1911 Gold Reports High-Grade Drill Results from Ogama-Rockland Intersecting 10.41 g/t Gold over 3.40 m, including 32.40 g/t Gold over 1.00 m
Ogama-Rockland is one of several historical gold producers within trucking distance of the True North mine and mill complex (the "
This program consisted of eight (8) surface diamond drill holes for 2,410 metres ("m") designed to confirm the updated geological interpretation and test the extensions of the mineralized veins outside of the 2013 MRE. In addition, the Company sampled the drill core from 15 historical drill holes for 429 m (totaling 439 samples) previously not sampled, in preparation for an updated mineral resource estimate expected towards the end of the second quarter of 2026 ("Q2-2026").
Drilling Highlights:
- The drill program was designed to improve confidence in the new geological model, assess vein continuity along strike, and test the extensions of the high-grade veins down-plunge and along strike
-
Drill results from the surface resource expansion and confirmation drilling program recently completed at Ogama-Rockland returned the following highlighted results:
- OR-25-001: Intersected 10.41 grams per tonne gold ("g/t", "Au") over 3.40 m (at 343.80 m downhole depth), including 32.40 g/t Au over 1.00 m
- OR-26-004: Intersected 46.10 g/t Au over 0.60 m (at 74.30 m downhole depth)
- OR-25-001: Intersected 7.84 g/t Au over 0.70 m (at 38.20 m downhole depth)
- OR-26-004: Intersected 5.57 g/t Au over 0.80 m (at 248.00 m downhole depth)
- OR-26-006: Intersected 3.51 g/t Au over 1.00 m (at 158.30 m downhole depth)
-
Assay results from sampling of historical drill core returned the following significant results:
- OG-11-008: Intersected 18.10 g/t Au over 0.70 m (at 272.30 m downhole depth)
- OG-11-008: Intersected 3.21 g/t Au over 1.21 m (at 277.26 m downhole depth)
-
1911 Gold is in the process of updating the mineral resource estimate for Ogama-Rockland, expected towards the end of Q2-2026 - Metallurgical test work is being conducted on a composite drill core sample to confirm the suitability of the True North processing facility for the recovery of gold from Ogama-Rockland
- Upon completion of the updated mineral resource estimate, Ogama-Rockland will be considered for inclusion in an updated and expanded PEA
Ogama-Rockland will be included in the updated and expanded PEA, following completion of a global resource update expected in the fourth quarter of this year. The updated and expanded PEA will aim to highlight future expansion opportunities as we continue to unlock the potential within the True North mine and across our significant and prospective land position."
Table 1: Select Significant Drill Results – Ogama-Rockland Resource Expansion and Confirmation Drill Program
|
Drill Hole (number) |
From (m) |
To (m) |
Interval (m) |
Gold Grade (g/t Au) |
Vein |
|
OR-25-001 |
3.50 |
4.20 |
0.70 |
4.46 |
V10 |
|
OR-25-001 |
38.20 |
38.90 |
0.70 |
7.84 |
V13 |
|
OR-25-001 |
39.50 |
40.20 |
0.70 |
0.56 |
V13 |
|
OR-25-001 |
59.90 |
60.90 |
1.00 |
0.64 |
V15 |
|
OR-25-001 |
73.30 |
74.00 |
0.70 |
0.56 |
n/a |
|
OR-25-001 |
235.70 |
239.00 |
