POWER METALS INTERCEPTS UP TO 22.58% CESIUM NEAR SURFACE AND PLANS AN IMMEDIATE 2,500 METERS OF ADDITIONAL DRILLING
WEST JOE HIGHLIGHTS:
- PWM-24-207: 8.65 m at 1.60% Li2O, 5.74% Cs₂O and 378 ppm Ta from 16.35m
- Including 3.0m @ 1.67 % Li2O, 15.86% Cs₂O and 119 ppm Ta from 18.35m
- Including 1.0m @ 1.72 % Li2O, 22.58% Cs₂O and 130 ppm Ta from 18.35m
- PWM-24-208: 7.02 m at 1.25% Li2O,1.77% Cs₂O and 355 ppm Ta from 16.38m
- Including 3.0m @ 0.77% Li2O, 3.98% Cs₂O and 457 ppm Ta from 19.00m
- PWM-24-209: 5.71m at 1.19% Li2O,1.42% Cs₂O and 287 ppm Ta from 20.07m
- Including 2.5m @ 1.37 % Li2O, 3.18% Cs₂O and 456 ppm Ta from 22.50m
The Phase II 2024 drill program at CLP was designed to delineate and expand on known cesium mineralization with drilling that targeted
Drill core from PWM-24-207 displays a high level of fractionation with strong pollucite mineralization of 10.10% to 22.58% Cs2O in individual samples. PWM-24-207 has also displayed the continuation of the mineralized zone from previously drilled PWM-24-191 (Figure 2) with high-grade pollucite. Similar styles of fractionation and pollucite mineralization are present in PWM-24-208 and PWM-24-209 with grades that ranging from 1.35% to 7.51% Cs2O was intersected in drillholes.
Haydn Daxter,
DRILLING
The Company has completed a total of twenty-four (24) exploration diamond drillholes for 2,474 meters. A further five (5) metallurgical diamond drillholes have also been completed for 150 meters at the end of the program. In total twenty-nine (29) diamond drillholes for 2,620 meters have been completed for the drill program that was concluded ahead of schedule for the Phase II program. Assay results shall continue through until mid-November.
The Company has also commenced planning to advance an additional drill program (Phase III), that shall commence in the coming weeks at the CLP. The Company is incredibly buoyant after a very successful Phase II drilling program and with the increased levels of interest from global cesium chemical specialists over the past three months we will look to commence Phase III. The program will target drilling 2,500 meters of diamond drilling once remaining assay results have been received from the currently completed program at CLP.
CANADIAN GOVERNEMENT
Further to the Company recently receiving approval for the Ontario Junior Exploration Program ("OJEP") grant from the Ontario Government we also have a current application for the
In addition to both the OJEP and
CESIUM DEPOSITS
Globally only 3 high-grade cesium resources have been mined to date with Tanco in
Table 1 – Drill Collar Table
Hole ID |
Easting |
Northing |
Elevation |
Hole Depth (m) |
Dip |
Azimuth NAD83 |
From (m) |
To (m) |
Significant Intersections |
|||
NAD83 |
NAD83 |
MASL |
Interval (m) |
Cs2O (%) |
Li2O % |
Ta (ppm) |
||||||
West Joe |
||||||||||||
PWM-24-207 |
576312 |
5431119 |
344 |
71 |
-45 |
170 |
16.35 |
25 |
8.65 |
5.74 |
1.60 |
378 |
including 3.0m @ 15.86 % Cs2O, 1.67 % Li2O, & 119 ppm Ta from 18.35m including 1.0m @22.58% Cs2O, 1.72 % Li2O, & 130 ppm Ta from 18.35m |
||||||||||||
PWM-24-208 |
576306 |
5431120 |
344 |
71 |
-45 |
170 |
16.38 |
23.4 |
7.02 |
1.77 |
1.25 |
355 |
including 3.0m @ 3.98 % Cs2O, 0.7 % Li2O, & 457 ppm Ta from 19.0m |
||||||||||||
PWM-24-209 |
576308 |
5431125 |
344 |
71 |
-45 |
170 |
20.07 |
25.78 |
5.71 |
1.42 |
1.19 |
287 |
including 2.5m @ 3.18 % Cs2O, 1.37 % Li2O, & 456 ppm Ta from 22.5m |
||||||||||||
PWM-24-210 |
576301 |
5431115 |
344 |
71 |
-45 |
170 |
awaiting assay results |
|||||
PWM-24-211 |
576319 |
5431122 |
350 |
74 |
-45 |
170 |
awaiting assay results |
|||||
PWM-24-212 |
576325 |
5431128 |
349 |
71 |
-45 |
170 |
awaiting assay results |
|||||
PWM-24-213 |
576329 |
5431124 |
348 |
90 |
-45 |
170 |
awaiting assay results |
|||||
PWM-24-214 |
576285 |
5431136 |
348 |
90 |
-45 |
170 |
awaiting assay results |
|||||
PWM-24-215 |
576277 |
5431130 |
349 |
81 |
-45 |
170 |
awaiting assay results |
|||||
PWM-24-216 |
576273 |
5431160 |
345 |
72 |
-45 |
170 |
awaiting assay results |
|||||
PWM-24-217 |
576316 |
5431115 |
350 |
71 |
-45 |
170 |
awaiting assay results |
|||||
PWM-24-218 |
576316 |
5431143 |
345 |
83 |
-51 |
170 |
awaiting assay results |
|||||
