Company Announcements

Anglo American Production Report Q1 2025

Source: RNS
RNS Number : 9483F
Anglo American PLC
24 April 2025
 
Click on, or paste the following link into your web browser, to view the associated PDF document:

http://www.rns-pdf.londonstockexchange.com/rns/9483F_1-2025-4-23.pdf

24 April 2025

Anglo American plc

Production Report for the first quarter ended 31 March 2025

Duncan Wanblad, Chief Executive of Anglo American, said: "We have had a strong start to the year in Copper and Iron Ore, with both businesses performing in line with guidance. In Copper, Quellaveco and Los Bronces are both performing well, helping to offset the expected lower grades and variability in recoveries at Collahuasi. In Iron Ore, Kumba posted another solid quarter and increased iron ore sales as Transnet saw better rail logistics performance, and Minas-Rio had another excellent quarter. Our focus on operational excellence is delivering valuable stability to our simplified portfolio which provides a strong base for the rest of the year.

"We are making good progress with our portfolio simplification as we prepare to complete the transactions through which we will exit our PGMs, Steelmaking Coal and Nickel businesses. The demerger of Anglo American Platinum is expected to be effective from 31 May, subject to shareholder approval on 30 April. The sale of our Steelmaking Coal business to Peabody Energy and the sale of our Nickel business to MMG Singapore Resources continue to target completion by Q3 2025. In the first quarter we finalised a new long-term diamond sales agreement with the Government of Botswana and we continue to pursue a dual track process to divest our interest in De Beers, which we are committed to completing at the right time and when market conditions allow.

"2025 is undoubtedly a year of portfolio and organisational transition for Anglo American and we will emerge as a highly differentiated, sustainably higher margin and higher return on capital employed investment proposition, well positioned for our next phase of growth and value delivery. While the impact of tariffs on the global economy is uncertain in the short-term, we have conviction in the strong longer-term outlook for our products, which have scope to become even more important to the changing global economy in coming years. Our restructuring and cost savings programme remains on track, giving us confidence that we are well on our way to reshaping our business and embedding far greater resilience, both through the cycle and in the current volatile macro environment.

"Looking ahead, we are working at pace with Codelco to secure definitive agreements later this year to develop a joint mine plan for our respective Los Bronces and Andina copper mines - both world-class in their own right. We are also advancing our considerable pipeline of organic growth options, with the recent designation of our polymetallic Sakatti project in Finland as a 'Strategic Project' by the European Commission further increasing confidence in our growth path to 1 million tonnes of annual copper production."

 Q1 2025 overview

Production

Q1 2025

Q1 2024

% vs. Q1 2024

Simplified portfolio

 

 

 

Copper (kt)(1)

169

198

(15)%

Iron ore (Mt)(2)

15.4

15.1

2%

Manganese ore (kt)

317

784

(60)%

 

 

 

 

Exiting businesses

 

 

 

Platinum group metals (koz)(3)

696

834

(17)%

Steelmaking coal (Mt)

2.2

3.8

(41)%

Nickel (kt)(4)

9.8

9.5

3%

Diamonds (Mct)(5)

6.1

6.9

(11)%

 

• Copper production was 168,900 tonnes, reflecting higher production from Peru as a result of higher grades, offset by planned lower production in Chile, which resulted in a 15% decrease year-on-year.

• Iron ore production increased by 2% to 15.4 million tonnes, primarily driven by a strong first quarter performance from Minas-Rio.

• Manganese ore production decreased by 60% to 317,000 tonnes, primarily due to the ongoing temporary suspension of the Australian operations following the damage caused by a tropical cyclone in March 2024. Export sales are expected to resume in the June 2025 quarter.

• Production from our Platinum Group Metals (PGMs) operations decreased by 17% to 696,300 ounces, primarily reflecting planned lower purchase of concentrate volumes, as well as heavy rains and widespread flooding which impacted own mined production, primarily at Amandelbult.

• Steelmaking coal production was 41% lower at 2.2 million tonnes, primarily due to the underground fire at Grosvenor in June 2024. Excluding the impact of Grosvenor and Jellinbah6, production increased by 11%, reflecting higher production at the Dawson open cut mine and the Aquila underground mine.

• Nickel production increased by 3% to 9,800 tonnes, reflecting operational stability at Barro Alto.

• Rough diamond production decreased by 11% to 6.1 million carats, reflecting the continued production response to the prolonged period of lower demand.

 

 

(1) Contained metal basis. Reflects copper production from the Copper operations in Chile and Peru only (excludes copper production from the Platinum Group Metals business).

(2) Wet basis.

(3) Produced ounces of metal in concentrate. 5E + gold (platinum, palladium, rhodium, ruthenium and iridium plus gold). Reflects own mined production and purchase of concentrate. 

(4) Reflects nickel production from the Nickel operations in Brazil only (excludes 4.2kt of Q1 2025 nickel production from the Platinum Group Metals business).

(5) Production is on a 100% basis, except for the Gahcho Kué joint operation which is on an attributable 51% basis.

(6) Anglo American's attributable share of Jellinbah was 23.3%. Anglo American agreed the sale of its 33.3% stake in Jellinbah in November 2024, and this transaction completed on 29 January 2025. Production and sale volumes from Jellinbah post 1 November 2024, after the sale was agreed, have been excluded from the Group's production report.

 

 

Production and unit cost guidance summary for 2025(1)

 

2025 production guidance

2025 unit cost guidance(2)

 

Simplified portfolio

 

Copper(3)

690-750 kt

c.151 c/lb

 

   Chile

 

   Peru

310-340 kt

c.110 c/lb

 

Iron Ore(4)

 

  Kumba

 

  Minas-Rio

 

 

Exiting businesses

 

 

Latest exit timelines

Platinum Group Metals - M&C(5)

Demerger on track for 31 May 2025, subject to shareholder approval

  Own mined

 

  POC

 

Platinum Group Metals - Refined(6)

3.0-3.4 Moz

 

Diamonds(7)

20-23 Mct

c.$94/carat

Dual track process ongoing for divestment or demerger

Steelmaking Coal(8)

10-12 Mt

c.$105/tonne

Sale transaction expected to complete by Q3 2025

Nickel(9)

37-39 kt

c.505 c/lb

Sale transaction expected to complete by Q3 2025

(1) Production and unit cost guidance does not reflect the impact of expected disposals/demergers.

(2) Unit costs exclude royalties and depreciation and include direct support costs only. FX rates used for 2025 unit costs: c.950 CLP:USD, c.3.75 PEN:USD, c.5.75 BRL:USD, c.18.60 ZAR:USD, c.1.60 AUD:USD. Subject to macro-economic factors. 

(3) Copper business only. On a contained-metal basis. Chile production is subject to water availability, and is expected to be weighted to the second half of 2025 given the impact from lower grades in the first half from Collahuasi, particularly in Q1. Unit cost total is a weighted average based on the mid-point of production guidance. The copper unit costs are impacted by FX rates and pricing of by-products, such as molybdenum.

(4) Wet basis. Kumba production is subject to third-party rail and port availability and performance. Minas-Rio production guidance reflects a pipeline inspection (that occurs every five years) planned for Q3 2025. Unit cost total is a weighted average based on the mid-point of production guidance.

