1911 Gold Intersects up to 21.80 g/t Gold over 0.50 m within 6.46 g/t Au over 2.20 m in Drilling at True North
Highlights:
- Drill results defined near-surface quartz vein hosted gold ("Au") mineralization on the San Antonio Southeast ("SAM SE") target
- A second drill rig has been mobilized and is currently drill testing the extensions of the San Antonio West target
San Antonio Southeast Target
-
Drill results confirmed the southeastern extension of gold mineralization hosted within the prolific
San Antonio mafic unit to depths of over 400 m and along a strike length of over 300 m, including:
-
- Drill hole TN-25-011 intersected 8.37 grams per tonne ("g/t") Au over 0.84 m at a down-hole depth of 277.74 m
- Drill hole TN-25-014 intersected 13.40 g/t Au over 0.69 m at a down-hole depth of 361.71 m
- Drill hole TN-25-021 intersected 14.00 g/t over 0.50 m at a downhole depth of 33.10 m, and 6.46 g/t Au over 2.20 m at a downhole depth of 60.10m, including 21.80 g/t Au over 0.50 m
- Drill hole TN-25-023 intersected 9.37 g/t Au over 0.50 m at a downhole depth of 37.00 m
- Drill hole TN-25-024 intersected 4.55 g/t Au over 1.00 m at a downhole depth of 73.00 m, and 14.50 g/t Au over 0.50 m at a downhole depth of 106.60 m
San Antonio Southeast target: Discussion of Results
The San Antonio Southeast target covers an area southeast of the historically mined
Table 1: Select Significant Drill Hole Assay Results
Target Area (name) |
Drill Hole (number) |
From (m) |
To (m) |
Interval (m) |
Au (g/t) |
SAM Southeast |
TN-24-011 |
244.76 |
245.72 |
0.96 |
2.55 |
|
|
277.74 |
278.58 |
0.84 |
8.37 |
SAM Southeast |
TN-24-14 |
361.71 |
362.40 |
0.69 |
13.40 |
|
|
369.85 |
371.70 |
1.85 |
2.52 |
SAM Southeast |
TN-25-016 |
332.60 |
334.20 |
1.60 |
2.72 |
SAM Southeast |
TN-25-021 |
33.10 |
33.60 |
0.50 |
14.00 |
|
|
51.60 |
57.20 |
5.60 |
2.52 |
|
Including |
51.60 |
53.00 |
1.40 |
5.13 |
|
|
60.10 |
62.30 |
2.20 |
6.46 |
|
Including |
61.80 |
62.30 |
0.50 |
21.80 |
SAM Southeast |
TN-25-022 |
51.30 |
51.80 |
0.50 |
6.00 |
|
|
60.50 |
62.60 |
2.10 |
2.32 |
SAM Southeast |
TN-25-023 |
37.00 |
37.50 |
0.50 |
9.37 |
|
|
41.30 |
42.20 |
0.90 |
2.41 |
SAM Southeast |
TN-25-024 |
73.00 |
74.00 |
1.00 |
4.55 |
|
|
106.60 |
107.10 |
0.50 |
14.50 |
1) Intercepts above a cut-off grade of 2.25 g/t Au |
2) Maximum of 2.50 m internal dilution and no top capping applied |
3) Intervals represent drill core length and are considered to represent 60% to 90% of true widths |
4) Full Significant Assay Results included in Table 2 |
5) Drill hole Information included in Table 3 |
Drilling completed to date has confirmed the extension of gold mineralization to over 350 m east of the
Mineralized intercepts are characterized by quartz-carbonate shear veins and vein breccias with sericite, and chlorite alteration and up to 2% pyrite disseminated and in veinlets. They are interpreted to be related to a similar structural setting as the
Next Steps
The exploration drilling results completed to date within the
Table 2: True North; Significant Drill Hole Assays
Target Area
( |
Drill Hole (Number) |
From (m) |
To (m) |
Interval (m) |
Au (g/t) |
SAM Southeast |
TN-24-011 |
244.76 |
245.72 |
0.96 |
2.55 |
|
|
257.76 |
260.00 |
2.24 |
0.97 |
|
|
263.00 |
264.50 |
1.50 |
1.64 |
|
|
277.74 |
278.58 |
0.84 |
8.37 |
SAM Southeast |
TN-24-14 |
359.40 |
359.90 |
0.50 |
1.65 |
|
|
361.71 |
362.40 |
0.69 |
13.40 |
|
|
363.90 |
365.22 |
1.32 |
0.67 |
|
|
367.10 |
369.85 |
2.75 |
1.36 |
|
|
369.85 |
371.70 |
1.85 |
2.52 |
|
|
371.70 |
375.55 |
3.85 |
0.80 |
|
|
385.95 |
386.55 |
0.60 |
1.91 |
SAM Southeast |
TN-24-15 |
347.57 |
348.07 |
0.50 |
0.74 |
|
|
371.95 |
372.51 |
0.56 |
1.83 |
|
|
385.55 |
386.55 |
1.00 |
1.70 |
SAM Southeast |
TN-25-016 |
332.60 |
334.20 |
1.60 |
2.72 |
|
|
350.00 |
351.30 |
1.30 |
0.85 |
|
|
369.50 |
370.25 |
0.75 |
1.28 |
SAM Southeast |
TN-25-017 |
212.40 |
213.00 |
0.60 |
0.80 |
SAM Southeast |
TN-25-021 |
33.10 |
33.60 |
0.50 |
14.00 |
|
|
50.20 |
51.60 |
1.40 |
0.51 |
|
|
51.60 |
57.20 |
5.60 |
2.52 |
|
Including |
51.60 |
53.00 |
1.40 |
5.13 |
|
|
57.20 |
58.00 |
0.80 |
0.73 |
|
|
60.10 |
62.30 |
2.20 |
6.46 |
|
Including |
61.80 |
62.30 |
0.50 |
21.80 |
|
|
62.30 |
62.80 |
0.50 |
1.59 |
SAM Southeast |
TN-25-022 |
34.20 |
35.40 |
1.20 |
1.21 |
|
|
47.30 |
48.50 |
1.20 |
1.46 |
|
|
51.30 |
51.80 |
0.50 |
6.00 |
|
|
58.90 |
59.40 |
0.50 |
1.95 |
|
|
60.50 |
62.60 |
2.10 |
2.32 |
SAM Southeast |
TN-25-023 |
32.90 |
33.50 |
0.60 |
0.57 |
|
|
36.00 |
37.00 |
1.00 |
0.83 |
|
|
37.00 |
37.50 |
0.50 |
9.37 |
|
|
37.50 |
38.00 |