PWM-24-219 |
576339 |
5431161 |
339 |
81 |
-45 |
170 |
awaiting assay results |
|||||
PWM-24-220 |
576337 |
5431124 |
344 |
62 |
-45 |
170 |
awaiting assay results |
|||||
PWM-24-221 |
576321 |
5431116 |
349 |
71 |
-45 |
170 |
awaiting assay results |
|||||
PWM-24-222* |
576302 |
5431120 |
345 |
30 |
-45 |
170 |
awaiting assay results |
|||||
PWM-24-223* |
576316 |
5431114 |
346 |
30 |
-45 |
170 |
awaiting assay results |
|||||
PWM-24-224* |
576309 |
5431125 |
344 |
30 |
-45 |
170 |
awaiting assay results |
|||||
PWM-24-225* |
576311 |
5431106 |
34 |
30 |
-56 |
170 |
awaiting assay results |
|||||
PWM-24-226 |
576440 |
5431204 |
338 |
199 |
-45 |
170 |
awaiting assay results |
|||||
PWM-24-227* |
576317 |
5431115 |
345 |
30 |
-45 |
170 |
awaiting assay results |
|||||
PWM-24-228 |
576502 |
5431365 |
342 |
252 |
-45 |
170 |
awaiting assay results |
|||||
PWM-24-229 |
576617 |
5431200 |
341 |
252 |
-45 |
170 |
awaiting assay results |
|||||
|
||||||||||||
PWM-24-230 |
578217 |
5431598 |
353 |
122 |
-45 |
147 |
awaiting assay results |
|||||
PWM-24-231 |
578283 |
5431651 |
350 |
111 |
-45 |
147 |
awaiting assay results |
|||||
PWM-24-232 |
578305 |
5431659 |
347 |
71 |
-50 |
147 |
awaiting assay results |
|||||
PWM-24-233 |
578329 |
5431716 |
344 |
150 |
-45 |
150 |
awaiting assay results |
|||||
PWM-24-234 |
578145 |
5431515 |
352 |
111 |
-45 |
150 |
awaiting assay results |
|||||
PWM-24-235 |
578273 |
5431638 |
355 |
72 |
-45 |
147 |
awaiting assay results |
* 2024 Phase II HQ holes for metallurgical testing |
Case
The Case
Pelletier Property
The Pelletier Property is located 50km south of
Decelles Property
The Decelles Property contains 669 claims, covering 38,404 hectares of LCT prospective ground near the mining centers of Val-dÓr and
Mazerac Property
The Mazerac Property is located approximately 30 km east of
Pollucite and Cesium
Pollucite is a rare mineral that hosts high grade cesium and is associated with highly fractionated, rare element pegmatites. The main source of cesium known globally is pollucite (Cs,Na)₂(Al₂Si₄O₁₂)•2H₂O, (https://www.gov.mb.ca/iem/geo/industrial/pollucite.html). Currently the Tanco mine in
Scientific and Technical Disclosure
The scientific and technical disclosure included in this news release has been reviewed and approved by
ON BEHALF OF THE BOARD
Neither the
No securities regulatory authority has either approved or disapproved of the contents of this news release. The securities being offered have not been, and will not be, registered under the United States Securities Act of 1933, as amended (the "
Cautionary Note Regarding Forward-Looking Information
This press release contains forward-looking information based on current expectations, including the use of funds raised under the Offering. These statements should not be read as guarantees of future performance or results. Such statements involve known and unknown risks, uncertainties and other factors that may cause actual results, performance or achievements to be materially different from those implied by such statements. Although such statements are based on management's reasonable assumptions,
Although the Company believes that the expectations and assumptions on which the forward-looking statements are based are reasonable, undue reliance should not be placed on the forward-looking statements because the Company can give no assurance that they will prove to be correct. Since forward-looking statements address future events and conditions, by their very nature they involve inherent risks and uncertainties. These statements speak only as of the date of this press release. Actual results could differ materially from those currently anticipated due to several factors and risks including various risk factors discussed in the Company's disclosure documents which can be found under the Company's profile onwww.sedar.com.
This press release contains "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E the Securities Exchange Act of 1934, as amended and such forward-looking statements are made pursuant to the safe harbor provisions of the Private Securities Litigation Reform Act of 1995. The TSXV has neither reviewed nor approved the contents of this press release.
SOURCE