(5) 5E + gold produced metal in concentrate (M&C) ounces. Includes own mined production and purchase of concentrate (POC) volumes. The average M&C split by metal is Platinum: c.44%, Palladium: c.32% and Other: c.24%. POC volumes will be lower than 2024 reflecting the impact of the Siyanda POC agreement transitioning to a 4E metals tolling arrangement expected in the first half of the year, as well as Kroondal having transitioned to a 4E metals tolling arrangement in September 2024. Production remains subject to the impact of Eskom load-curtailment. Unit cost is per own mined 5E + gold PGMs metal in concentrate ounce. The demerger of Anglo American Platinum is on track. The shareholder circular has been published and, following an approved ordinary resolution from the Anglo American shareholders on 30 April, it is expected that the effective date for the demerger will be Saturday, 31 May 2025.

(6) Refined production excludes toll refined material. Production remains subject to the impact of Eskom load-curtailment.

(7) Production is on a 100% basis, except for the Gahcho Kué joint operation which is on an attributable 51% basis. De Beers continues to monitor rough diamond trading conditions and will respond accordingly. Unit cost is based on De Beers' proportionate consolidated share of costs and associated production.

(8) Production excludes thermal coal by-product. Production guidance excludes Grosvenor as operations remain suspended and remains unchanged as we continue to assess potential impacts from the temporary stoppage at Moranbah. A walk-on/walk-off longwall move at Aquila, that will have a minimal production impact, is planned for Q3 2025. Definitive agreements to sell the entirety of the Steelmaking Coal business were announced in November 2024. Anglo American has sold its interest in Jellinbah to Zashvin Pty Limited, and this transaction completed on 29 January 2025. The remaining Steelmaking Coal portfolio will be sold to Peabody Energy, subject to relevant approvals, and this transaction is expected to complete by the third quarter of 2025. Steelmaking Coal FOB/tonne unit cost comprises managed operations and excludes royalties.

(9) Nickel operations in Brazil only. The Group also produces approximately 20kt of nickel on an annual basis from the PGM operations. A definitive agreement to sell the Nickel business to MMG Singapore Resources Pte. Ltd was announced in February 2025, subject to relevant approvals, with the transaction expected to complete by the third quarter of 2025.

 

 

Realised prices

 

Q1 2025

Q1 2024

Q1 2025 vs Q1 2024

FY 2024

Copper (USc/lb)(1)

444

395

12%

416

Copper Chile (USc/lb)(2)

458

396

16%

416

Copper Peru (USc/lb)

427

394

8%

415

Iron Ore - FOB prices(3)

96

83

16%

89

Kumba Export (US$/wmt)(4)

98

87

13%

92

Minas-Rio (US$/wmt)(5)

94

77

22%

84

Platinum Group Metals

 

 

 

 

Platinum (US$/oz)(6)

985

889

11%

955

Palladium (US$/oz)(6)

957

1,043

(8)%

1,003

Rhodium (US$/oz)(6)

4,556

4,563

0%

4,637

Basket price (US$/PGM oz)(7)

1,533

1,483

3%

1,468

Diamonds

 

 

 

 

Consolidated average realised price (US$/ct)(8)

124

201

(38)%

152

Average price index(9)

94

110

(15)%

107

Steelmaking Coal - HCC (US$/t)(10)

172

299

(42)%

241

Steelmaking Coal - PCI (US$/t)(10)

141

214

(34)%

177

Nickel (US$/lb)(11)

6.27

6.43

(2)%

6.82

(1) Average realised total copper price is a weighted average of the Copper Chile and Copper Peru realised prices.

(2) Realised price for Copper Chile excludes third-party sales volumes.

(3) Average realised total iron ore price is a weighted average of the Kumba and Minas-Rio realised prices.

(4) Average realised export basket price (FOB Saldanha) (wet basis as product is shipped with ~1.6% moisture). The realised prices could differ to Kumba's stand-alone results due to sales to other Group companies. Average realised export basket price (FOB Saldanha) on a dry basis is $100/t (Q1 2024: $89/t), higher than the dry 62% Fe benchmark price of $90/t (FOB South Africa, adjusted for freight).

(5) Average realised export basket price (FOB Açu) (wet basis as product is shipped with ~9% moisture).

(6) Realised price excludes trading.

(7) Price for a basket of goods per PGM oz. The dollar basket price is the net sales revenue from all metals sold (PGMs, base metals and other metals) excluding trading and foreign exchange translation impacts, per PGM 5E + gold ounces sold (own mined and purchase of concentrate) excluding trading.

(8) Consolidated average realised price based on 100% selling value post-aggregation.

(9) Average of the De Beers price index for the Sights within the period. The De Beers price index is relative to 100 as at December 2006.

(10)      Weighted average coal sales price achieved at managed operations. The average realised price for thermal coal by-product for Q1 2025 decreased by 19% to $96/t (Q1 2024: $118/t). FY 2024 average realised price for thermal coal by-product was $119/t. 

(11)      Nickel realised price reflects the market discount for ferronickel (the product produced by the Nickel business).

 

Summary of reported financial impacts from portfolio simplification during 2025

Based on the progress of the divestments, we expect the Steelmaking Coal and Nickel business segments to be reported as discontinued operations at the 2025 half year results, and the relevant assets and liabilities shown as held for sale. The demerger of the PGMs business segment, which is subject to shareholder approval, is also expected to be reported as a discontinued operation, if approved by shareholders on 30 April 2025.

A summary of the proceeds, taxes and transaction costs for those transactions that are expected to be completed this year, subject to completion and relevant approvals, are detailed below:

Steelmaking Coal - proceeds of $870 million1 have been received in January 2025 for the completed sale of our interest in Jellinbah. For the remaining Steelmaking Coal assets, proceeds of $1.975 billion2 (excluding the $75 million deposit already received upon signing) are expected on completion by Q3 2025, with c.$0.2 billion of expected taxes and transaction costs.

Nickel - proceeds of $350 million2 are expected on completion by Q3 2025, with negligible taxes and transaction costs expected.

PGMs - the demerger is expected to result in taxes and transaction costs of $0.4-0.5 billion in 2025 (excluding those to be incurred by Anglo American Platinum).

Restructuring costs incurred in 2025 are expected to be c.$0.3 billion and are expected to be recognised as a 'Special item'.    

 

(1) In line with the agreement, the initial cash consideration of $1,019 million was reduced by $149 million of cash dividends received in 2024 post agreement of the sale.

(2) Excludes the impact of any working capital adjustments.

 

For more information on Anglo American's announcements since our previous production report, please find links to our Press Releases below.