0.50 |
0.73 |
|
|
41.30 |
42.20 |
0.90 |
2.41 |
|
|
70.40 |
73.00 |
2.60 |
0.62 |
|
|
73.00 |
74.00 |
1.00 |
4.55 |
|
|
75.00 |
76.00 |
1.00 |
1.41 |
|
|
78.30 |
78.90 |
0.60 |
1.07 |
|
|
102.90 |
103.40 |
0.50 |
0.51 |
|
|
106.10 |
106.60 |
0.50 |
0.60 |
|
|
106.60 |
107.10 |
0.50 |
14.50 |
|
|
110.90 |
113.00 |
2.10 |
1.16 |
Drill hole TN-24-012 was abandoned before reaching target depths and drill hole TN-25-026 was drilled behind the target zone |
Update on Underground Access
During February, significant progress has been made in recommissioning the A Shaft on the True North underground mine, including lowering the skip to the "16 Level" (the target level for underground drilling) with no interruptions. Once the Company can safely lower a crew to the "16 Level" over the coming weeks, a further inspection will be completed to identify the work required and provide an updated timeline for the exploration team to gain access for underground drilling.
Table 3: True North; Drill Hole Details
Drill Hole |
`Target
( |
Northing* |
Easting* |
Elevation |
Azimuth |
Inclination |
Depth |
|
TN-24-011 |
SAM-Southeast |
312762 |
5655528 |
250 |
175 |
-65 |
326.0 |
|
TN-24-012** |
SAM-Southeast |
312762 |
5655528 |
250 |
183 |
-48 |
45.4 |
|
TN-24-012A |
SAM Southeast |
312762 |
5655528 |
250 |
165 |
-50 |
224.0 |
|
TN-24-013 |
SAM Southeast |
312588 |
5655595 |
256 |
152 |
-65 |
338.0 |
|
TN-24-014 |
SAM Southeast |
312662 |
5655639 |
262 |
137 |
-63 |
443.0 |
|
TN-25-015 |
SAM Southeast |
312662 |
5655639 |
262 |
137 |
-66 |
440.0 |
|
TN-25-016 |
SAM Southeast |
312664 |
5655639 |
262 |
125 |
-64 |
449.0 |
|
TN-25-017 |
SAM Southeast |
312793 |
5655442 |
254 |
187 |
-60 |
293.0 |
|
TN-25-021 |
SAM Southeast |
312609 |
5655311 |
251 |
129 |
-82 |
140.0 |
|
TN-25-022 |
SAM Southeast |
312609 |
5655311 |
251 |
218 |
-45 |
101.0 |
|
TN-25-023 |
SAM Southeast |
312609 |
5655311 |
251 |
273 |
-50 |
128.0 |
|
TN-25-024 |
SAM Southeast |
312609 |
5655311 |
251 |
122 |
-49 |
194.0 |
|
TN-25-026*** |
SAM Southeast |
312555 |
5655327 |
252 |
232 |
-45 |
101.0 |
|
|
|
|
|
|
|
|
|
|
*Coordinates are provided in |
**Drill hole abandoned before reaching target depth |
***Drill hole drilled behind the target zone |
Quality Assurance/Quality Controls (QA/QC)
Core samples are collected by sawing the drill core in half along the axis, with one-half sampled, placed in plastic sample bags, labelled, sealed and the other half retained for future reference. Batches are shipped to
Qualified Person Statement
The scientific and technical information in this news release has been reviewed and approved by Mr.
About
ON BEHALF OF THE BOARD OF DIRECTORS
President and CEO
CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION
This news release may contain forward-looking statements. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or describes a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved.
All forward-looking statements reflect the Company's beliefs and assumptions based on information available at the time the statements were made. Actual results or events may differ from those predicted in these forward-looking statements. All of the Company's forward-looking statements are qualified by the assumptions that are stated or inherent in such forward-looking statements, including the assumptions listed below. Although the Company believes that these assumptions are reasonable, this list is not exhaustive of factors that may affect any of the forward-looking statements.
Forward-looking statements involve known and unknown risks, future events, conditions, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, prediction, projection, forecast, performance or achievements expressed or implied by the forward-looking statements. All statements that address expectations or projections about the future, including, but not limited to, statements with respect to the terms of the Offering, the use of proceeds of the Offering, the timing and ability of the Company to close the Offering, the timing and ability of the Company to receive necessary regulatory approvals, the tax treatment of the securities issued under the Offering, the timing for the Qualifying Expenditures to be renounced in favour of the subscribers, and the plans, operations and prospects of the Company, are forward-looking statements. Although
All forward-looking statements contained in this news release are given as of the date hereof. The Company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except in accordance with applicable securities laws.
Neither
SOURCE