Lumina Gold Provides a Cangrejos Project Update
Work on the FS is progressing on schedule and to plan. Ausenco, the consultant working group and the teams conducting field work at Cangrejos have been achieving the milestones required to have the FS finalized in Q2 2025. Accomplishments and recommendations from the ongoing work and trade-off studies include:
- increasing the initial processing plant throughput to 40,000 tonnes per day, compared to 30,000 tonnes per day planned for in the 2023 Pre-feasibility Study, thus simplifying construction and future expansions, and bringing forward gold and copper production;
- resequencing the mine plan to mine out the higher grade Cangrejos deposit first, before commencing mining at Gran Bestia;
- placing over 300 million tonnes of waste rock into the Cangrejos pit once mining is complete, significantly reducing the required land area for the waste rock storage facility and reducing the haul distances to move the waste rock;
- relocating the waste rock storage facility to land already owned by Lumina, which has the additional benefit of increasing the distance between the Project and the nearest communities; and,
- rerouting access roads to avoid local population centers.
Field crews are currently digging test pits and two drill rigs will be at site in late May drilling geotechnical boreholes to support facility siting.
In the second half of 2023, the Company formally requested to start the pre-contractual negotiation of the terms for the Mining Exploitation Contract with the Government of
In
In addition to the
Lumina also plans to execute a CIPA in the second half of 2024, which will commit Lumina to investing a total of
Lumina expects to finalize the site infrastructure layout for the Project by the end of
Qualified Persons
Follow us on: Twitter, Linkedin or Facebook.
Further details are available on the Company's website at https://luminagold.com/. To receive future news releases please sign up at https://luminagold.com/contact.
Signed: "Marshall Koval"
Neither the
Certain statements and information herein, including all statements that are not historical facts, contain forward-looking statements and forward-looking information within the meaning of applicable securities laws. Such forward-looking statements or information include but are not limited to statements or information with respect to: the timing and signing of the EIPA extension and the increase in the protected investment amount to
With respect to forward-looking statements and information contained herein, the Company has made numerous assumptions including among other things, assumptions about general business and economic conditions, the prices of gold and copper, and anticipated costs and expenditures. The foregoing list of assumptions is not exhaustive.
Although management of the Company believes that the assumptions made and the expectations represented by such statements or information are reasonable, there can be no assurance that a forward-looking statement or information herein will prove to be accurate. Forward-looking statements and information by their nature are based on assumptions and involve known and unknown risks, uncertainties and other factors which may cause the Company's actual results, performance or achievements, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information. These factors include, but are not limited to: risks associated with the business of the Company; business and economic conditions in the mining industry generally; the supply and demand for labour and other project inputs; changes in commodity prices; changes in interest and currency exchange rates; risks relating to inaccurate geological and engineering assumptions (including with respect to the tonnage, grade and recoverability of reserves and resources); risks relating to unanticipated operational difficulties (including failure of equipment or processes to operate in accordance with specifications or expectations, cost escalation, unavailability of materials and equipment, government action or delays in the receipt of government approvals, industrial disturbances or other job action, and unanticipated events related to health, safety and environmental matters); risks relating to adverse weather conditions; political risk and social unrest; changes in general economic conditions or conditions in the financial markets; and other risk factors as detailed from time to time in the Company's continuous disclosure documents filed with Canadian securities administrators. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.
View original content to download multimedia:https://www.prnewswire.com/news-releases/lumina-gold-provides-a-cangrejos-project-update-302150478.html
SOURCE