- 10 April 2025 | Anglo American update on sale of steelmaking coal business to Peabody

- 8 April 2025 | Anglo American publishes shareholder circular for demerger of Anglo American Platinum

- 25 March 2025 | Sakatti copper project in Finland awarded 'Strategic Project' status by European Commission

- 13 March 2025 | Anglo American Platinum - Mogalakwena mine achieves IRMA 50 on responsible mining standard

- 25 February 2025 | De Beers and Botswana sign diamond partnership for the next generation

- 20 February 2025 | Anglo American Full Year Results 2024

- 20 February 2025 | Notice of Final Dividend (Dividend No. 46)

- 20 February 2025 | Anglo American and Codelco to unlock significant value from joint mine plan for Los Bronces and Andina copper mines

- 18 February 2025 | Anglo American agrees sale of nickel business for up to $500 million

- 18 February 2025 | Kumba Iron Ore Limited year end results 2024

- 17 February 2025 | Anglo American sets out June demerger timeline for Anglo American Platinum

- 11 February 2025 | Anglo American completes sale of Peace River Coal to Conuma Resources

- 6 February 2025 | Q4 2024 Production Report

 

Copper

Copper(1) (tonnes)

Q1

Q1

Q1 2025 vs. Q1 2024

Q4

Q1 2025 vs. Q4 2024

2025

2024

2024

Copper

168,900

198,100

(15)%

197,500

(14)%

Copper Chile

89,000

126,100

(29)%

107,300

(17)%

Copper Peru

79,900

72,000

11%

90,200

(11)%

(1) Copper production shown on a contained metal basis. Reflects copper production from the Copper operations in Chile and Peru only (excludes copper production from the Platinum Group Metals business).

 

Copper production for the first quarter of 2025 was 168,900 tonnes, reflecting higher production from Quellaveco as a result of higher grades, offset by planned lower production in Chile, primarily from Collahuasi.

Chile - Copper production of 89,000 tonnes was lower than the comparative period, reflecting the planned lower ore grade at Collahuasi and planned lower throughput at Los Bronces.

Production from Los Bronces decreased by 11% to 43,400 tonnes, reflecting the benefit of higher grades (0.57% vs 0.47%) and improved plant performance and recoveries, which helped to partially offset the impact of the smaller, more costly Los Bronces plant, which was put on care and maintenance at the end of July 2024. The current mine phase of Los Bronces has lower grade and harder ore characteristics, and we are making good progress in the development of the next phase of the mine, Donoso 2, which has higher grade and softer ore. Development activities are under way and this phase is expected to be fully opened by early 2027.

At Collahuasi, Anglo American's attributable share of copper production decreased by 45% to 35,300 tonnes, reflecting the anticipated lower ore grades (0.86% vs 1.20%) as well as lower copper recoveries associated with lower ore feed quality from processing lower grade stockpiles. As previously disclosed, Collahuasi was expecting lower production in 2025 as the mine transitions between different phases, with Q1 being the lowest planned quarter before improvements are expected through the remainder of the year, with production weighted to the second half of the year.

Production from El Soldado decreased by 19% to 10,300 tonnes, reflecting lower throughput due to planned maintenance and planned lower grades (0.92% vs 0.94%).

The average realised price for Copper Chile was 458 c/lb as compared to the average LME price of 424 c/lb, benefitting from provisional pricing adjustments.

Peru - Quellaveco production increased by 11% to 79,900 tonnes, with the operation achieving a record first quarter performance, primarily due to higher grades (0.80% vs 0.72%). In 2025, the mine is expected, as planned, to average similar grades as in 2024, while the next phases are opened and developed, allowing for greater flexibility in the medium and long term. Optimising the coarse particle recovery plant remains a priority for 2025, and continued recovery improvements are expected progressively throughout the year.

The average realised price for Copper Peru was 427 c/lb as compared to the average LME price of 424 c/lb.

2025 Guidance

Production guidance for 2025 is unchanged at 690,000-750,000 tonnes (Chile 380,000-410,000 tonnes; Peru 310,000-340,000 tonnes). Chile production is subject to water availability, and is expected to be weighted to the second half of 2025 given the impact from lower grades in the first half from Collahuasi, particularly in Q1.

Unit cost guidance for 2025 is unchanged at c.151 c/lb(1) (Chile c.185 c/lb(1); Peru c.110 c/lb(1)).

(1) The copper unit costs are impacted by FX rates and pricing of by-products, such as molybdenum. FX rate assumption for 2025 unit costs of c.950 CLP:USD for Chile and c.3.75 PEN:USD for Peru.

 

 

Copper(1) (tonnes)

Q1

Q4

Q3

Q2

Q1

Q1 2025 vs. Q1 2024

Q1 2025 vs. Q4 2024

2025

2024

2024

2024

2024

Total copper production

168,900

197,500

181,300

195,700

198,100

(15)%

(14)%

Total copper sales volumes

173,300

204,800

173,200

213,600

177,300

(2)%

(15)%

 

 

 

 

 

 

 

 

Copper Chile

 

 

 

 

 

 

 

Los Bronces mine(2)

 

 

 

 

 

 

 

Ore mined

9,398,500

9,372,900

9,462,100

12,688,000

11,974,700

(22)%

0%

Ore processed - Sulphide

7,578,400

8,178,700

7,944,900

10,566,600

10,330,300

(27)%

(7)%

Ore grade processed -

Sulphide (% TCu)(3)

0.57

0.49

0.44

0.48

0.47

21%

16%

Production - Copper in concentrate

37,800

33,800

30,200

40,900

40,300

(6)%

12%

Production - Copper cathode

5,600

4,900

6,400

7,500

8,400

(33)%

14%

Total production

43,400

38,700

36,600

48,400

48,700

(11)%

12%

Collahuasi 100% basis

(Anglo American share 44%)

 

 

 

 

 

 

 

Ore mined

9,136,400

14,801,500

12,803,800

10,336,300

10,472,200

(13)%

(38)%

Ore processed - Sulphide

14,084,800

14,940,700

14,975,700

15,781,200

14,350,000

(2)%

(6)%

Ore grade processed -

Sulphide (% TCu)(3)

0.86

1.14

1.20

1.08

1.20

(28)%

(25)%

Anglo American's 44% share of copper production for Collahuasi

35,300

56,100

64,700

60,300

64,700

(45)%

(37)%

El Soldado mine(2)

 

 

 

 

 

 

 

Ore mined

1,495,400

2,315,600

2,255,700

1,805,600

1,857,400

(19)%

(35)%

Ore processed - Sulphide

1,454,400

1,689,100

1,505,800

1,568,700

1,712,600

(15)%

(14)%

Ore grade processed -

Sulphide (% TCu)(3)

0.92

0.94

0.95

0.94

0.94

(2)%

(2)%

Production - Copper in concentrate

10,300

12,500

11,300

11,700

12,700

(19)%

(18)%

Chagres smelter(2)

 

 

 

 

 

 

 

Ore smelted(4)

23,100

28,200

24,400

26,100

27,000

(14)%

(18)%

Production

22,000

27,400

23,300

25,400

25,600

(14)%

(20)%

Total copper production(5)

89,000

107,300

112,600

120,400

126,100

(29)%

(17)%

Total payable copper production

85,400

103,000

108,000

115,700

121,300

(30)%

(17)%

Total copper sales volumes

93,300

113,000

107,800

132,900

109,400

(15)%

(17)%

Total payable sales volumes

89,500

108,100

103,400

127,600

105,200

(15)%

(17)%

Third-party sales(6)

68,800

131,000

123,500

87,600

80,300

(14)%

(47)%

 

 

 

 

 

 

 

 

Copper Peru

 

 

 

 

 

 

 

Quellaveco mine(7)

 

 

 

 

 

 

 

Ore mined

11,454,700

14,845,200

8,730,500

9,486,400

11,025,800

4%

(23)%

Ore processed - Sulphide

12,465,200

12,865,300

12,431,300

12,397,000

12,206,700

2%

(3)%

Ore grade processed -

Sulphide (% TCu)(3)

0.80

0.89

0.70

0.74

0.72

11%

(10)%

Total copper production

79,900

90,200

68,700

75,300

72,000

11%

(11)%

Total payable copper production

77,300

87,200

66,400

72,800

69,600

11%

(11)%

Total copper sales volumes

80,000

91,800

65,400

80,700

67,900

18%

(13)%

Total payable sales volumes

77,100

88,500

62,900

77,700

65,500

18%

(13)%

(1) Excludes copper production from the Platinum Group Metals business.