3.30 |
0.71 |
V02 |
|
Including |
235.70 |
236.40 |
0.70 |
1.33 |
V02 |
|
OR-25-001 |
343.80 |
347.20 |
3.40 |
10.41 |
V06 |
|
Including |
343.80 |
344.80 |
1.00 |
32.40 |
V06 |
|
OR-25-001 |
344.80 |
347.20 |
2.40 |
1.25 |
V06 |
|
OR-25-001 |
405.60 |
406.70 |
1.10 |
1.66 |
V40 |
|
OR-25-002 |
No Significant Results |
||||
|
OR-26-004 |
69.90 |
70.80 |
0.90 |
1.58 |
V02 |
|
OR-26-004 |
74.30 |
74.90 |
0.60 |
46.10 |
V02 |
|
OR-26-004 |
87.40 |
88.10 |
0.70 |
1.27 |
n/a |
|
OR-26-004 |
179.20 |
180.20 |
1.00 |
2.55 |
V01 |
|
OR-26-004 |
187.00 |
187.60 |
0.60 |
0.56 |
V04 |
|
OR-26-004 |
241.50 |
242.40 |
0.90 |
2.93 |
V06 |
|
OR-26-004 |
245.50 |
246.80 |
1.30 |
2.22 |
V40 |
|
OR-26-004 |
248.00 |
248.80 |
0.80 |
5.57 |
V40 |
|
OR-26-004 |
256.00 |
256.60 |
0.60 |
0.58 |
n/a |
|
OR-26-005 |
108.20 |
109.00 |
0.80 |
2.98 |
V02 |
|
OR-26-005 |
122.40 |
123.20 |
0.80 |
0.59 |
n/a |
|
OR-26-005 |
144.20 |
145.20 |
1.00 |
0.53 |
n/a |
|
OR-26-005 |
208.20 |
209.40 |
1.20 |
3.39 |
V01 |
|
OR-26-005 |
251.40 |
252.90 |
1.50 |
2.10 |
V04 |
|
OR-26-005 |
292.00 |
293.40 |
1.40 |
1.07 |
V40 |
|
Including |
292.80 |
293.40 |
0.60 |
1.73 |
V40 |
|
OR-26-006 |
141.40 |
141.90 |
0.50 |
0.75 |
n/a |
|
OR-26-006 |
158.30 |
159.30 |
1.00 |
3.51 |
V02 |
|
OR-26-006 |
163.70 |
164.40 |
0.70 |
0.61 |
V02 |
|
OR-26-006 |
221.60 |
222.10 |
0.50 |
1.73 |
n/a |
|
OR-26-006 |
293.70 |
295.00 |
1.30 |
1.10 |
V04 |
|
OR-26-007 |
298.30 |
299.40 |
1.10 |
1.02 |
V04 |
|
OR-26-007 |
338.00 |
341.00 |
3.00 |
1.09 |
V06 |
|
Including |
340.00 |
341.00 |
1.00 |
1.58 |
V06 |
|
Notes: |
|
1) Intercepts above a cut-off grade of 0.5 g/t Au and no top capping applied |
|
2) Intercepts constrained within modelled mineralized veins with a maximum of 2.50 m internal dilution |
|
3) Intervals represent drill core length and are considered to represent 70% to 90% of true widths |
|
4) Drill hole Information included in Table 3 |
|
|
Table 2: Select Significant Drill Results – Historical Core (previously unsampled)
|
Drill Hole (number) |
From (m) |
To (m) |
Interval (m) |
Gold Grade (g/t Au) |
Vein |
|
OG-10-003 |
307.90 |
308.40 |
0.50 |
1.73 |
n/a |
|
OG-11-008 |
272.30 |
273.00 |
0.70 |
18.10 |
V23 |
|
OG-11-008 |
277.26 |
278.47 |
1.21 |
3.21 |
V23 |
|
OG-11-010 |
148.30 |
149.50 |
1.20 |
0.70 |
n/a |
|
OG-11-010 |
158.70 |
159.30 |
0.60 |
1.90 |
V15 |
|
OG-11-010 |
161.60 |
162.60 |
1.00 |
2.85 |
V15 |
|
OG-11-010 |
162.60 |
163.30 |
0.70 |
1.70 |
V15 |
|
OG-18-001 |
7.60 |
8.20 |
0.60 |
2.49 |
V01 |
|
OG-18-002 |
265.90 |
266.40 |
0.50 |
1.36 |
V55 |
|
OG-18-005 |
10.40 |
12.30 |
1.90 |
1.36 |
n/a |
|
OG-18-005 |
184.30 |
185.00 |
0.70 |
1.20 |
V20 |
|
Notes: |
|
1) Intercepts above a cut-off grade of 0.5 g/t Au and no top capping applied |
|
2) Maximum of 2.50 m internal dilution |
|
3) Intervals represent drill core length and are considered to represent 60% to 90% of true widths |
Ogama-
The Company, under its previous name Havilah Mining, drilled five (5) surface diamond resource-confirmation holes in 2018, totaling 1,881 m (see Figure 2). The results from the 2018 drill program will also be used to support the pending mineral resource update (see press release dated
