Company Announcements

Q3 2022 Results

Source: RNS
RNS Number : 6965H
Serinus Energy PLC
28 November 2022
 

 

28 November 2022

 

Press Release

Interim Results for the nine months ended 30 September 2022

Jersey, Channel Islands, 28 November 2022 - Serinus Energy plc ("Serinus" or the "Company") (AIM:SENX, WSE:SEN), is pleased to announce its interim results for the nine months ended 30 September 2022.

Financial

Revenue for the nine months ended 30 September 2022 was $41.8 million (30 September 2021 - $25.7 million)

During the period Moftinu Gas Plant surpassed produced revenues of $87.0 million since first gas in 2019

Net income for the nine months ended 30 September 2022 was $3.4 million (30 September 2021 - $0.8 million)

Funds from operations for the nine months ended 30 September 2022 were $11.1 million (30 September 2021 - $7.8 million)

EBITDA for the nine months ended 30 September 2022 was $11.4 million (30 September 2021 - $8.9 million)

Gross profit for the nine months ended 30 September 2022 was $11.8 million (30 September 2021 - $4.4 million)

The Company realised a net price of $162.18/boe for the nine months ended 30 September 2022 comprising:

Realised oil price - $101.04/bbl

Realised natural gas price - $36.66/Mcf

The Group's operating netback remained strong for the nine months ended 30 September 2022 and was $120.13/boe (30 September 2021 - $34.13/boe), comprising:

Romania operating netback - $195.73/boe (30 September 2021 - $37.79/boe)

Tunisia operating netback - $59.11/boe (30 September 2021 - $26.05/boe)

Capital expenditures of $8.6 million for the nine months ended 30 September 2022 (30 September 2021 - $9.3 million), comprising:

Romania - $6.9 million

Tunisia - $1.7 million

Working capital surplus increased to $0.8 million (31 December 2021 - $0.6 million)

Cash balance as at 30 September 2022 was $8.8 million (31 December 2021 - $8.4 million)

Operational

·      The Canar-1 well was drilled to a total depth of 1,570 metres, targeting three prospective hydrocarbon zones. Well logging and gas show readings determined that these zones had indications of gas, but they do not contain sufficient gas resources to justify proceeding with the testing and completion program for the well. The Canar-1 well has been completed as a water disposal well and test injection is ongoing

·      The Moftinu Nord-1 well was drilled to a total depth of 1,000 metres, targeting four prospective hydrocarbon zones. Well logging and gas show readings determined that these zones had indications of residual gas, but they do not contain sufficient estimated gas resources to justify proceeding with the testing and completion program for the well. The well is now suspended

·      Drilling operations on both the wells (Canar-1 and Moftinu Nord-1) were performed within budget and without incident

·      The Company has initiated a geological and geophysical review of the Satu Mare concession to high rank the management-estimated 181 million barrels of oil equivalent prospects

·      In Tunisia, production has remained stable in the first three quarters of 2022.  All material and consumables for the artificial lift programme at the Sabria W-1 well have been received in-field and the Company is awaiting mobilisation of the rig. Having previously defaulted on the rig contract, La Compagnie Tunisienne de Forage ("CTF"), the Tunisia state-owned drilling company, has confirmed the availability of its CTF 004 rig to perform the workover and installation of artificial lift for the W-1 well in Sabria. The rig is currently being demobilised from another operator and is expected to be operational at the well site in December 2022. Workover and installation operations are expected to take 60 days to complete

·      Workover at the CS-9 well at Chouech Es Saida was completed in August 2022

·      Immediately following the completion of the W-1 workover and artificial lift installation, the CTF 004 rig will move to the Sabria N-2 well to perform a workover to recomplete the well

·      The Company anticipates, subject to partner approval, proceeding with the workover and installation of artificial lift on the WIN-12bis well in Sabria in 2023

·      Production for the period averaged 938 boe/d, comprising:

Romania - 421 boe/d

Tunisia - 517 boe/d

·      In August 2022, the Company performed a lifting of 50,344 bbls of Tunisian crude oil at a price of $99.51/bbl

 

About Serinus

Serinus is an international upstream oil and gas exploration and production company that owns and operates projects in Tunisia and Romania.

For further information, please refer to the Serinus website (www.serinusenergy.com) or contact the following:

Serinus Energy plc

Jeffrey Auld, Chief Executive Officer

Andrew Fairclough, Chief Financial Officer

Calvin Brackman, Vice President, External Relations & Strategy

+44 204 541 7859



 

Shore Capital (Nominated Adviser & Joint Broker)

Toby Gibbs

John More

 

 

+44 207 408 4090

Arden Partners plc (Joint Broker)

Ruari McGirr

Alexandra Campbell-Harris

+44 207 614 5900



Camarco (Financial PR - London)

Owen Roberts

Phoebe Pugh

+44 203 781 8334



TBT i Wspólnicy (Financial PR - Warsaw)

Katarzyna Terej

+48 602 214 353

 

Forward Looking Statement Disclaimer

This release may contain forward-looking statements made as of the date of this announcement with respect to future activities that either are not or may not be historical facts. Although the Company believes that its expectations reflected in the forward-looking statements are reasonable as of the date hereof, any potential results suggested by such statements involve risk and uncertainties and no assurance can be given that actual results will be consistent with these forward-looking statements.  Various factors that could impair or prevent the Company from completing the expected activities on its projects include that the Company's projects experience technical and mechanical problems, there are changes in product prices, failure to obtain regulatory approvals, the state of the national or international monetary, oil and gas, financial , political and economic markets in the jurisdictions where the Company operates and other risks not anticipated by the Company or disclosed in the Company's published material. Since forward-looking statements address future events and conditions, by their very nature, they involve inherent risks and uncertainties, and actual results may vary materially from those expressed in the forward-looking statement. The Company undertakes no obligation to revise or update any forward-looking statements in this announcement to reflect events or circumstances after the date of this announcement, unless required by law.

