enCore Energy Continues Wellfield Expansion at the Alta Mesa Uranium Project; Announces Senior Vice President of Operations
NASDAQ:EU
TSXV:EU
www.encoreuranium.com
The Alta Mesa CPP and Wellfield expansion highlights include:
- Wellfield development continues to show positive results with a total of 32 wells, 15 extractors and 17 injectors installed and operational with uranium-bearing solution scheduled to be piped to the Alta Mesa CPP by
April 23, 2025 . This current rate of under two days per installed well is the best in the Company's history at the theAlta Mesa Project ; - Installation of PathCAD™ wellfield simulation and design software providing enCore the ability to model wellfield flow for current and future wellfields. PathCAD™ software is proven to provide for improved wellfield management, efficient wellfield planning, operations and optimization of uranium extraction;
- Wellfield 8 ("PAA-8"), planned for uranium extraction following the currently operational Wellfield 7 is now renamed Wellfield 3-Ext ("PAA-3 Extension"). The original plan to develop Wellfield 8 is altered due to new delineation drilling which indicates the uranium mineralization occurs within the same ore horizon and partially within the boundary of the existing monitor well ring of the past-producing Wellfield 3 ("PAA-3"). Modelling Wellfield 3-Ext as an extension of Wellfield 3 is expected to reduce permitting timelines and wellfield installation costs while extending the existing monitor well ring. This approach also provides the ability to capture uranium stranded within the previously operated Wellfield 3;
-
Alta Mesa wellfield optimization training and updated procedures are on-going. The enhanced procedures are positively impacting the productive life of existing wellfields and is expected to enhance future wellfield operations and total uranium capture.
About the Alta Mesa Uranium CPP and Wellfield ("
The Alta Mesa CPP historically produced nearly 5 million lbs. of uranium between 2005 and 2013 when production was curtailed as a result of low prices.
Previously,
A licensed Professional Engineer in
With this transition,
About
Following upon enCore's demonstrated success in
Cautionary Note Regarding Forward Looking Statements:
Neither
This press release contains "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995 and Canadian securities laws that are based on management's current expectations, assumptions and beliefs. Forward-looking statements can often be identified by such words as "will", "expects", "plans", "believes", "intends", "estimates", "projects", "continue", "potential", and similar expressions or variations (including negative variations) of such words and phrases, or statements that certain actions, events or results "may", "could", or "will" be taken.
Forward-looking statements and information that are not statements of historical fact include, but are not limited to, any statements regarding future expectations, beliefs, goals or prospects , the anticipated schedule of wellfield development and uranium-bearing solution piping and expectations for reduced permitting timelines at the renamed PAA-3 Extension All such forward-looking statements are not guarantees of future results and forward-looking statements are subject to important risk factors and uncertainties, many of which are beyond the Company's ability to control or predict, that could cause actual results to differ materially from those expressed in any forward-looking statement. A number of important factors could cause actual results or events to differ materially from those indicated or implied by such forward-looking statements, including, exploration and development risks, changes in commodity prices, access to skilled personnel, the results of exploration and development activities; extraction risks; uninsured risks; regulatory risks; defects in title; the availability of materials and equipment, timeliness of government approvals and unanticipated environmental impacts on operations; litigation risks; risks posed by the economic and political environments in which the Company operates and intends to operate; increased competition; assumptions regarding market trends and the expected demand and desires for the Company's products and proposed products; reliance on industry equipment manufacturers, suppliers and others; the failure to adequately protect intellectual property; the failure to adequately manage future growth; adverse market conditions, the failure to satisfy ongoing regulatory requirements and factors relating to forward looking statements listed above which include risks as disclosed in the Company's filings on SEDAR+ and with the
Forward-looking statements are provided for the purpose of providing information about the current expectations, beliefs and plans of management. Such statements may not be appropriate for other purposes and readers should not place undue reliance on these forward-looking statements, that speak only as of the date hereof, as there can be no assurance that the plans, intentions or expectations upon which they are based will occur. Such information, although considered reasonable by management at the time of preparation, may prove to be incorrect and actual results may differ materially from those anticipated. Forward-looking statements contained in this news release are expressly qualified by this cautionary statement.
View original content to download multimedia:https://www.prnewswire.com/news-releases/encore-energy-continues-wellfield-expansion-at-the-alta-mesa-uranium-project-announces-senior-vice-president-of-operations-302433822.html
SOURCE