- OG-18-002: Intersected 9.82 g/t Au over 3.90 m (at 347.12m downhole depth), including 100.54 g/t Au over 0.34 m
- OG-18-004: Intersected 2.83 g/t Au over 12.01 m (at 476.50 m downhole depth), including 6.43 g/t Au over 4.75 m, including 35.28 g/t Au over 0.34 m
- OG-18-002: Intersected 16.40 g/t Au over 1.71 m (at 64.89 m downhole depth), including 90.79 g/t Au over 0.30 m
- OG-18-001: Intersected 18.71 g/t Au over 0.91 m (at 90.12 m downhole depth), including 55.23 g/t Au over 0.30 m
Discussion of Results – Ogama- Rockland Resource Expansion and Confirmation Drilling
Ogama-Rockland is the most advanced regional target situated in the southeast portion of the
The Ogama-Rockland gold deposit is comprised of the historic Ogama and
The drill program was designed to confirm the occurrence and extensions of modelled veins to the northwest over a distance of 200 m beyond previous drilling and to test the extensions of veining to the southeast in one drill hole in an 85 m step-out. The updated interpretation of the modelled veins was confirmed in all eight (8) drill holes intersecting the quartz veins as predicted. Seven (7) of the eight (8) drill holes intersected significant gold mineralization associated with the modelled veins.
Drill hole OR-25-001 was collared 40 m to the southeast of historical drill hole OG-12-025 (18.82 g/t Au over 1.52 m at a downhole depth of 683.63 m), intersecting all of the veins targeted, and confirming the down-dip extensions of the V06 vein by over 50 m, intersecting 10.41 g/t Au over 3.40 m (at 343.80 m down hole depth), including 32.40 g/t Au over 1.00 m and extending the V40 vein at depth by over 75 m, intersecting 1.66 g/t Au over 1.10 m (at 405.60 m downhole depth).
Drill hole OR-25-002, was drilled as a 60 m step-out to the northwest of drill hole OR-25-001 intersecting the veins as predicted but with no significant results. Drill hole OR-25-003, a 45 m step out to the northwest of hole OR-25-002, intersecting the veins as modelled and returning 0.33 g/t Au over 3.20 m at 251.0 m downhole depth.
Drill hole OR-26-004, an 85 m step out to the northwest of hole OR-25-003, confirming the V01, and V02 veins intersecting 2.55 g/t Au over 1.00 m at 179.20 m downhole depth, and 46.10 g/t Au over 0.60 m (at 74.30 m downhole depth), and extended the depth extensions of the V40 vein by over 50 m, intersecting 5.57 g/t Au over 0.80 m (at a 248.00 m downhole depth).
Drill hole OR-26-005 was drilled as a 50 m step out to the northwest of hole OR-26-004, confirming vein V01, intersecting 3.39 g/t Au (at a downhole depth of 208.20 m) and vein V06 intersecting 3.51 g/t Au over 1.00 m (at a downhole depth of 158.30 m).
Drill hole OR-26-006 was drilled to undercut the vein system by 50 m below drill holes OR-26-004 and OR-26-005, intersecting vein V02 returning 3.51 g/t Au over 1.00 m (at 158.30 m downhole depth).
Drill hole OR-26-007 was drilled to undercut the vein system by 80 m below drill hole OR-26-004, confirming the depth extensions of the V04 and V06 veins intersecting up to 1.09 g/t Au over 3.00 m at 338.00 m downhole depth.