(2) Anglo American ownership interest of Los Bronces, El Soldado and the Chagres smelter is 50.1%. Production is stated at 100% as Anglo American consolidates these operations.

(3) TCu = total copper.

(4) Copper contained basis. Includes third-party concentrate.

(5) Total copper production includes Anglo American's 44% interest in Collahuasi.

(6) Relates to sales of copper not produced by Anglo American operations.

(7) Anglo American ownership interest of Quellaveco is 60%. Production is stated at 100% as Anglo American consolidates this operation.

 

 

Iron Ore

Iron Ore (000 t)

Q1

Q1

Q1 2025 vs. Q1 2024

Q4

Q1 2025 vs. Q4 2024

2025

2024

2024

Iron Ore

15,445

15,143

2%

14,299

8%

Kumba(1)

8,990

9,275

(3)%

7,826

15%

Minas-Rio(2)

6,455

5,868

10%

6,473

0%

(1) Volumes are reported as wet metric tonnes. Product is shipped with ~1.6% moisture.

(2) Volumes are reported as wet metric tonnes. Product is shipped with ~9% moisture.


Iron ore production increased by 2% to 15 million tonnes, primarily driven by a strong first quarter performance from Minas-Rio.

Kumba - Total production of 9.0 million tonnes in the quarter reflects a flexible production approach to managing Sishen and Kolomela as one integrated complex. Integrated production was set to enable on-mine stockpiles to be proactively drawn down, with Sishen production 9% lower, largely offset by 12% higher production at Kolomela.

Total sales increased by 7% to 8.9 million tonnes(1), reflecting improved rail performance in the quarter and the equipment reliability challenges experienced at Saldanha Bay Port in the comparative period.

Total finished stock was 7.8 million tonnes(1), higher than Q4 2024 (7.5 million tonnes)(1). Improved rail performance by Transnet enabled a drawdown of stock at the mines to 6.2 million tonnes(1), with stock at the port at a more normalised level of 1.6 million tonnes(1).

Kumba's iron (Fe) content averaged 64.2% (Q1 2024: 64.2%), while the average lump:fines ratio was 68:32 (Q1 2024: 66:34).

The average realised price of $98/tonne(1) (FOB South Africa, wet basis) was 11% higher than the 62% Fe benchmark price of $88/tonne(1) (FOB South Africa, adjusted for freight and moisture), primarily reflecting the benefit of premiums for higher iron content and lump product.

 

Minas-Rio - Production increased by 10% to 6.5 million tonnes, a record first quarter performance. This result was underpinned by improved mass recovery performance at the beneficiation plant, driven by reduced ore feed variability, higher iron ore content, and greater operational stability due to fewer unplanned maintenance hours.

The average realised price of $94/tonne (FOB Brazil, wet basis) was 8% higher than the Metal Bulletin 65 price of $87/tonne (FOB Brazil, adjusted for freight and moisture), benefitting from the premium for our high quality product, including higher (~67%) Fe content and provisionally priced sales volumes.

 

2025 Guidance

Production guidance for 2025 is unchanged at 57-61 million tonnes (Kumba 35-37 million tonnes; Minas-Rio 22-24 million tonnes). Kumba is subject to third-party rail and port availability and performance. Minas-Rio's production guidance reflects a pipeline inspection (that occurs every five years) planned for Q3 2025.

Unit cost guidance for 2025 is unchanged at c.$36/tonne(2) (Kumba c.$39/tonne(2); Minas-Rio c.$32/tonne(2)).

(1) Production and sales volumes, stock and realised price are reported on a wet basis and could differ to Kumba's stand-alone results due to sales to other Group companies. At Q4 2024, total finished stock was 7.5 million tonnes, stock at the mines was 6.9 million tonnes and stock at the port was 0.5 million tonnes. At Q1 2024, total finished stock was 8.6 million tonnes, stock at the mines was 6.9 million tonnes and stock at the port was 1.7 million tonnes.

(2) FX rate assumption for 2025 unit costs of c.18.60 ZAR:USD for Kumba and c.5.75 BRL:USD for Minas-Rio

 

 

Iron Ore (000 t)

Q1

Q4

Q3

Q2

Q1

Q1 2025 vs. Q1 2024

Q1 2025 vs. Q4 2024

2025

2024

2024

2024

2024

Iron Ore production(1)

15,445

14,299

15,746

15,580

15,143

2%

8%

Iron Ore sales(1)

14,564

16,223

15,181

16,508

12,997

12%

(10)%

 

 

 

 

 

 

 

 

Kumba production

8,990

7,826

9,446

9,184

9,275

(3)%

15%

Sishen

5,955

5,687

6,767

6,644

6,563

(9)%

5%

Kolomela

3,035

2,139

2,679

2,540

2,712

12%

42%

Kumba sales volumes(2)

8,939

9,289

8,822

9,705

8,383

7%

(4)%

Lump(2)

6,037

6,477

5,734

5,981

5,520

9%

(7)%

Fines(2)

2,902

2,812

3,088

3,724

2,863

1%

3%

 

 

 

 

 

 

 

 

Minas-Rio production

 

 

 

 

 

 

 

Pellet feed

6,455

6,473

6,300

6,396

5,868

10%

0%

Minas-Rio sales volumes

 

 

 

 

 

 

 

Export - pellet feed

5,625

6,934

6,359

6,803

4,614

22%

(19)%

(1) Total iron ore is the sum of Kumba and Minas-Rio and reported in wet metric tonnes. Kumba product is shipped with ~1.6% moisture and Minas-Rio product is shipped with ~9% moisture.

(2) Sales volumes could differ to Kumba's stand-alone results due to sales to other Group companies.

 

Platinum Group Metals (PGMs)

PGMs (000 oz)(1)

Q1

Q1

Q1 2025 vs. Q1 2024

Q4

Q1 2025 vs. Q4 2024

2025

2024

2024

Metal in concentrate production

696

834

(17)%

876

(20)%

Own mined(2)

462

504

(8)%

588

(21)%

Purchase of concentrate (POC)(3)

234

330

(29)%

287

(18)%

Refined production(4)

437

628

(30)%

1,028

(57)%

(1) Ounces refer to troy ounces. PGMs consists of 5E + gold (platinum, palladium, rhodium, ruthenium and iridium plus gold).

(2) Includes managed operations and 50% of joint operation production.

(3) Includes the other 50% of joint operation production, as well as the purchase of concentrate from third parties.

(4) Refined production excludes toll refined material.

Metal in concentrate production

Production for the quarter was affected by heavy rains and widespread flooding, primarily at Amandelbult, resulting in an 8% decrease in own mined production to 462,000 ounces.

