P2 Gold Gabbs Project Update: Feasibility Study on Track
Infill and Expansion Drill Program
The reverse circulation ("RC") infill drilling of the
Water Well Drill Program
A water well drill rig is on site and has completed a test well and monitoring well at the proposed location for Gabbs' mine water supply in the vicinity of a historically permitted water well. The water well drill rig will now complete a test well and two monitoring wells on the periphery of each of the proposed open pits for the Sullivan and
Once all water well and monitoring well drilling has been completed, pump tests will be conducted on each of the three test wells to determine water flow rates and capacity. All of the data collected from the test wells and monitoring wells will be incorporated into a groundwater model in support of the Company's mining plan of operations application.
Water Rights Update
On
Metallurgy
Feasibility study-level column and flotation test work is underway for the Sullivan,
Permitting
Consultants have now been selected to complete all
Qualified Person
About P2 Gold Inc.
P2 Gold is a mineral exploration and development company focused on advancing its gold-copper Gabbs Project on the Walker Lane Trend in Nevada, where work to support a feasibility study is underway. A positive preliminary economic assessment (see footnote below) has outlined a long-life, mid-size mine at Gabbs with annual average production of 109,000 ounces gold and 33 million pounds copper, processing 9 million tonnes per year over a 14.2-year mine life. The feasibility study is advancing using a nominal production rate of 12 million tonnes per year targeting average annual production of 150,000 ounces gold and 45 to 50 million pounds of copper per year. The Gabbs Project has excellent infrastructure with access via paved Hwy 361, and power and water on site. All zones on the property remain open and an infill and expansion drill program is underway. On completion of drilling, an updated Mineral Resource estimate will be prepared for Gabbs, which is expected to be completed in the third quarter.
*Please see NI 43-101 Technical Report, "Preliminary Economic Assessment Gabbs Heap Leach and Mill Project" Nye County, Nevada, USA; Effect date of October 7, 2025, Report date November 20, 2025 available on the Company's web site www.p2gold.com and SEDAR+.
Neither the TSX Venture Exchange (the "Exchange") nor its Regulation Services Provider (as that term is defined in the policies of the Exchange) accepts responsibility for the adequacy or accuracy of this release.
Forward Looking Information
This press release contains "forward-looking information" within the meaning of applicable securities laws that is intended to be covered by the safe harbours created by those laws. "Forward-looking information" includes statements that use forward-looking terminology such as "may", "will", "expect", "anticipate", "believe", "continue", "potential" or the negative thereof or other variations thereof or comparable terminology. Such forward-looking information includes, without limitation, information with respect to the Company's expectations, strategies and plans for the Gabbs Project including the Company's planned expenditures and exploration and development activities.
Forward-looking information is not a guarantee of future performance and is based upon a number of estimates and assumptions of management at the date the statements are made as well as the other assumptions disclosed in this news release. Furthermore, such forward-looking information involves a variety of known and unknown risks, uncertainties and other factors which may cause the actual plans, intentions, activities, results, performance or achievements of the Company to be materially different from any future plans, intentions, activities, results, performance or achievements expressed or implied by such forward-looking information and risks associated with mineral exploration, including the risk that actual results and timing of exploration and development will be different from those expected by management. See "Risk Factors" in the Company's annual information form for the year ended December 31, 2025, dated March 19, 2026 filed on SEDAR+ at www.sedarplus.com for a discussion of these risks.
The Company cautions that there can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, investors should not place undue reliance on forward-looking information.
Except as required by law, the Company does not assume any obligation to release publicly any revisions to forward-looking information contained in this press release to reflect events or circumstances after the date hereof.
SOURCE P2 Gold Inc.