 

Translation: This news release has been translated into Polish from the English original.



 

 

 

 

 

 

 

 

 

 

 

 

 

 

Serinus Energy plc

 

Third Quarter Report and Accounts 2022

(US dollars)


Third quarter 2022 Highlights

 

Financial

·       Revenue for the nine months ended 30 September 2022 was $41.8 million (30 September 2021 - $25.7 million)

·       During the period Moftinu Gas Plant surpassed produced revenues of $87.0 million since first gas in 2019

·       Net income for the nine months ended 30 September 2022 was $3.4 million (30 September 2021 - $0.8 million)

·       Funds from operations for the nine months ended 30 September 2022 were $11.1 million (30 September 2021 - $7.8 million)

·       EBITDA for the nine months ended 30 September 2022 was $11.4 million (30 September 2021 - $8.9 million)

·       Gross profit for the nine months ended 30 September 2022 was $11.8 million (30 September 2021 - $4.4 million)

·       The Company realised a net price of $162.18/boe for the nine months ended 30 September 2022 comprising:

o   Realised oil price - $101.04/bbl

o   Realised natural gas price - $36.66/Mcf

·       The Group's operating netback remained strong for the nine months ended 30 September 2022 and was $120.13/boe (30 September 2021 - $34.13/boe), comprising:

o   Romania operating netback - $195.73/boe (30 September 2021 - $37.79/boe)

o   Tunisia operating netback - $59.11/boe (30 September 2021 - $26.05/boe)

·       Capital expenditures of $8.6 million for the nine months ended 30 September 2022 (30 September 2021 - $9.3 million), comprising:

o   Romania - $6.9 million

o   Tunisia - $1.7 million

·       Working capital surplus increased to $0.8 million (31 December 2021 - $0.6 million)

·       Cash balance as at 30 September 2022 was $8.8 million (31 December 2021 - $8.4 million)

 

Operational

·        The Canar-1 well was drilled to a total depth of 1,570 metres, targeting three prospective hydrocarbon zones. Well logging and gas show readings determined that these zones had indications of gas, but they do not contain sufficient gas resources to justify proceeding with the testing and completion program for the well. The Canar-1 well has been completed as a water disposal well and test injection is ongoing

·        The Moftinu Nord-1 well was drilled to a total depth of 1,000 metres, targeting four prospective hydrocarbon zones. Well logging and gas show readings determined that these zones had indications of residual gas, but they do not contain sufficient estimated gas resources to justify proceeding with the testing and completion program for the well. The well is now suspended

·        Drilling operations on both the wells (Canar-1 and Moftinu Nord-1) were performed within budget and without incident

·        The Company has initiated a geological and geophysical review of the Satu Mare concession to high rank the management-estimated 181 million barrels of oil equivalent prospects

·        In Tunisia, production has remained stable in the first three quarters of 2022.  All material and consumables for the artificial lift programme at the Sabria W-1 well have been received in-field and the Company is awaiting mobilisation of the rig. Having previously defaulted on the rig contract, La Compagnie Tunisienne de Forage ("CTF"), the Tunisia state-owned drilling company, has confirmed the availability of its CTF 004 rig to perform the workover and installation of artificial lift for the W-1 well in Sabria. The rig is currently being demobilised from another operator and is expected to be operational at the well site in December 2022. Workover and installation operations are expected to take 60 days to complete

·        Workover at the CS-9 well at Chouech Es Saida was completed in August 2022

·        Immediately following the completion of the W-1 workover and artificial lift installation, the CTF 004 rig will move to the Sabria N-2 well to perform a workover to recomplete the well

·        The Company anticipates, subject to partner approval, proceeding with the workover and installation of artificial lift on the WIN-12bis well in Sabria in 2023

·        Production for the period averaged 938 boe/d, comprising:

o   Romania - 421 boe/d

o   Tunisia - 517 boe/d

·        In August 2022, the Company performed a lifting of 50,344 bbls of Tunisian crude oil at a price of $99.51/bbl

Operational UPDATE and Outlook

Serinus Energy plc and its subsidiaries ("Serinus", the "Company" or the "Group") is an oil and gas exploration, appraisal and development company.  The Group is the operator of all its assets and has operations in two business units: Romania and Tunisia.

ROMANIA

The Group's Romanian operating subsidiary holds the licence to the Satu Mare concession area, covering approximately 3,000 km2 in the north-west of Romania.  The Moftinu Gas Development project began production in 2019.  The development project includes the Moftinu gas plant, and currently operates four gas wells - Moftinu-1003, Moftinu-1004, Moftinu-1007 and Moftinu-1008 with a second compressor installed and commissioned on Moftinu-1007 in February 2022.  During the nine months ended 30 September 2022, the Company's Romanian operations produced a total of 687 MMcf of gas and 527 barrels of condensate, equating to an average daily production of 421 boe/day.  Production continues to reflect the natural decline profile of shallow gas fields.  The installation of compression has stabilised production from those wells.  The Company is reviewing the production performance versus the prognosed production as determined by the Company's technical staff and the Company's independent reserve engineers and is considering additional production wells on the Moftinu structure to maximise reservoir drainage. 