Production at Mogalakwena increased by 3% to 227,000 ounces, reflecting higher throughput at the concentrators and marginally higher grades. Four Jameson cells were commissioned at the North Concentrator during the quarter as part of a mass pull and recovery optimisation strategy. Once fully operational, this strategy is expected to produce a higher grade concentrate, enabling reduced concentrate volumes and smelting requirements, while improving energy efficiency and reducing emissions.

Mototolo production increased by 7% to 66,200 ounces, reflecting the benefits of the new seven-day mining shift cycle implemented in the second quarter of 2024.

Amandelbult was affected by heavy rains which caused widespread flooding in the region. The significant rainfall and subsequent overflow of the nearby river systems resulted in the suspension of operations at the Tumela mine at the end of February. As a consequence, production at Amandelbult decreased by 32% to 85,800 ounces. All operations at Amandelbult have since restarted, with the exception of Tumela Lower, where de-watering activities were completed in mid-April and work has now shifted to infrastructure repairs, and mining operations are expected to commence from mid-year and be fully ramped up in the third quarter.

Unki production decreased by 15% to 53,600 ounces mainly as a result of expected lower grades, and Modikwa's production decreased by 11% to 29,400 ounces primarily due to lower concentrator plant recovery following the introduction of open pit material during the quarter.

Purchase of concentrate decreased by 29% to 234,300 ounces, reflecting planned lower Kroondal volumes, which had transitioned to a 4E tolling arrangement in September 2024, as well as lower receipts from third parties due to the heavy rainfall.

Refined production

Refined production decreased by 30% to 437,100 ounces, owing to the triennial stock count at the Precious Metals Refinery, the transition of Kroondal volumes (~66,000 ounces) to a 4E tolling arrangement and lower M&C production. There was no Eskom load-curtailment on the operations.

Sales

Sales volumes decreased by 30% to 493,700 ounces, in line with lower refined production.

The average realised basket price of $1,533/PGM ounce was 3% higher driven by an 11% higher platinum realised price, partially offset by an 8% lower palladium realised price.

As previously announced, Anglo American is on track with the demerger of Anglo American Platinum Limited. The shareholder circular has been published and, following an approved ordinary resolution from the Anglo American shareholders on 30 April, it is expected that the effective date for the demerger will be Saturday, 31 May 2025.

2025 Guidance

Production guidance for 2025 for metal in concentrate(1) and refined production is unchanged at 3.0-3.4 million ounces. POC volumes will be lower than 2024 reflecting the impact of the Siyanda POC agreement transitioning to a 4E metals tolling arrangement expected in the first half of the year, as well as Kroondal having transitioned to a 4E metals tolling arrangement in September 2024. Production remains subject to the impact of Eskom load-curtailment.

Unit cost guidance for 2025 is unchanged at c.$970/PGM ounce(2).

(1) Metal in concentrate (M&C) production by source is expected to be own mined of 2.1-2.3 million ounces and purchase of concentrate of 0.9-1.1 million ounces. The average M&C split by metal is Platinum: c.44%, Palladium: c.32% and Other: c.24%.

(2) FX rate assumption for 2025 unit costs of c.18.60 ZAR:USD.

 

 

 

Q1

Q4

Q3

Q2

Q1

Q1 2025 vs. Q1 2024

Q1 2025 vs. Q4 2024

 

2025

2024

2024

2024

2024

M&C PGMs production (000 oz)(1)

696.3

875.7

922.3

921.0

834.1

(17)%

(20)%

Own mined

462.0

588.3

552.0

547.2

504.3

(8)%

(21)%

Mogalakwena

227.0

283.5

217.8

232.6

219.5

3%

(20)%

Amandelbult

85.8

136.9

158.2

157.6

127.1

(32)%

(37)%

Mototolo

66.2

74.2

74.1

66.3

61.9

7%

(11)%

Unki

53.6

60.3

62.2

54.7

62.8

(15)%

(11)%

Modikwa - joint operation(2)

29.4

33.4

39.7

36.0

33.0

(11)%

(12)%

Purchase of concentrate

234.3

287.4

370.3

373.8

329.8

(29)%

(18)%

Modikwa - joint operation(2)

29.4

33.4

39.7

36.0

33.0

(11)%

(12)%

Third parties(3)

204.9

254.0

330.6

337.8

296.8

(31)%

(19)%

 

 

 

 

 

 

 

 

Refined PGMs production (000 oz)(1)(4)

437.1

1,027.9

1,106.9

1,153.5

628.0

(30)%

(57)%

By metal:

 

 

 

 

 

 

 

Platinum

170.2

482.1

536.9

554.0

272.7

(38)%

(65)%

Palladium

141.3

327.9

341.7

372.5

206.4

(32)%

(57)%

Rhodium

27.6

67.8

70.2

70.8

39.6

(30)%

(59)%

Other PGMs and gold

98.0

150.1

158.1

156.2

109.3

(10)%

(35)%

Nickel (tonnes)

4,200

6,300

7,400

7,300

4,700

(11)%

(33)%

Tolled material (000 oz)(3)(5)

208.2

182.8

153.8

132.9

160.2

30%

14%

PGMs sales from production (000 oz)(1)

493.7

1,002.0

1,102.2

1,266.1

707.5

(30)%

(51)%

Third-party PGMs sales (000 oz)(1)(6)

2,528.5

2,476.5

1,973.7

2,092.4

1,200.1

111%

2%

4E head grade (g/t milled)(7)

2.91

3.34

3.22

3.17

3.05

(5)%

(13)%

(1) M&C refers to metal in concentrate. Ounces refer to troy ounces. PGMs consists of 5E + gold (platinum, palladium, rhodium, ruthenium and iridium plus gold).

(2) Modikwa is a 50% joint operation. The 50% equity share of production is presented under 'Own mined' production. Anglo American Platinum purchases the remaining 50% of production, which is presented under 'Purchase of concentrate'.

(3) Kroondal was a 50% joint operation until 1 November 2023. Upon the disposal of our 50% interest, Kroondal transitioned to a 100% third-party purchase of concentrate arrangement, whereby 100% of production is presented under 'Purchase of concentrate: Third parties' until it transitioned to a toll arrangement. As expected, from 1 September 2024, Kroondal transitioned to a 4E toll arrangement on the same terms as other Sibanye-Stillwater tolled volumes, which is presented under 'Tolled material'.

(4) Refined production excludes toll material.

(5) Tolled volume measured as the combined content of: platinum, palladium, rhodium and gold, reflecting the tolling agreements in place.

(6) Relates to sales of metal not produced by Anglo American operations, and includes metal lending and borrowing activity.

(7) 4E: the grade measured as the combined content of: platinum, palladium, rhodium and gold, excludes tolled material. Minor metals are excluded due to variability

 

 

 

.De Beers - Diamonds

Diamonds(1) (000 carats)

Q1

Q1

Q1 2025 vs. Q1 2024

Q4

Q1 2025 vs. Q4 2024

2025

2024

2024

Botswana

4,572

4,987

(8)%

4,244

8%

Namibia

631

633

0%

584

8%

South Africa

483

598

(19)%

550

(12)%

Canada

389

645

(40)%

456

(15)%

Total carats recovered

6,075

6,863

(11)%

5,834

4%

(1) Production is on a 100% basis, except for the Gahcho Kué joint operation which is on an attributable 51% basis.

