1911 Gold Intersects up to 14.97 g/t Gold over 2.70 m including 71.60 g/t Au over 0.50 m on SAM Southeast Zone at True North
Highlights:
- Drilling has continued to expand the near-surface quartz vein hosted gold ("Au") mineralization on the recently discovered San Antonio Southeast ("SAM SE") target
-
Drilling is continuing on the SAM SE and SAM West targets as well as new, near-surface gold targets identified by the
1911 Gold geology team within the True North mine footprint
San Antonio Southeast Target
-
Drill results confirmed the southeastern extension of gold mineralization within the prolific
San Antonio mafic unit to depths of over 400 m and along strike for over 500 m, including:- TN-25-034: Intersected 7.13 grams per tonne (g/t) Au over 2.10 m at a downhole depth of 99.00 m including 12.80 g/t Au over 1.00 m, 7.67 g/t Au over 1.00 m at a downhole depth of 139.70 m, and 14.97 g/t Au over 2.70 m at a downhole depth of 145.00 m including 71.60 g/t Au over 0.50 m
- TN-25-033A: Intersected 7.71 g/t Au over 1.80 m at a downhole depth of 94.00 m, 7.05 g/t Au over 3.10 m at a downhole depth of 102.00 m including 16.50 g/t Au over 1.20 m, and 5.34 g/t Au over 6.00 m at a downhole depth of 121.50 m including 7.32 g/t Au over 1.20 m and 8.58 g/t Au over 1.10 m
- TN-25-027: Intersected 18.80 g/t Au over 0.70 m at a down-hole depth of 27.90 m extending mineralization over a strike length of 50 m to the east of hole TN-24-023
- TN-25-019: Intersected 13.20 g/t Au over 0.50 m at a down-hole depth of 253.00 m, extending mineralization over 125 m to the east of hole TN-24-011
- TN-25-027: Intersected 18.80 g/t Au over 0.70 m at a down-hole depth of 27.90 m, extending mineralization over an additional strike length of 50 m from TN-24-023
- TN-25-028: Intersected 8.36 g/t Au over 0.80 m at a downhole depth of 48.80 m, a 50 m down plunge extension of hole TN-24-027
- TN-25-030: Intersected 8.78 g/t Au over 0.80 m at a downhole depth of 165.30 m, an 80 m down plunge extension from hole TN-24-021
San Antonio Southeast target: Discussion of Results
Drilling completed to date has confirmed the extensions of gold mineralization within the SAM gabbro to over 500 m southeast of the historically mined
The latest drill holes extended the footprint of mineralization another 200 m to the southeast. The drilling completed to date on the SAM SE target confirmed the presence of a vein system parallel to the
Table 1: Select Significant Drill Hole Assay Results
Target Area (name) |
Drill Hole (number) |
From |
To |
Interval (m) |
Au (g/t) |
SAM Southeast |
TN-25-019 |
253.00 |
253.50 |
0.50 |
13.20 |
SAM Southeast |
TN-25-027 |
27.90 |
28.60 |
0.70 |
18.80 |
SAM Southeast |
TN-25-028 |
46.90 |
51.30 |
4.40 |
3.12 |
|
Including |
46.90 |
49.60 |
2.70 |
4.20 |
|
and |
48.80 |
49.60 |
0.80 |
8.36 |
SAM Southeast |
TN-25-030 |
154.30 |
155.30 |
1.00 |
3.53 |
|
|
162.40 |
166.10 |
3.70 |
3.27 |
|
Including |
162.40 |
164.30 |
1.90 |
3.79 |
|
and |
165.30 |
166.10 |
0.80 |
8.78 |
|
|
179.00 |
180.00 |
1.00 |
3.16 |
SAM Southeast |
TN-25-033A |
94.00 |
95.80 |
1.80 |
7.71 |
|
|
102.00 |
105.10 |
3.10 |
7.05 |
|
Including |
102.00 |
103.20 |
1.20 |
16.50 |
|
|
119.60 |
125.60 |
6.00 |
5.34 |
|
Including |
121.50 |
122.70 |
1.20 |
7.32 |
|
and |
123.70 |
124.80 |
1.10 |
8.58 |
SAM Southeast |
TN-25-034 |
99.00 |
101.10 |
2.10 |
7.13 |
|
Including |
99.00 |
100.00 |
1.00 |
12.80 |
|
|
136.50 |
140.70 |
4.20 |
2.49 |
|
Including |
139.70 |
140.50 |
1.00 |
7.67 |
|
|
145.00 |
147.70 |
2.70 |
14.97 |
|
Including |
145.00 |
145.50 |
0.50 |
71.60 |
|
|
1) |
Intercepts above a cut-off grade of 2.25 g/t Au |
2) |
Maximum of 2.50 m internal dilution and no top capping applied |
3) |
Intervals represent drill core length and are considered to represent 60% to 90% of true widths |
4) |
Full Significant Assay Results included in Table 2 |
5) |
Drill hole Information included in Table 3 |
San Antonio Southeast Target
The San Antonio Southeast target is located approximately 350m southeast of the historically mined
Next Steps
With the continued intersection of good gold mineralization in step-out drilling of near surface targets at the
Table 3: True North; Drill Hole Details
Drill Hole (Number) |
`Target
( |
Northing* (m) |
Easting* (m) |
Elevation (masl) |
Azimuth (°) |
Inclination (°) |
Depth (m) |
|
TN-25-018 |
SAM-Southeast |
5655444 |
312790 |
252 |
175 |
-45 |
269.0 |
|
TN-25-019 |
SAM-Southeast |
5655444 |
312790 |
252 |
156 |
-45 |
323.0 |
|
TN-25-020 |
SAM Southeast |
5655311 |
312609 |
251 |
156 |
-49 |
131.0 |
|
TN-25-027 |
SAM Southeast |
5655325 |
312562 |
290 |
113 |
-53 |
128.0 |
|
TN-25-028 |
SAM Southeast |
5655416 |
312542 |
258 |
164 |
-58 |
155.0 |
|
TN-25-030 |
SAM Southeast |
5655470 |
312610 |
256 |
163 |
-47 |
230.0 |
|
TN-25-031 |
SAM Southeast |
5655470 |
312610 |
256 |
155 |
-62 |
242.0 |
|
TN-25-033A |
SAM Southeast |
5655466 |
312612 |
256 |
185 |
-45 |
194.0 |
|
|
|
|
|
|
|
|
|
|
* |
Coordinates are provided in |
Qualified Person Statement
The scientific and technical information in this news release has been reviewed and approved by Mr.
