect events or circumstances after the date hereof.
SOURCE