Operational Performance

Rough diamond production decreased by 11% to 6.1 million carats, reflecting the continued production response to the prolonged period of lower demand.

In Botswana, production decreased by 8% to 4.6 million carats, as a result of the planned actions to lower production.

Production in Namibia is broadly unchanged, with planned actions to lower production at Debmarine Namibia offset by planned mining of higher grade areas and better recoveries at Namdeb.

In South Africa, production decreased by 19% to 0.5 million carats, due to changes in shift configuration as well as the impact of the heavy rainfall and flooding in January 2025 which temporarily restricted access to the mining operations.

Production in Canada decreased by 40% to 0.4 million carats due to planned treatment of lower grade ore.

Trading Performance

Consumer demand for diamond jewellery in the United States over the year-end holiday season was in line with expectations, however, rough diamond demand in the first quarter remained subdued as the midstream continued its cautious approach to restocking due to excess loose polished diamond inventory. While there were signs of loose polished diamond prices stabilising towards the end of the quarter, lifting industry confidence, ongoing macroeconomic uncertainty, in particular the impact of US tariffs, will likely result in continued cautious Sightholder purchases in the near term. We continue to manage the business to preserve cash while maintaining underlying value.

Rough diamond sales from two Sights in Q1 2025 totalled 4.7 million carats (4.2 million carats on a consolidated basis)(1), generating consolidated rough diamond sales revenue of $520 million. This compared with two Sights in Q1 2024 of 4.9 million carats (4.6 million carats on a consolidated basis)(1), generating consolidated rough diamond revenue of $925 million.

The consolidated average realised price decreased by 38% to $124/ct, reflecting the impact of a change in sales mix, stock rebalancing, as well as a 15% decrease in the average rough price index.

2025 Guidance

Production guidance(2) for 2025 is unchanged at 20-23 million carats (100% basis). De Beers continues to monitor rough diamond trading conditions and will respond accordingly.

Unit cost guidance for 2025 is unchanged at c.$94/carat(3).

(1) Consolidated sales volumes exclude De Beers Group's JV partners' 50% proportionate share of sales to entities outside De Beers Group from the Diamond Trading Company Botswana and the Namibia Diamond Trading Company, which are included in total sales volume (100% basis).

(2) Production is on a 100% basis, except for the Gahcho Kué joint operation which is on an attributable 51% basis.

(3) FX rate assumption for 2025 unit costs of c.18.60 ZAR:USD.

 

 

 

Diamonds(1)

Q1

Q4

Q3

Q2

Q1

Q1 2025 vs. Q1 2024

Q1 2025 vs. Q4 2024

2025

2024

2024

2024

2024

Carats recovered (000 carats)

 

 

 

 

 

 

 

100% basis (unless stated)

 

 

 

 

 

 

 

Jwaneng

2,249

1,002

1,402

1,881

2,494

(10)%

124%

Orapa(2)

2,323

3,242

2,592

2,829

2,493

(7)%

(28)%

Total Botswana

4,572

4,244

3,994

4,710

4,987

(8)%

8%

 

 

 

 

 

 

 

 

Debmarine Namibia

461

395

298

427

505

(9)%

17%

Namdeb (land operations)

170

189

158

134

128

33%

(10)%

Total Namibia

631

584

456

561

633

0%

8%

 

 

 

 

 

 

 

 

Venetia

483

550

513

505

598

(19)%

(12)%

Total South Africa

483

550

513

505

598

(19)%

(12)%

 

 

 

 

 

 

 

 

Gahcho Kué (51% basis)

389

456

603

673

645

(40)%

(15)%

Total Canada

389

456

603

673

645

(40)%

(15)%

Total carats recovered

6,075

5,834

5,566

6,449

6,863

(11)%

4%

 

 

 

 

 

 

 

 

Total sales volume (100%) (000 carats)(3)

4,715

4,647

2,077

7,819

4,869

(3)%

1%

Consolidated sales volume (000 carats)(3)

4,190

4,273

1,665

7,333

4,612

(9)%

(2)%

Consolidated rough diamond sales value ($m)(4)

520

543

213

1,039

925

(44)%

(4)%

Average price ($/ct)(5)

124

127

128

142

201

(38)%

(2)%

Average price index(6)

94

100

107

108

110

(15)%

(6)%

Number of Sights

2

4(7)

1

3

2

 

 

(1) Production is on a 100% basis, except for the Gahcho Kué joint operation which is on an attributable 51% basis.

(2) Orapa constitutes the Orapa Regime which includes Orapa, Letlhakane and Damtshaa.

(3) Consolidated sales volumes exclude De Beers Group's JV partners' 50% proportionate share of sales to entities outside De Beers Group from the Diamond Trading Company Botswana and the Namibia Diamond Trading Company, which are included in total sales volume (100% basis).

(4) Consolidated rough diamond sales value includes De Beers Group's 50% proportionate share of sales to entities outside De Beers Group from Diamond Trading Company Botswana and the Namibia Diamond Trading Company.

(5) Consolidated average realised price based on 100% selling value post-aggregation.

(6) Average of the De Beers price index for the Sights within the period. The De Beers price index is relative to 100 as at December 2006.

(7) In Q4 2024, Sight 7 and 8 were combined into a single selling event due to challenging trading conditions.

Steelmaking Coal

Steelmaking Coal(1)(2) (000 t)

Q1

Q1

Q1 2025 vs. Q1 2024

Q4

Q1 2025 vs. Q4 2024

2025

2024

2024

Steelmaking Coal

2,239

3,780

(41)%

2,424

(8)%

(1) Anglo American's attributable share of saleable production. Steelmaking coal production volumes may include some product sold as thermal coal and includes production relating to third-party product purchased and processed at Anglo American's operations.

(2) Anglo American's attributable share of Jellinbah was 23.3%. Anglo American agreed the sale of its 33.3% stake in Jellinbah in November 2024, and this transaction completed on 29 January 2025. Production and sale volumes from Jellinbah post 1 November 2024, after the sale was agreed, have been excluded from the Group's production report.

 

Steelmaking coal production decreased by 41% to 2.2 million tonnes, primarily impacted by the suspension of mining at the Grosvenor longwall operation following the underground fire in June 2024 and the sale of our minority interest in Jellinbah which completed in January 2025. Excluding the impact of Grosvenor and Jellinbah, production increased by 11%, with higher production from both the Dawson open cut mine and the Aquila underground mine. This was partially offset by lower production at Moranbah due to difficult strata conditions and an extended ramp-up of the new longwall.

The ratio of hard coking coal production to PCI/semi-soft coking coal was 78:22 during the quarter, broadly in line with Q1 2024 (77:23).

The average realised price for hard coking coal was $172/tonne, compared to the benchmark price of $185/tonne. This resulted in a decrease in the price realisation to 93% (Q1 2024: 97%), reflecting a more normalised realisation compared to the comparative period, which benefitted as a result of the timing of sales.

Significant work continues across the Grosvenor mine to enable the safe re-entry of people and equipment.

On 31 March, a small, contained ignition occurred in the goaf at Moranbah, resulting in the controlled and safe withdrawal of all personnel to the surface. Initial re-entry to Moranbah was completed on 19 April 2025 following appropriate engagement. We remain committed to working closely with the regulator and key stakeholders as we progress towards a structured restart to longwall production once it is determined it is safe to do so.