The Company has completed drilling of two exploration wells in the period in Romania.  The Canar-1 well was drilled to a total depth of 1,570 metres, targeting three prospective hydrocarbon zones. The Moftinu Nord-1 well was drilled to a total depth of 1,000 metres, targeting four prospective hydrocarbon zones.   Well logging and gas show readings for both wells determined that the prospective zones in each well had indications of residual gas but they did not contain sufficient gas resources to justify proceeding with the testing and completion programs for the wells. Each of the prospects exhibit several AVO anomalies of a type that strongly indicates the presence of gas. However, other formation characteristics may also contribute to such signals, including low gas saturations. Seal risk is a component of the ongoing bloc-wide review of exploration potential in the block.

The Canar-1 well underwent initial tests to assess its suitability for disposal of produced water from the Moftinu field and has subsequently been completed to enable longer term water injection which has the potential for substantial savings in operating cost.

Serinus has also initiated a block-wide geological and geophysical study to verify and enhance our understanding of the exploration portfolio beyond the Moftinu area.  Management has estimated the exploration potential of the block to be 181 million barrels of oil equivalent, on a mean unrisked recoverable resource.  These additional studies will look to high rank future exploration prospects.

Gas pricing in Romania remained at high levels through the first nine months of 2022, with an average realised price of $40.54/Mcf.  Gas prices on the Romanian Commodity Exchange continued to remain strong over the third quarter of 2022.

Tunisia

The Company currently operates two concession areas within Tunisia, Sabria and Chouech Es Saida, which have discovered oil and gas reserves and are currently producing.  The Ech Chouech licence, which can only be produced through the Chouech Es Saida facilities, expired in May 2022.  The Company has followed the regulatory process to seek an extension of this licence with the Tunisian authorities, but no progress has been forthcoming to date.  The largest asset is the Sabria field; a large, conventional oilfield which the Company's independent reservoir engineers have estimated to have approximately 445 million barrels of oil-originally-in-place.  Of this oil-in-place only 1.0% has been produced to date due to a low rate of development on the field. 

The Sabria W-1 wellsite has been prepared for the intervention which will install the first submersible pump for the Artificial Lift programme in the Sabria field.  All materials required for this intervention are in our in-country warehouse.  The Company signed a rig contract for the CTF 006 rig and was awaiting mobilization from another operator and the workover and pump installation at the Sabria W-1 well due to commence as soon as the rig was available.  CTF notified the Company that it was unable to deliver the CTF 006 rig as contractually agreed.  The Company worked with CTF, its partner, ETAP, and the Ministry of Energy to procure an alternative rig as per the terms of the previously agreed CTF rig contract.  CTF has now agreed to provide the CTF 004 rig to perform the well workovers. This is currently being demobilised from another operator and will begin workover operations in December 2022. The completion of the planned operations is expected to take 60 days.

Upon completion of the workover and pump installation at Sabria W-1, the rig will move to the Sabria N-2 well to perform a workover to recomplete the well.  This well was drilled in 1980 but was damaged during completion and, although in proximity to producing wells, was not able to flow oil to surface due to damage during completion.  The workover program will re-complete the well and remove any wellbore restrictions. 

All long-lead items for the Sabria field artificial lift programme have been delivered to the Sabria field. 

Production remained stable in the third quarter of 2022 at the Chouech Es Saida field as a result of the Company's programme of pump installation and maintenance.

 

Financial Review

Liquidity, Debt and Capital Resources

During the nine months ended 30 September 2022, the Company invested a total of $8.6 million (2021 - $9.3 million) on capital expenditures before working capital adjustments.  In Romania, the Group invested $6.9 million (2021 - $8.5 million) on the drilling campaign related to the exploration wells.  In Tunisia, the Company invested $1.6 million (2021 - $0.8 million) for workovers on wells.

The Company's funds from operations for the nine months ended 30 September 2022 were $11.1 million (2021 - $7.8 million).  Including changes in non-cash working capital, the cash flow generated from operating activities in 2022 was $8.7 million (2021 - $10.5 million).  The Company continues to be in a strong position to expand and continue growing production within our existing resource base.  The Company is debt-free and has adequate resources available to deploy capital into both operating segments to deliver growth and shareholder returns.

($000)

30 September     

31 December

Working Capital

2022

2021

Current assets

20,043

17,625

Current liabilities

(19,279)

(16,994)

Working Capital

764

631

 

Working capital at 30 September 2022 is relatively stable at $0.8 million (31 December 2021 - $0.6 million). 

Current assets as at 30 September 2022 were $20.0 million (31 December 2021 - $17.6 million), an increase of $2.4 million.  Current assets consist of:

·      Cash and cash equivalents of $8.8 million (31 December 2021 - $8.4 million)

·      Restricted cash of $1.1 million (31 December 2021 - $1.1 million)

·      Trade and other receivables of $9.6 million (31 December 2021 - $7.4 million)

·      Product inventory of $0.5 million (31 December 2021 - $0.6 million)

Current liabilities as at 30 September 2022 were $19.3 million (31 December 2021 - $17.0 million), an increase of $2.3 million. Current liabilities consist of:

·      Accounts payable of $11.2 million (31 December 2021 - $9.7 million)

·      Decommissioning provision of $6.6 million (31 December 2021 - $6.6 million)

Brunei - $1.6 million (31 December 2021 - $1.6 million)