Next Steps
All drilling data, including the previously unsampled drill core data from historical drilling and the 2018 drilling will be used in preparation of an updated mineral resource estimate for Ogama-Rockland, expected towards the end of Q2-2026. Once finalized, the new resource at Ogama-Rockland will be reviewed for upside and expansion potential with additional drilling and development work planned as warranted.
The Company is in the process of planning new drill programs on two target areas located within the southeast extensions of the Rice Lake greenstone belt, an area ranging from 30 km to 50 km from True North. Drilling is planned for the second half of the year.
A composite sample was collected from the new Ogama-Rockland core and sent to
Following the completion of the current exploration drill program at True North, the Company will prepare an updated mineral resource estimate for True North which will include the resource expansion drilling and drilling from the new near-mine exploration targets, the San Antonio Mine West, San Antonio Mine Southeast, and the Shore targets. The updated mineral resources at Ogama-Rockland and True North will form the basis of an updated and expanded PEA expected to commence in the fourth quarter of this year.
This initiative positions the Company for future growth by leveraging existing infrastructure at the
Table 3: Ogama-Rockland Drill Hole Details (*
|
Drill Hole |
Northing* |
Easting* |
Elevation |
Azimuth |
Inclination |
Depth |
|
OR-25-001 |
5639937 |
332285 |
318 |
225 |
-60 |
431 |
|
OR-25-002 |
5639895 |
332107 |
317 |
225 |
-47 |
182 |
|
OR-25-003 |
5639979 |
332134 |
319 |
225 |
-55 |
281 |
|
OR-26-004 |
5640037 |
332071 |
318 |
225 |
-50 |
275 |
|
OR-26-005 |
5640104 |
332063 |
317 |
225 |
-50 |
326 |
|
OR-26-006 |
5640124 |
332093 |
317 |
228 |
-54 |
368 |
|
OR-26-007 |
5640123 |
332093 |
317 |
211 |
-52 |
380 |
|
OR-26-008 |
5639338 |
332666 |
321 |
225 |
-45 |
167 |
Qualified Person Statement
The scientific and technical information in this news release has been reviewed and approved by Mr.
Quality Assurance/
Core samples are collected by sawing the drill core in half along the axis, with one-half sampled, placed in plastic sample bags, labelled, sealed, and the other half retained for future reference. Batches are shipped to
About
ON BEHALF OF THE BOARD OF DIRECTORS
President and CEO
CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION
This news release may contain forward-looking statements. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or describes a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved.
All forward-looking statements reflect the Company's beliefs and assumptions based on information available at the time the statements were made. Actual results or events may differ from those predicted in these forward-looking statements. All of the Company's forward-looking statements are qualified by the assumptions that are stated or inherent in such forward-looking statements, including the assumptions listed below. Although the Company believes that these assumptions are reasonable, this list is not exhaustive of factors that may affect any of the forward-looking statements.
Forward-looking statements involve known and unknown risks, future events, conditions, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, prediction, projection, forecast, performance or achievements expressed or implied by the forward-looking statements. All statements that address expectations or projections about the future, including, but not limited to, the Company's current business plans, including the ongoing underground and surface drill programs, and the timing and results thereof, including success of expanding mineral resources and the timing around proposed mineral resource and preliminary economic study updates; development programs and the planned test mining and bulk sample program, leading towards a potential mine restart in 2027 (and the actual results and timing of these planned events); and generally, the plans, operations and prospects of the Company, are forward-looking statements. Although
In addition, readers are directed to review the detailed risk discussion in the Company's Annual Management's Discussion & Analysis for the year ended
All forward-looking statements contained in this news release are given as of the date hereof. The Company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except in accordance with applicable securities laws.
Neither
View original content to download multimedia:https://www.prnewswire.com/news-releases/1911-gold-reports-high-grade-drill-results-from-ogama-rockland-intersecting-10-41-gt-gold-over-3-40-m-including-32-40-gt-gold-over-1-00-m-302781362.html
SOURCE