As previously announced, Anglo American has entered into definitive agreements to sell the remaining portfolio of Steelmaking Coal assets in Australia to Peabody Energy, subject to relevant approvals, with the transaction expected to complete by Q3 2025.

2025 Guidance

Production guidance for 2025 is unchanged at 10-12 million tonnes as we continue to assess potential impacts from the temporary stoppage at Moranbah. Production guidance excludes Grosvenor as operations remain suspended. A walk-on/walk-off longwall move at Aquila, that will have a minimal production impact, is planned for Q3 2025.

Unit cost guidance for 2025 is unchanged at c.$105/tonne(1).

(1) FX rate assumption for 2025 unit costs of c.1.60 AUD:USD.

 

Coal, by product (000 t)(1)

Q1

Q4

Q3

Q2

Q1

Q1 2025 vs. Q1 2024

Q1 2025 vs. Q4 2024

2025

2024

2024

2024

2024

Production volumes

 

 

 

 

 

 

 

Steelmaking Coal(2)(3)(4)

2,239

2,424

4,102

4,238

3,780

(41)%

(8)%

Hard coking coal(2)

1,757

1,561

3,019

3,321

2,921

(40)%

13%

PCI / SSCC

482

863

1,083

917

859

(44)%

(44)%

Export thermal coal

244

396

249

142

324

(25)%

(38)%

Sales volumes

 

 

 

 

 

 

 

Steelmaking Coal(2)(4)

1,631

2,580

3,921

4,105

3,827

(57)%

(37)%

Hard coking coal(2)

1,315

1,846

3,027

3,212

2,974

(56)%

(29)%

PCI / SSCC

316

734

894

893

853

(63)%

(57)%

Export thermal coal

472

647

579

311

429

10%

(27)%

 

Steelmaking coal, by operation (000 t)(1)

Q1

Q4

Q3

Q2

Q1

Q1 2025 vs. Q1 2024

Q1 2025 vs. Q4 2024

2025

2024

2024

2024

2024

Steelmaking Coal(2)(3)(4)

2,239

2,424

4,102

4,238

3,780

(41)%

(8)%

Moranbah(2)

532

176

1,117

923

561

(5)%

202%

Grosvenor

-

-

191

1,215

967

n/a

n/a

Aquila (incl. Capcoal)(2)

1,086

1,096

1,068

626

977

11%

(1)%

Dawson

621

845

928

647

487

28%

(27)%

Jellinbah(4)

-

307

798

827

788

n/a

n/a

(1) Anglo American's attributable share of saleable production.

(2) Includes production relating to third-party product purchased and processed at Anglo American's operations.

(3) Steelmaking coal production volumes may include some product sold as thermal coal.

(4) Anglo American's attributable share of Jellinbah was 23.3%. Anglo American agreed the sale of its 33.3% stake in Jellinbah in November 2024, and this transaction completed on 29 January 2025. Production and sale volumes from Jellinbah post 1 November 2024, after the sale was agreed, have been excluded from the Group's production report.

 

 

Nickel

Nickel(1) (tonnes)

Q1

Q1

Q1 2025 vs. Q1 2024

Q4

Q1 2025 vs. Q4 2024

2025

2024

2024

Nickel

9,800

9,500

3%

10,000

(2)%

(1) Excludes nickel production from the Platinum Group Metals business.

 

Production increased by 3% to 9,800 tonnes, reflecting operational stability at Barro Alto, despite lower grades.

As previously announced, Anglo American has entered into a definitive agreement to sell the Nickel business to MMG Singapore Resources Pte. Ltd, subject to relevant approvals, with the transaction expected to complete by Q3 2025.

2025 Guidance

Production guidance for 2025 is unchanged at 37,000-39,000 tonnes.

Unit cost guidance for 2025 is unchanged at c.505 c/lb(1).

(1) FX rate assumption for 2025 unit costs of c.5.75 BRL:USD.

 

 

Nickel (tonnes)

Q1

Q4

Q3

Q2

Q1

Q1 2025 vs. Q1 2024

Q1 2025 vs. Q4 2024

2025

2024

2024

2024

2024

Barro Alto

 

 

 

 

 

 

 

Ore mined

515,000

254,500

1,166,800

1,275,400

319,200

61%

102%

Ore processed

640,300

604,000

617,700

616,800

636,500

1%

6%

Ore grade processed - %Ni

1.39

1.42

1.50

1.51

1.42

(2)%

(2)%

Production

8,100

8,100

8,200

8,200

7,800

4%

0%

Codemin

 

 

 

 

 

 

 

Ore mined

1,400

200

-

-

-

n/a

600%

Ore processed

129,200

146,400

140,800

139,700

136,300

(5)%

(12)%

Ore grade processed - %Ni

1.37

1.42

1.42

1.45

1.43

(4)%

(4)%

Production

1,700

1,900

1,700

1,800

1,700

0%

(11)%

Total nickel production(1)

9,800

10,000

9,900

10,000

9,500

3%

(2)%

Sales volumes

10,100

10,300

9,200

11,300

7,700

31%

(2)%

(1) Excludes nickel production from the Platinum Group Metals business

Manganese

Manganese (000 t)

Q1

Q1

Q1 2025 vs. Q1 2024

Q4

Q1 2025 vs. Q4 2024

2025

2024

2024

Manganese ore(1)

317

784

(60)%

742

(57)%

(1) Anglo American's 40% attributable share of saleable production.

 

Manganese ore production decreased by 60% to 317,000 tonnes, primarily due to the ongoing temporary suspension of the Australian operations following the damage caused by tropical cyclone Megan in March 2024. During 2024, operational recovery focused on re-establishing critical services and undertaking a substantial de-watering programme which enabled a phased return to mining activities in June 2024. These mining activities have enabled the operation to build-up sufficient stockpiles and finished goods, resulting in the wash plant being paused for most of this quarter. Export sales are expected to resume and progressively increase over the June quarter.

 

Manganese (tonnes)

Q1

Q4

Q3

Q2

Q1

Q1 2025 vs. Q1 2024

Q1 2025 vs. Q4 2024

2025

2024

2024

2024

2024

Samancor production

 

 

 

 

 

 

 

Manganese ore(1)

317,000

742,400

405,500

356,000

783,800

(60)%

(57)%

Samancor sales volumes

 

 

 

 

 

 

 

Manganese ore

271,500

331,600

393,500

365,800

796,800

(66)%

(18)%

(1) Anglo American's 40% attributable share of saleable production.

 

 

Exploration and evaluation

Exploration and evaluation expenditure in Q1 2025 decreased by 12% to $58 million compared to the same period last year. Exploration expenditure decreased by 19% to $22 million, primarily due to planned lower spend. Evaluation expenditure decreased by 8%  to $36 million, primarily due to planned lower spend in Steelmaking Coal.


Notes

• This Production Report for the first quarter ended 31 March 2025 is unaudited.

• Production figures are sometimes more precise than the rounded numbers shown in this Production Report.

• Please refer to page 19 for information on forward-looking statements.