Canada - $1.0 million (31 December 2021 - $1.0 million) which is offset by restricted cash in the amount of $1.1 million (31 December 2021 - $1.1 million) in current assets

Romania - $nil million (31 December 2021 - $0.3 million)

Tunisia - $4.0 million (31 December 2021 - $3.7 million)

·      Income taxes payable of $1.3 million (31 December 2021 - $0.5 million)

·      Current portion of lease obligations of $0.2 million (31 December 2021 - $0.2 million)

Non-current assets

Property, plant and equipment ("PP&E") decreased to $64.3 million (31 December 2021 - $71.7 million), as a result of depletion expense in the period of $4.7 million, a change in decommissioning estimates of $4.6 million and a foreign currency impact of $3.0 million. The decrease from depletion, decommissioning estimates and foreign currency was partially offset by capital expenditures in PP&E of $4.8 million.  Exploration and evaluation assets ("E&E") increased to $8.5 million (31 December 2021 - $5.0 million), primarily due to expenditures incurred on the 2D seismic acquisition programme and exploration drilling programme in Romania.  Right-of-use assets increased to $0.5 million (31 December 2021 - $0.3 million) due to expenditures incurred on corporate assets.



 

Financial Review - NINE months ended 30 SEPTEMBER 2022

Funds from Operations

The Group uses funds from operations as a key performance indicator to measure the ability of the Group to generate cash from operations to fund future exploration and development activities.  The following table is a reconciliation of funds from operations to cash flow from operating activities:


 Nine months ended 30 September

 

($000)

2022

2021

Cash flow from operations

8,713

10,464

Changes in non-cash working capital

2,342

(2,636)

Funds from operations

11,055

7,828

Funds from operations per share

0.10

0.01





 

Romania generated funds from operations of $8.4 million (2021 - $5.8 million) and Tunisia generated $7.1 million (2021 - $1.8 million).  Funds used at the Corporate level were $4.4 million (2021 - $2.3 million) resulting in net funds from operations of $11.1 million (2021 - $5.3 million).  Changes in non-cash working capital increased by $4.9 million to $2.3 million (2021 - $2.6 million).

Production

Nine months ended 30 September 2022 

Tunisia

Romania

Group

%

Crude oil (bbl/d)

451

-

451

48%

Natural gas (Mcf/d)

395

2,518

2,913

52%

Condensate (bbl/d)

-

2

2

0%

Total (boe/d)

517

422

938

100%






 

Nine months ended 30 September 2021 




 

Crude oil (bbl/d)

465

-

465

25%

Natural gas (Mcf/d)

618

7,392

8,010

74%

Condensate (bbl/d)

-

10

10

1%

Total (boe/d)

568

1,242

1,810

100%

 

During the nine months ended 30 September 2022 production volumes decreased by 872 boe/d (48%) to 938 boe/d against the comparative period (2021 - 1,810 boe/d).

Romania's production volumes decreased by 821 boe/d (66%) to 422 boe/d against the comparative period (2021 - 1,242 boe/d).  Production continues to reflect the natural decline profile of shallow gas fields.  In February 2022, a second compressor was installed and commissioned on Moftinu-1007.  The installation of compression has stabilised production from those wells with compression. 

Tunisia's production volumes decreased by 51 boe/d (9%) to 517 boe/d against the comparative period (2021 - 568 boe/d).  Production remains stable during the nine months of 2022 as a result of the Company's programme of pump installation and maintenance.  The CTF-004 rig is being demobilised from another operator and workover operations are due to start in December 2022. Ongoing workover programmes continue in the Chouech Es Saida field to enhance production. 

Oil and Gas Revenue

($000) 

 

 

 

 

Nine months ended 30 September 2022 

Tunisia

Romania

Group

%

 

Oil revenue

12,569

-

12,569

30%

 

Natural gas revenue

1,280

27,888

29,168

69%

 

Condensate revenue

-

57

57

1%

 

Total revenue

13,849

27,945

41,794

100%

 






 













 

Nine months ended 30 September 2021 

Tunisia

Romania

Group

%

 

Oil revenue

7,473

-

7,473

29%

 

Natural gas revenue

1,482

16,581

18,063

70%

 

Condensate revenue

-

162

162

1%

 

Total revenue

8,955

16,743

25,698

100%

 

 

Realised Price[1]

 

 

 

Nine months ended 30 September 2022 

Tunisia

Romania

Group

 

Oil ($/bbl)

101.04

-

101.04

 

Natural gas ($/Mcf)

11.88

40.54

36.66

 

Condensate ($/bbl)

-

81.33

81.33

 

Average realised price ($/boe)

97.29

242.25

162.18

 





 

Nine months ended 30 September 2021




 

Oil ($/bbl)

61.69

-

61.69

 

Natural gas ($/Mcf)

8.79

8.22

8.26

 

Condensate ($/bbl)

-

57.72

57.72

 

Average realised price ($/boe)

60.01

49.37

52.62

 












During the nine months ended 30 September 2022 revenue increased by $16.1 million (63%) to $41.8 million (2021 - $25.7 million) as the Group saw the average realised price increase by $109.56/boe (208%) to $162.18/boe (2021 - $52.62/boe).

The Group's average realised oil price increased by $39.35/bbl (64%) to $101.04/bbl (2021 - $$61.69/bbl), and average realised natural gas prices increased by $28.40/Mcf (344%) to $36.66/Mcf (2021 - $$8.26/Mcf). 

