Riot Announces August 2024 Production and Operations Updates
Riot Produces 322 Bitcoin in
Bitcoin Production and Operations Updates for
|
|
|||||||
|
|
|
|
|
|
Comparison (%) |
|
|
Metric |
|
|
|
|
|
Month/Month |
Year/Year |
|
Bitcoin Produced |
|
322 |
370 |
333 |
|
-13 % |
-3 % |
|
Average Bitcoin Produced per Day |
10.4 |
11.9 |
10.8 |
|
-13 % |
-3 % |
|
|
Bitcoin Held 2 |
|
10,019 |
9,704 |
7,309 |
|
3 % |
37 % |
|
Bitcoin Sold |
|
- |
- |
300 |
|
N/A |
N/A |
|
Bitcoin Sales - Net Proceeds |
|
- |
- |
|
|
N/A |
N/A |
|
Average |
N/A |
N/A |
|
|
N/A |
N/A |
|
|
Deployed |
14.7 EH/s |
14.7 EH/s |
10.3 EH/s 2 |
|
0 % |
42 % |
|
|
Deployed |
7.6 EH/s |
7.6 EH/s |
- |
|
0 % |
N/A |
|
|
Deployed |
1.2 EH/s |
1.0 EH/s |
N/A |
|
20 % |
N/A |
|
|
Deployed |
|
23.5 EH/s |
23.2 EH/s |
10.3 EH/s |
|
1 % |
128 % |
|
Avg. Operating |
|
8.2 EH/s |
9.6 EH/s |
4.5 EH/s |
|
-14 % |
84 % |
|
Avg. Operating |
5.2 EH/s |
5.7 EH/s |
- |
|
-9 % |
N/A |
|
|
Avg. Operating |
1.0 EH/s |
0.9 EH/s 5 |
N/A |
|
16 % |
N/A |
|
|
Avg. Operating |
14.5 EH/s |
15.5 EH/s |
4.5 EH/s |
|
-7 % |
224 % |
|
|
Power Credits 6 |
|
|
|
|
79 % |
-76 % |
|
|
Demand Response Credits 7 |
|
|
|
|
261 % |
-86 % |
|
|
Total Power Credits |
|
|
|
|
90 % |
-78 % |
|
|
All-in Power Cost - Rockdale 8 |
2.0c/kWh |
3.0c/kWh |
(15.8)c/kWh |
|
-17 % |
N/M |
|
|
All-in Power Cost - Corsicana 8 |
3.9c/kWh |
3.9c/kWh |
N/A |
|
1 % |
N/A |
|
|
All-in Power Cost - |
3.7c/kWh |
3.6c/kWh 10 |
N/A |
|
4 % |
N/A |
|
|
All-in Power Cost - Total 8 |
2.6c/kWh |
3.2c/kWh |
(15.8)c/kWh |
|
-14 % |
N/M |
|
|
|
|
|||||||
|
|
"August is historically the hottest month of the year in
"In addition to periods of curtailment due to our participation in demand response programs, uptime was impacted during the month by high temperatures in
"We have made significant progress towards completing the development of our third 100 MW building at the Corsicana Facility,
Riot's Power Strategy Overview
Riot's power strategy is based on being a flexible consumer of power. The Company typically consumes power when it is low-cost and abundant, as opposed to residential consumers, who typically increase power usage during peak periods of demand. When demand increases and/or supply decreases, causing prices to rise, the Company can either power down to reduce power costs, or bid competitively to provide the grid operator with visibility into, and control over, Riot's power utilization. This control gives the grid operator the ability to either absorb excess power when supply is high or to curtail Riot's operations in order to reduce demand when beneficial to the grid, and ultimately, to all consumers.
During August, Riot continued its participation in
Infrastructure Update
Riot is currently developing Phase 1 (400 MW) of the Company's Corsicana Facility, which, once fully developed, is expected to total 1 gigawatt (1,000 MW) in developed mining capacity.
Riot continued development of the third 100 MW building,
Estimated Hash Rate Growth
Investor Events
-
H.C. Wainwright 26th AnnualGlobal Investment Conference September 9-11 th inNew York City .
Human Resources Update
Riot is currently recruiting for positions across the Company. Join our team in building, expanding, and securing the Bitcoin network.
Open positions are available at: https://www.riotplatforms.com/careers.
About
Riot's (NASDAQ: RIOT) vision is to be the world's leading Bitcoin-driven infrastructure platform. Our mission is to positively impact the sectors, networks, and communities that we touch. We believe that the combination of an innovative spirit and strong community partnership allows the Company to achieve best-in-class execution and create successful outcomes.
Riot is a Bitcoin mining and digital infrastructure company focused on a vertically integrated strategy. The Company has Bitcoin mining operations in central
For more information, visit www.riotplatforms.com.
Safe Harbor
Statements in this press release that are not historical facts are forward-looking statements that reflect management's current expectations, assumptions, and estimates of future performance and economic conditions. Such statements rely on the safe harbor provisions of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. Because such statements are subject to risks and uncertainties, actual results may differ materially from those expressed or implied by such forward-looking statements. Words such as "anticipates," "believes," "plans," "expects," "intends," "will," "potential," "hope," and similar expressions are intended to identify forward-looking statements. These forward-looking statements may include, but are not limited to, statements about the benefits of acquisitions, including financial and operating results, and the Company's plans, objectives, expectations, and intentions. Among the risks and uncertainties that could cause actual results to differ from those expressed in forward-looking statements include, but are not limited to: unaudited estimates of Bitcoin production; our future hash rate growth (EH/s); the anticipated benefits, construction schedule, and costs associated with the development of our mining facilities in
Investor Contact:
303-794-2000 ext. 110
IR@Riot.Inc
Media Contact:
303-794-2000 ext. 118
PR@Riot.Inc
View original content to download multimedia:https://www.prnewswire.com/news-releases/riot-announces-august-2024-production-and-operations-updates-302238883.html
SOURCE