In this document, references to "Anglo American", the "Anglo American Group", the "Group", "we", "us", and "our" are to refer to either Anglo American plc and its subsidiaries and/or those who work for them generally, or where it is not necessary to refer to a particular entity, entities or persons. The use of those generic terms herein is for convenience only, and is in no way indicative of how the Anglo American Group or any entity within it is structured, managed or controlled. Anglo American subsidiaries, and their management, are responsible for their own day-to-day operations, including but not limited to securing and maintaining all relevant licences and permits, operational adaptation and implementation of Group policies, management, training and any applicable local grievance mechanisms. Anglo American produces Group-wide policies and procedures to ensure best uniform practices and standardisation across the Anglo American Group but is not responsible for the day to day implementation of such policies. Such policies and procedures constitute prescribed minimum standards only. Group operating subsidiaries are responsible for adapting those policies and procedures to reflect local conditions where appropriate, and for implementation, oversight and monitoring within their specific businesses.

This document is for information purposes only and does not constitute, nor is to be construed as, an offer to sell or the recommendation, solicitation, inducement or offer to buy, subscribe for or sell shares in Anglo American or any other securities by Anglo American or any other party. Further, it should not be treated as giving investment, legal, accounting, regulatory, taxation or other advice and has no regard to the specific investment or other objectives, financial situation or particular needs of any recipient.

 

For further information, please contact:

Media

Investors

UK

James Wyatt-Tilby

james.wyatt-tilby@angloamerican.com

Tel: +44 (0)20 7968 8759

 

Marcelo Esquivel

marcelo.esquivel@angloamerican.com

Tel: +44 (0)20 7968 8891

 

Rebecca Meeson-Frizelle

rebecca.meeson-frizelle@angloamerican.com

Tel: +44 (0)20 7968 1374

 

South Africa

Nevashnee Naicker

nevashnee.naicker@angloamerican.com

Tel: +27 (0)11 638 3189

 

Ernest Mulibana

ernest.mulibana@angloamerican.com

Tel: +27 82 263 7372

 

UK

Tyler Broda

tyler.broda@angloamerican.com

Tel: +44 (0)20 7968 1470

 

Emma Waterworth

emma.waterworth@angloamerican.com

Tel: +44 (0)20 7968 8574

 

Michelle West-Russell

michelle.west-russell@angloamerican.com

Tel: +44 (0)20 7968 1494

 

Asanda Malimba

asanda.malimba@angloamerican.com

Tel: +44 (0)20 7968 8480

 

 

 

 

 

 

 

Notes:

Anglo American is a leading global mining company focused on the responsible production of copper, premium iron ore and crop nutrients - future-enabling products that are essential for decarbonising the global economy, improving living standards, and food security. Our portfolio of world-class operations and outstanding resource endowments offers value-accretive growth potential across all three businesses, positioning us to deliver into structurally attractive major demand growth trends.

Our integrated approach to sustainability and innovation drives our decision-making across the value chain, from how we discover new resources to how we mine, process, move and market our products to our customers - safely, efficiently and responsibly. Our Sustainable Mining Plan commits us to a series of stretching goals over different time horizons to ensure we contribute to a healthy environment, create thriving communities and build trust as a corporate leader. We work together with our business partners and diverse stakeholders to unlock enduring value from precious natural resources for our shareholders, for the benefit of the communities and countries in which we operate, and for society as a whole. Anglo American is re-imagining mining to improve people's lives.

Anglo American is currently implementing a number of major structural changes to unlock the inherent value in its portfolio and thereby accelerate delivery of its strategic priorities of Operational excellence, Portfolio simplification, and Growth. This portfolio transformation will focus Anglo American on its world-class resource asset base in copper, premium iron ore and crop nutrients, once the sale of our steelmaking coal and nickel businesses, the demerger of our PGMs business (Anglo American Platinum), and the separation of our iconic diamond business (De Beers) have been completed.

www.angloamerican.com

 

 

 


Forward-looking statements and third-party information:

This announcement includes forward-looking statements. All statements other than statements of historical facts included in this document, including, without limitation, those regarding Anglo American's financial position, business, acquisition and divestment strategy, dividend policy, plans and objectives of management for future operations, prospects and projects (including development plans and objectives relating to Anglo American's products, production forecasts and Ore Reserve and Mineral Resource positions) and sustainability performance related (including environmental, social and governance) goals, ambitions, targets, visions, milestones and aspirations, are forward-looking statements. By their nature, such forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Anglo American or industry results to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements.

Such forward-looking statements are based on numerous assumptions regarding Anglo American's present and future business strategies and the environment in which Anglo American will operate in the future. Important factors that could cause Anglo American's actual results, performance or achievements to differ materially from those in the forward-looking statements include, among others, levels of actual production during any period, levels of global demand and product prices, unanticipated downturns in business relationships with customers or their purchases from Anglo American, mineral resource exploration and project development capabilities and delivery, recovery rates and other operational capabilities, safety, health or environmental incidents, the effects of global pandemics and outbreaks of infectious diseases, the impact of attacks from third parties on our information systems, natural catastrophes or adverse geological conditions, climate change and extreme weather events, the outcome of litigation or regulatory proceedings, the availability of mining and processing equipment, the ability to obtain key inputs in a timely manner, the ability to produce and transport products profitably, the availability of necessary infrastructure (including transportation) services, the development, efficacy and adoption of new or competing technology, challenges in realising resource estimates or discovering new economic mineralisation, the impact of foreign currency exchange rates on market prices and operating costs, the availability of sufficient credit, liquidity and counterparty risks, the effects of inflation, terrorism, war, conflict, political or civil unrest, uncertainty, tensions and disputes and economic and financial conditions around the world, evolving societal and stakeholder requirements and expectations, shortages of skilled employees, unexpected difficulties relating to acquisitions or divestitures, competitive pressures and the actions of competitors, activities by courts, regulators and governmental authorities such as in relation to permitting or forcing closure of mines and ceasing of operations or maintenance of Anglo American's assets and changes in taxation or safety, health, environmental or other types of regulation in the countries where Anglo American operates, conflicts over land and resource ownership rights and such other risk factors identified in Anglo American's most recent Annual Report. Forward-looking statements should, therefore, be construed in light of such risk factors and undue reliance should not be placed on forward-looking statements.

These forward-looking statements speak only as of the date of this document. Anglo American expressly disclaims any obligation or undertaking (except as required by applicable law, the City Code on Takeovers and Mergers, the UK Listing Rules, the Disclosure Guidance and Transparency Rules of the Financial Conduct Authority, the Listings Requirements of the securities exchange of the JSE Limited in South Africa, the SIX Swiss Exchange, the Botswana Stock Exchange and the Namibian Stock Exchange and any other applicable regulations) to release publicly any updates or revisions to any forward-looking statement contained herein to reflect any change in Anglo American's expectations with regard thereto or any change in events, conditions or circumstances on which any such statement is based.

Nothing in this document should be interpreted to mean that future earnings per share of Anglo American will necessarily match or exceed its historical published earnings per share. Certain statistical and other information included in this document is sourced from third-party sources (including, but not limited to, externally conducted studies and trials). As such it has not been independently verified and presents the views of those third parties, but may not necessarily correspond to the views held by Anglo American and Anglo American expressly disclaims any responsibility for, or liability in respect of, such information.

©Anglo American Services (UK) Ltd 2025.  TM and  TM are trade marks of Anglo American Services (UK) Ltd.

Legal Entity Identifier: 549300S9XF92D1X8ME43

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLPPUCCCUPAPGW