Key statistics
As of last trade Calibre Mining Corp (WCLA:BER) traded at 1.60, -16.89% below its 52-week high of 1.93, set on Oct 14, 2024.
52-week range
Short selling activityProvided by S&P Global Market Intelligence
Open | 1.58 |
---|---|
High | 1.61 |
Low | 1.58 |
Bid | 1.53 |
Offer | 1.70 |
Previous close | 1.60 |
Average volume | 9.45k |
---|---|
Shares outstanding | 837.22m |
Free float | 787.43m |
P/E (TTM) | 35.09 |
Market cap | 1.97bn CAD |
EPS (TTM) | 0.067 CAD |
Data delayed at least 15 minutes, as of Nov 22 2024 18:31 GMT.
More ▼
- Calibre Announces Significant High-Grade Mineralization at Limon Which Is Expected to Have a Positive Impact on Its Mineral Resources
- Calibre Reports Q3 and Year-To-Date 2024 Financial Results as the Multi-Million Ounce Valentine Gold Mine Progresses to Construction Completion in Canada
- Calibre Announces Q3 & Year to Date 2024 Gold Production; Revises 2024 Guidance With Q4 Expected to Be the Strongest Production of the Year; Valentine Remains Fully Funded and On Track for Q2, 2025 Gold Production
- Calibre Strengthens its Executive Leadership Team with the Appointment of Chief Operating Officer and Vice President of Technical Services, Nicaragua
- Calibre Makes a New Discovery Along the VTEM Gold Corridor at the Limon Mine; Drilling at the Past Producing Talavera Mine Hits Additional High-Grades; Drilling Intercepts Include 13.26 g/t Gold Over 4.9 Metres and 4.92 g/t Gold Over 10.3 Metres
- Calibre’s Marathon Pit Ore Control Drilling at the Valentine Gold Mine Yields 44% Additional Gold on 47% Higher Grades Than Modelled in the 2022 Mineral Reserve
- Calibre Continues to Discover Near Surface, Above Reserve Grade Gold Mineralization at the Pan Mine in Nevada; Drilling Intersects Include 0.45 g/t Gold Over 117.4 Metres and 0.56 g/t Gold Over 59.4 Metres
- Calibre Continues to Intercept High-Grade Gold Mineralization at Its Eastern Borosi Mine Complex; Drilling Intersects Include 13.24 g/t Gold Over 5.8 Metres and 11.62 g/t Gold Over 3.8 Metres
- Calibre Reports Q2, 2024 and Year-To-Date Financial Results and Remains on Track to Deliver into Full Year Production Guidance While the Multi-Million Ounce Valentine Gold Mine Progresses to Construction Completion in Canada
- Calibre Delivers First Ore From the Volcan Open Pit Located 5 Km From the Libertad Mill, Leading to a Stronger H2, 2024
More ▼