Table 2: True North; Significant Drill Hole Assays
Target Area (name) |
Drill Hole (number) |
From |
To |
Interval (m) |
Au (g/t) |
SAM Southeast |
TN-25-019 |
253.00 |
253.50 |
0.50 |
13.20 |
SAM Southeast |
TN-25-020 |
60.10 |
60.80 |
0.70 |
2.37 |
SAM Southeast |
TN-25-027 |
27.90 |
28.60 |
0.70 |
18.80 |
SAM Southeast |
TN-25-028 |
46.90 |
51.30 |
4.40 |
3.12 |
|
Including |
46.90 |
49.60 |
2.70 |
4.20 |
|
and |
48.80 |
49.60 |
0.80 |
8.36 |
SAM Southeast |
TN-25-030 |
152.20 |
153.30 |
1.10 |
1.15 |
|
|
154.30 |
155.30 |
1.00 |
3.53 |
|
|
154.30 |
155.30 |
1.00 |
3.53 |
|
|
162.40 |
166.10 |
3.70 |
3.27 |
|
Including |
162.40 |
164.30 |
1.90 |
3.79 |
|
and |
165.30 |
166.10 |
0.80 |
8.78 |
|
|
179.00 |
180.00 |
1.00 |
3.16 |
SAM Southeast |
TN-25-031 |
138.80 |
141.50 |
2.70 |
1.11 |
|
|
182.20 |
183.20 |
1.00 |
1.03 |
SAM Southeast |
TN-25-033A |
94.00 |
95.80 |
1.80 |
7.71 |
|
|
102.00 |
105.10 |
3.10 |
7.05 |
|
Including |
102.00 |
103.20 |
1.20 |
16.50 |
|
|
107.00 |
108.50 |
1.50 |
1.81 |
|
|
111.50 |
113.00 |
1.50 |
0.93 |
|
|
117.50 |
119.00 |
1.50 |
0.80 |
|
|
119.60 |
125.60 |
6.00 |
5.34 |
|
Including |
121.50 |
122.70 |
1.20 |
7.32 |
|
and |
123.70 |
124.80 |
1.10 |
8.58 |
|
|
179.30 |
180.50 |
1.20 |
1.57 |
SAM Southeast |
TN-25-034 |
82.40 |
84.10 |
1.70 |
1.18 |
|
|
99.00 |
101.10 |
2.10 |
7.13 |
|
Including |
99.00 |
100.00 |
1.00 |
12.80 |
|
|
101.90 |
102.40 |
0.50 |
1.83 |
|
|
105.00 |
105.70 |
0.70 |
1.58 |
|
|
132.20 |
133.60 |
1.40 |
2.25 |
|
|
136.50 |
142.30 |
5.80 |
2.20 |
|
Including |
136.50 |
140.70 |
4.20 |
2.49 |
|
Including |
139.70 |
140.70 |
1.00 |
7.67 |
|
|
145.00 |
147.70 |
2.70 |
14.97 |
|
Including |
145.00 |
145.50 |
0.50 |
71.60 |
Quality Assurance/
Core samples are collected by sawing the drill core in half along the axis, with one-half sampled, placed in plastic sample bags, labelled, sealed and the other half retained for future reference. Batches are shipped to
About
ON BEHALF OF THE BOARD OF DIRECTORS
President and CEO
CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION
This news release may contain forward-looking statements. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or describes a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved.
All forward-looking statements reflect the Company's beliefs and assumptions based on information available at the time the statements were made. Actual results or events may differ from those predicted in these forward-looking statements. All of the Company's forward-looking statements are qualified by the assumptions that are stated or inherent in such forward-looking statements, including the assumptions listed below. Although the Company believes that these assumptions are reasonable, this list is not exhaustive of factors that may affect any of the forward-looking statements.
Forward-looking statements involve known and unknown risks, future events, conditions, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, prediction, projection, forecast, performance or achievements expressed or implied by the forward-looking statements. All statements that address expectations or projections about the future, including, but not limited to, statements with respect to the terms of the Offering, the use of proceeds of the Offering, the timing and ability of the Company to close the Offering, the timing and ability of the Company to receive necessary regulatory approvals, the tax treatment of the securities issued under the Offering, the timing for the Qualifying Expenditures to be renounced in favour of the subscribers, and the plans, operations and prospects of the Company, are forward-looking statements. Although
All forward-looking statements contained in this news release are given as of the date hereof. The Company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except in accordance with applicable securities laws.
Neither
SOURCE