Under the terms of the Sabria Concession Agreement the Group is required to sell 20% of its annual crude oil production from the Sabria concession into the local market, which is sold at an approximate 10% discount to the price obtained on its other crude sales.  The remaining crude oil production was sold to the international market. 

Royalties


Nine months ended 30 September

($000)

2022

2021

Tunisia

1,714

1,198

Romania

943

1,282

Total

2,657

2,480

Total ($/boe)

10.31

5.08

Tunisia (% of revenue)

12.4%

13.4%

Romania (% of revenue)

3.5%

7.7%

Total (% of revenue)

6.4%

9.7%

 

During the nine months ended 30 September 2022 royalties increased by $0.2 million (7%) to $2.7 million (2021- $2.5 million) while the Group's average royalty rate decreased to 6.4% (2021 - 9.7%). 

In Romania, the royalty rate dropped to 3.5% in the nine months ended 2022 (2021 - 7.7%) as a result of a decrease in the level of production. In addition to the decrease in production, the Company saw an increase in the realised price, which exceeded the royalty reference price in 2022, compared to 2021 where the royalty reference price exceeded the realised price.  The Company incurred a 3.5% royalty for gas (2021 - 7.5%) and 3.5% royalty for condensate (2021 - 3.5%).  The royalty is calculated using a reference price that is set by the Romanian authorities and not the realised price to the Company.  Romanian royalty rates vary based on the level of production during the quarter.  Natural gas royalty rates range from 3.5% to 13.0% and condensate royalty rates range from 3.5% to 13.5%.

In Tunisia, royalties vary based on individual concession agreements.  Sabria royalty rates vary depending on a calculation of cumulative revenues, net of taxes, as compared to cumulative investment in the concession, known as the "R-factor".  As the R-factor increases, so does the royalty percentage to a maximum rate of 15%. 

 

During the nine months of 2022, the royalty rate remained unchanged in Sabria at 10% for oil and 8% for gas.  Chouech Es Saida and Ech Chouech royalty rates are flat at 15% for both oil and gas.

Production Expenses


Nine months ended 30 September

($000)

2022

2021

Tunisia

3,720

3,870

Romania

4,424

2,647

Canada

40

34

Group

8,184

6,551


 

 

Tunisia production expense ($/boe)

26.14

25.93

Romania production expense ($/boe)

38.35

7.80

Total production expense ($/boe)

31.74

13.41

 

During the nine months ended 30 September 2022 production expenses increased by $1.6 million (25%) to $8.2 million (2021 - $6.6 million). Per unit production expenses increased by $18.33/boe (137%) to $31.74 (2021 - $ 13.41/boe). 

Tunisia's production expenses decreased by $0.2 million (4%) to $3.7 million (2021 - $3.9 million), however per unit production expenses increased to $26.14/boe (2021 - $25.93/boe) due to lower production.  The decrease in production expenses is due to a lower number of workover programs initiated in the period and the inclusion of historic mining taxes of $0.3 million related to Sanrhar and Zinnia in the comparative period in 2021.

Romania's overall operating costs increased by $1.9 million (67%) to $4.5 million (2021 - $2.6 million), with per unit production expenses increasing by $30.55/boe (392%) to $38.35/boe (2021 - $7.80/boe) due to lower production.  The increase in production costs is primarily a result of higher water disposal costs and the impact of inflation in Romania.

Canada production expenses relate to the Sturgeon Lake assets, which are not producing and are incurring minimal operating costs to maintain the property.

Operating Netback

Serinus uses operating netback as a key performance indicator to assist management in understanding Serinus' profitability relative to current market conditions and as an analytical tool to benchmark changes in operational performance against prior periods.  Operating netback consists of petroleum and natural gas revenues less direct costs consisting of royalties and production expenses.  Netback is not a standard measure under IFRS and therefore may not be comparable to similar measures reported by other entities.

($/boe)

 

 

Nine months ended 30 September 2022

Tunisia

Romania

Group

Sales volume (boe/d)

521

422

944

Realised price

97.29

242.25

162.18

Royalties

(12.04)

(8.17)

(10.31)

Production expense

(26.14)

(38.35)

(31.74)

Operating netback

59.11

195.73

120.13





Nine months ended 30 September 2021 

Tunisia

Romania

Group

Sales volume (boe/d)

568

1,242

1,810

Realised price

60.01

49.37

52.62

Royalties

(8.03)

(3.78)

(5.08)

Production expense

(25.93)

(7.80)

(13.41)

Operating netback

26.05

37.79

34.13







 

During the nine months ended 30 September 2022 the Group's operating netback increased by $86.00/boe (252%) to $120.13/boe (2021 - $34.13/boe).  The increase is due to increased realised prices, partially offset by higher royalties and higher production expenses.  

The Company also generated a gross profit of $11.8 million (2021 - $4.4 million), largely due to a significant increase in the Company's netbacks as well as a decrease to depletion as described below.  

Earnings Before Interest, Taxes, Depreciation and Amortization ("ebitda")

Serinus uses EBITDA as a key performance indicator to assist management in understanding Serinus' cash profitability.  EBITDA is computed as net profit/loss and adding back interest, taxation, depletion and depreciation, and amortisation expense.  EBITDA is not a standard measure under IFRS and therefore may not be comparable to similar measures reported by other entities.  During the nine months ended 30 September 2022, the Group's EBITDA increased by $2.5 million to $11.4 million (2021 - $ 8.9 million).


Nine months ended 30 September

($000)

2022

2021

Net income

3,367

836

Interest expense

45

51

Depletion and amortization

4,924

8,066

Tax expense

3,079

(54)

EBITDA

11,415

8,899

 

Windfall Tax


Nine months ended 30 September

($000)

2022

2021

Windfall tax

14,233

4,190

Windfall tax ($/Mcf - Romania gas)

20.68

2.08

Windfall tax ($/boe - Romania gas)

124.05

12.46

 

During the nine months ended 30 September 2022 windfall taxes in Romania increased by $10.0 million (246%) to $14.2 million (2021 - $4.2 million).  This increase is directly related to higher realised gas prices in Romania which increased from $8.22/Mcf to $40.54/Mcf.

In Romania, the Group is subject to a windfall tax on its natural gas production which is applied to supplemental income once natural gas prices exceed 47.53 RON/Mwh.  This supplemental income is taxed at a rate of 60% between 47.53 RON/Mwh and 85.00 RON/Mwh and at a rate of 80% above 85.00 RON/Mwh.  Expenses deductible in the calculation of the windfall tax include royalties and capital expenditures limited to 30% of the supplemental income below the 85.00 RON/Mwh threshold.

 

Depletion and Depreciation


Nine months ended 30 September

($000)

2022

2021

Tunisia

2,067

2,801

Romania

2,763

5,153

Corporate

94

112

Total

4,924

8,066


 

 

Tunisia ($/boe)

14.52

18.77

Romania ($/boe)

23.95

15.19

Total ($/boe)

19.11

16.52

 

During the nine months ended 30 September 2022 depletion and depreciation expense decreased by $3.2 million (39%) to $4.9 million (2021 - $8.1 million), primarily due to lower production during the period.  Per boe, depletion and depreciation expense increased by $2.59/boe (16%) to $19.11/boe (2021 - $16.52/boe), primarily due to lower reserves in the current period.

General and Administrative ("G&A") Expense


Nine months ended 30 September

($000)

2022

2021

G&A expense

4,050

3,180

G&A expense ($/boe)

15.72

6.49

 

During the nine months ended 30 September 2022 G&A costs increased by $0.9 million (27%) to $4.1 million (2021 - $ 3.2 million), being an increase of $9.23/boe (140%) to $15.72/boe (2021 - $6.49/boe) due to higher compliance expenses and impact of foreign exchange rates in the current period.  

Share-Based Payment


Nine months ended 30 September

($000)

2022

2021

Share-based payment

59

119

Share-based payment ($/boe)

0.23

0.24

 

During the nine months ended 30 September 2022 share-based compensation decreased to $0.06 million (2021 - $0.1 million) due to lower stock options granted in the preceding 12 months.

Net Finance Expense


Nine months ended 30 September

($000)

2022

2021

Interest on leases

28

41

Accretion on decommissioning provision

753

255

Foreign exchange and other

532

16


1,313

312

 

During the nine months ended 30 September 2022 net finance expenses increased by $1.0 million (321%) to $1.3 million (2021 - $0.3 million).  This increase is mainly due to foreign exchange losses due to the strengthening of the US dollar, as well as higher accretion on decommissioning provision which increased due to the higher discount rates applied to the calculation during the period.

Taxation

During the nine months ended 30 September 2022 income tax expense was $3.4 million (2021 - $0.1 million).  The increase in the tax expense is directly related to higher taxable income in Tunisia during the period.

Share Data

As at the date of issuing this report, the following are the Directors stock options outstanding, LTIP awards, and shares owned up to the date of this report.


Share Options

LTIP Awards

Shares

As of the date of issuing this report, management is aware of the following shareholders holding more than 3% of the ordinary shares of the Group, as reported by the shareholders to the Group: Richard Sneller 11.59%, CRUX Asset Management 8.41%, Quercus TFI SA 7.26%, Canccord (Marlborough Fund Managers) 4.19%, and Spreadex LTD 3.02%.

The Directors are responsible for the maintenance and integrity of the corporate and financial information on the Group's website. Legislation in Jersey governing the preparation and dissemination of financial statements may differ from legislation in other jurisdictions.

 

Foreign Currency Translation

Foreign currency translation occurs from the revaluation from fluctuations in the foreign exchange rates in entities with a different functional currency than the reporting currency (USD).  The revaluation of the condensed consolidated interim statement of financial position to the period-end rates resulted in a loss of $3.4 million (2021 - loss of $1.8 million) through Other comprehensive loss.



 

Going Concern

The Group's business activities, together with the factors likely to affect its future development and performance are set out in the Operational Update and Outlook.  The financial position of the Group is described in these condensed consolidated interim financial statements.

The Directors have given careful consideration to the appropriateness of the going concern assumption, including cashflow forecasts through the going concern period and beyond, planned capital expenditure and the principal risks and uncertainties faced by the Group.  This assessment also considered various downside scenarios including oil and gas commodity prices and production rates.  Following this review, the Directors are satisfied that the Group has sufficient resources to operate and meet its commitments as they come due in the normal course of business for at least 12 months from the date of these condensed consolidated interim financial statements.  Accordingly, the Directors continue to adopt the going concern basis for the preparation of these condensed consolidated interim financial statements.

Declarations of the Board of Directors Concerning Accounting Policies

The Board of Directors of the Company confirms that, to the best of their knowledge, the condensed consolidated interim financial statements together with comparative figures have been prepared in accordance with applicable accounting standards and give a true and fair view of the state of affairs and the financial result of the Group for the period ended 30 September 2022.

The Financial Review in this report gives a true and fair view of the situation on the reporting date and of the developments during the period ended 30 September 2022 and include a description of the major risks and uncertainties.

 

 



 

Serinus Energy plc

Consolidated Interim Statement of Comprehensive Loss

(US$ 000s, except per share amounts)

 


 

Nine months ended 30 September


Note

2022

2021



 

 

Revenue


41,794

25,698



 


Cost of sales


 


Royalties


(2,657)

(2,480)

Windfall tax


(14,223)

(4,190)

Production expenses


(8,184)

(6,551)

Depletion and depreciation


(4,924)

(8,066)

Total cost of sales


(29,988)

(21,287)



 


Gross profit


11,806

4,411



 


Administrative expenses


(4,050)

(3,180)

Share-based payment expense


(59)

(119)

Total administrative expenses


(4,109)

(3,299)



 


Decommissioning provision recovery (expense)


62

(18)

Operating income


7,759

1,094



 


Finance expense


(1,313)

(312)

Net income before tax


6,446

782



 


Tax (expense) recovery


(3,079)

54

Income after taxation attributable to equity owners of the parent


3,367

836



 


Other comprehensive loss


 


Other comprehensive loss to be classified to profit and loss in subsequent periods:


 


Foreign currency translation adjustment


(3,441)

(1,828)

Total comprehensive loss for the period attributable to equity owners of the parent


(74)

(992)



 


Earnings per share:


 


Basic

4

0.03

0.00 

Diluted

4

0.03

0.00 

 

The accompanying notes on pages 15 to 16 form part of the condensed consolidated interim financial statements

 



Serinus Energy plc

Condensed Consolidated Interim Statement of Financial Position

(US$ 000s, except per share amounts)

As at

 

 30 September

 2022

 31 December

2021



 

 

Non-current assets


 

 

Property, plant and equipment


 64,322

71,747

Exploration and evaluation assets


 8,453

5,042

Right-of-use assets


 483

370

Total non-current assets


 73,258

77,159



 


Current assets


 


Restricted cash


 1,064

1,144

Trade and other receivables


 9,669

7,396

Product inventory


 525

656

Cash and cash equivalents


 8,785

8,429

Total current assets


 20,043

17,625

Total assets

 

 93,301

94,784



 


Equity


 


Share capital


 401,426

401,426

Share-based payment reserve


 25,546

25,487

Treasury shares


(323)

(121)

Accumulated deficit


(384,619)

(387,986)

Cumulative translation reserve


(4,815)

(1,374)

Total equity


 37,215

37,432



 


Liabilities


 


Non-current liabilities


 


Decommissioning provision


 23,866

28,232

Deferred tax liability


 11,416

10,516

Lease liabilities


 167

252

Other provisions


 1,358

1,358

Total non-current liabilities


 36,802

40,358



 


Current liabilities


 


Current portion of decommissioning provision


6,572

6,636

Current portion of lease liabilities


 167

193

Accounts payable and accrued liabilities


 12,540

10,165

Total current liabilities


 19,279

16,994

Total liabilities


 56,086

57,352

Total liabilities and equity


93,301

94,784

 

The accompanying notes on pages 15 to 16 form part of the condensed consolidated interim financial statements

 

 



 

Serinus Energy plc

Condensed Consolidated Interim Statement of Changes in Shareholder's Equity

(US$ 000s, except per share amounts)

 


Share capital

Share-based payment reserve

Treasury

Shares

Accumulated deficit

Accumulated other comprehensive loss

Total

Balance at 31 December 2020

401,426

25,274

-

(396,410)

1,089

31,379

Loss for the period

-

-

-

(660)

-

(660)

Other comprehensive loss for the period

-

-

-

-

(1,076)

(1,076)

Total comprehensive loss for the period

-

-

-

(397,070)

13

29,643

Transactions with equity owners







Share-based payment expense

-

104

-

-

-

104

Balance at 30 September 2021

401,426

25,378

-

(397,070)

13

29,747

 







Balance at 31 December 2021

401,426

25,487

(121)

(387,986)

(1,374)

37,432

Comprehensive income for the period

-

-

-

3,367

-

3,367

Other comprehensive loss for the period

-

-

-

-

(3,441)

(3,441)

Total comprehensive (income) loss for the period

-

-

-

3,367

(3,441)

(74)

Transactions with equity owners







Share-based payment expense

-

59

-

-

-

59

Shares purchased to be held in Treasury



(202)

-

-

(202)

Balance at 30 September 2022

401,426

25,546

(323)

(384,619)

(4,815)

37,215

 

The accompanying notes on pages 15 to 16 form part of the condensed consolidated interim financial statements



Serinus Energy plc

Condensed Consolidated Interim Statement of Cash Flows

(US$ 000s, except per share amounts)

 


 

Nine months ended 30 September

 


Note

2022

2021

 


 

 

 

 

Operating activities


 


 

Income for the period


3,367

836

 

Items not involving cash:


 


 

Depletion and depreciation


4,924

8,066

 

Share-based payment expense


59

119

 

Tax expense


3,079

(54)

 

Accretion expense on decommissioning provision


753

255

 

Change in other provisions


-

70

 

Foreign exchange loss (gain)


68

(23)

 

Other income


(3)

(5)

 

Decommissioning provision (recovery) expense


(62)

18

 

Income taxes paid


(1,130)

(1,132)

 

Funds from operations


 11,055

7,828

Changes in non-cash working capital

5

 (2,342)

2,636

Cashflows from operating activities


 8,713

10,464



 


 

Financing activities


 


 

Lease payments


(355)

(217)

 

Shares purchased to be held in treasury


(202)

-

 

Cashflows used in financing activities


(557)

(217)

 



 


 

Investing activities


 


 

Capital expenditures

5

(7,476)

(9,865)

 

Proceeds on disposition of property, plant and equipment


-

8

 

Cashflows used in investing activities


(7,476)

(9,857)

 



 


 

Impact of foreign currency translation on cash


(324)

(23)

 



 


 

Change in cash and cash equivalents


356

367

 



 


 

Cash and cash equivalents, beginning of period


8,429

6,002

 

Cash and cash equivalents, end of period


8,785

6,369

 

 

The accompanying notes on pages 15 to 16 form part of the condensed consolidated interim financial statements

 


1.   General information

Serinus Energy plc and its subsidiaries are principally engaged in the exploration and development of oil and gas properties in Tunisia and Romania.  Serinus is incorporated under the Companies (Jersey) Law 1991.  The Group's head office and registered office is located at 2nd Floor, The Le Gallais Building, 54 Bath Street, St. Helier, Jersey, JE1 1FW.

Serinus is a publicly listed company whose ordinary shares are traded under the symbol "SENX" on AIM and "SEN" on the WSE.

2.   Basis of presentation

The condensed consolidated interim financial statements have been prepared in accordance with International Financial Reporting Standards ("IFRS") and their interpretations issued by the International Accounting Standards Board ("IASB") as adopted by the United Kingdom applied in accordance with the provisions of the Companies (Jersey) Law 1991.

These condensed consolidated interim financial statements are expressed in U.S. dollars unless otherwise indicated.  All references to US$ are to U.S. dollars.  All financial information is rounded to the nearest thousands, except per share amounts and when otherwise indicated.

Information about significant areas of estimation uncertainty and critical judgements in applying accounting policies that have the most significant effect on the amounts recognised in the condensed consolidated interim financial statements are described in Note 5 to the consolidated financial statements for the year ended 31 December 2021.  There has been no change in these areas during the nine months ended 30 September 2022.

Going concern

The Group's business activities, together with the factors likely to affect its future development and performance are set out in the Operational Update and Outlook.  The financial position of the Group is described in these condensed consolidated interim financial statements and in the Report from the CFO.

The Directors have given careful consideration to the appropriateness of the going concern assumption, including cashflow forecasts through the going concern period and beyond, planned capital expenditure and the principal risks and uncertainties faced by the Group.  This assessment also considered various downside scenarios including oil and gas commodity prices and production rates.  Following this review, the Directors are satisfied that the Group has sufficient resources to operate and meet its commitments as they come due in the normal course of business for at least 12 months from the date of these condensed consolidated interim financial statements.  Accordingly, the Directors continue to adopt the going concern basis for the preparation of these condensed consolidated interim financial statements.

3.   Significant accounting policies

The condensed consolidated interim financial statements have been prepared following the same basis of measurement, accounting policies and methods of computation as described in the notes to the consolidated financial statements for the year ended 31 December 2021.  There has been no change to the accounting policies or the estimates and judgements which management are required to make in the period.  The business is not subject to seasonal variations.  Information in relation to the operating segments and material primary statement movements can be found within the management discussion at the front of this report.

 

4.   Earnings per share

 

Period ended 30 September 

($000's, except per share amounts)

2022

2021

Income for the period

 

3,367

836

Weighted average shares outstanding:



Basic

114,714,372

116,316,068

Diluted

114,714,372

117,445,549




Income per share - Basic and diluted

0.03

0.00


In determining diluted net loss per share, the Group assumes that the proceeds received from the exercise of "in-the-money" stock options are used to repurchase ordinary shares at the average market price.  In calculating the weighted-average number of diluted ordinary shares outstanding for the period ended 30 September 2022, the Group excluded 3.4 million stock options (2021 - 3.2 million) as they were non-dilutive.



 

5.   Supplemental cash flow disclosure

 

Period ended 30 September

 

2022

2021

Cash provided by (used in):



Trade and other receivables

(3,085)

2,466

Product inventory

(19)

-

Accounts payable and accrued liabilities

764

154

Restricted cash

(2)

16

Changes in non-cash working capital from operating activities

(2,342)

2,636





The following table reconciles capital expenditures to the cash flow statement:

 

Period ended 30 September

 

2022

2021

PP&E additions

4,402

4,604

E&E additions

4,221

4,706

Total capital additions

8,623

9,310

Changes in non-cash working capital from investing activities

(1,147)

555

Total capital expenditures

7,476

9,865

 

6.   Prior year comparatives

The prior year comparatives have been reclassified to align with the current year disclosure.  These reclassifications are immaterial.

 

7.   Subsequent event

On 5 October 2022, the Company announced that it had the Moftinu Nord-1 well was drilled to a total depth of 1,000 metres, targeting four prospective hydrocarbon zones. Well logging and gas show readings determined that these zones had indications of residual gas, but they do not contain sufficient gas resources to justify proceeding with the testing and completion program for the well. Drilling operations were performed without incident.



[1] For the nine months ended 30 September 2022, Tunisia realised oil prices are calculated using oil sales volumes of 456 bbl/d (31 December 2021 - 461 bbl/d).  As at 30 September 2022 there were 9,117 bbls of oil in inventory (31 December 2021 - 12,229 bbls).

[2] Shares held by Catherine Kempster (the spouse of Jon Kempster)

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
QRTFEASAWEESELF