1911 Gold Intersects 62.40 g/t Au over 1.00 m on San Antonio West Zone at True North
Highlights:
- Drilling has continued to expand the near-surface quartz vein hosted gold ("Au") mineralization on the new San Antonio West ("SAM West") target
San Antonio West Target
-
Drill results confirmed the western extensions of gold mineralization within the prolific
San Antonio mafic unit of 260 m down dip and 500 m along strike, including:- TN-25-037: Intersected 8.73 grams per tonne (g/t) Au over 1.00 m at a downhole depth of 60.90 m, 62.40 g/t Au over 1.00 m at a downhole depth of 65.10 m, 6.09 g/t Au over 0.70 m at a down hole depth of 86.80 m and 4.17 g/t Au over 4.50 m at a downhole depth of 128.80 m, including 8.45 g/t Au over 0.80 m
- TN-25-035: Intersected 8.81 g/t Au over 2.10 m at a downhole depth of 69.00 m, including 19.20 g/t Au over 0.60 m
- TN-25-045: Intersected 6.84 g/t Au over 3.70 m at a down-hole depth of 7.50 m including 12.40 g/t Au over 1.40 m, and 5.30 g/t Au over 2.70 m at down hole depth of 29.50 m including 11.30 g/t Au over 0.50 m, and 7.69 g/t Au over 0.70 m
- TN-25-043: Intersected 12.50 g/t Au over 1.00 m at a downhole depth of 66.20 m
S
an
Drilling completed to date has confirmed the extensions of gold mineralization within the SAM gabbro to over 600 m west of the historically mined
The latest drill holes extended the footprint of mineralization 100 m to the east towards the main
Drill holes TN-25-035 (2.10 m @ 8.81 g/t Au, including 0.60 m @ 19.20 g/t Au), TN-25-037 (1.00 m @ 62.40 g/t Au), TN-25-045 (3.70 m @ 6.84 g/t Au) and TN-25-048 (1.00 m @ 3.44 g/t Au) tested an area over 100 m to the southeast and 100 m down dip of previously released drill hole TN-24-005 (3.00 m @ 2.45 g/t Au).
Drill hole TN-25-035, designed as a 200 m step-out to the east of drill hole TN-25-006 (4.84 m @ 3.70 g/t Au, including 1.05 m @ 7.23 g/t Au and 0.91 m @ 8.42 g/t Au), intersected 2.10 m @ 8.81 g/t Au including 0.60 m @ 19.20 g/t Au. Drilling successfully extended the gold mineralization to the east as interpreted and returned similar high-grade gold results.
Drill holes TN-25-029 and TN-25-043 (1.00 m @ 12.50 g/t Au) tested the up-dip extensions of the zone above and to the east of previously released holes TN-24-007 and TN-24-006 (4.84 m @ 3.70 g/t Au, including 1.05 m @ 7.23 g/t Au and 0.91 m @ 8.42 g/t Au).
Drilling has confirmed the existence of up to three (3) vein zones hosted within the target gabbro unit, supporting the potential to mine multiple zones on levels as conducted historically. Drill holes TN-25-035, TN-25-037, TN-25-043 and TN-25-045 intersected 3 distinct vein zones hosting high-grade gold mineralization over a vertical distance of over 200 m. TN-25-035 intersected 2.10 m @ 8.81 g/t Au including 0.60 m @ 19.20 g/t Au, TN-25-037 intersected 1.00 m @ 8.73 g/t Au and 1.00 m @ 62.40 g/t Au, 0.70 m @ 6.09 g/t Au and 4.50 m @ 4.17 g/t Au, including 0.80 m @ 8.45 g/t Au. Drill hole TN-25-045, designed as undercut of drill hole TN-25-043 (1.00 m @ 12.50 g/t Au), intersected 3.70 m @ 6.84 g/t Au including 1.40 m @ 12.40 g/t Au, 2.70 m @ 5.30 g/t Au including 0.50 m @ 11.30 g/t Au and 0.70 m @ 7.69 g/t Au.
Drilling on the SAM West target is continuing to test down dip extensions of the defined gold mineralization, including the continuity of the three vein zones, to a depth of 500 m. The Company is continuing to process the drill core, and results of the deeper holes will be released upon receipt of final assays.
Table 1: Significant Drill Hole Assay Results
Target Area (name) |
Drill Hole (number) |
From (m) |
To (m) |
Interval (m) |
Au (g/t) |
SAM West |
TN-25-029 |
71.70 |
72.20 |
0.50 |
3.09 |
SAM West |
TN-25-035 |
53.10 |
53.60 |
0.50 |
3.30 |
|
|
69.00 |
71.10 |
2.10 |
8.81 |
|
Including |
70.50 |
71.10 |
0.60 |
19.20 |
SAM West |
TN-25-037 |
60.90 |
61.90 |
1.00 |
8.73 |
|
|
65.10 |
66.10 |
1.00 |
62.40 |
|
|
86.80 |
87.50 |
0.70 |
6.09 |
|
|
128.80 |
133.30 |
4.50 |
4.17 |
|
Including |
128.80 |
129.60 |
0.80 |
8.45 |
SAM West |
TN-25-043 |
66.20 |
67.20 |
1.00 |
12.50 |
SAM West |
TN-25-045 |
7.50 |
11.20 |
3.70 |
6.84 |
|
Including |
8.30 |
9.70 |
1.40 |
12.40 |
|
|
29.50 |
32.20 |
2.70 |
5.30 |
|
Including |
29.50 |
30.00 |
0.50 |
11.30 |
|
and |
31.50 |
32.20 |
0.70 |
7.69 |
SAM West |
TN-25-048 |
31.90 |
32.90 |
1.00 |
3.44 |
1) |
Intercepts above a cut-off grade of 2.25 g/t Au |
2) |
Maximum of 2.50 m internal dilution and no top capping applied |
3) |
Intervals represent drill core length and are considered to represent 60% to 90% of true widths |
4) |
Full Significant Assay Results included in Table 2 |
5) |
Drill hole Information included in Table 3 |
San Antonio West Target
The San Antonio West target is approximately 300 m west of the historically mined
Next Steps
With the continued intersection of good gold mineralization in step-out drilling of near surface targets at the
Table 2: True North; Select Drill Hole Assays
Target Area (name) |
Drill Hole (number) |
From (m) |
To (m) |
Interval (m) |
Au* (g/t) |
SAM West |
TN-25-025 |
No Significant Results |
|||
SAM West |
TN-25-029 |
71.70 |
72.20 |
0.50 |
3.09 |
SAM West |
TN-25-032 |
167.80 |
168.70 |
0.90 |
1.20 |
|
|
177.40 |
178.30 |
0.90 |
0.71 |
SAM West |
TN-25-035 |
53.10 |
53.60 |
0.50 |
3.30 |
|
|
69.00 |
71.10 |
2.10 |
8.81 |
|
Including |
70.50 |
71.10 |
0.60 |
19.20 |
|
|
132.10 |
132.60 |
0.50 |
1.42 |
|
|
156.80 |
158.30 |
1.50 |
1.64 |
SAM West |
TN-25-037 |
60.90 |
61.90 |
1.00 |
8.73 |
|
|
64.10 |
65.10 |
1.00 |
1.78 |
|
|
65.10 |
66.10 |
1.00 |
62.40 |
|
|
86.80 |
87.50 |
0.70 |
6.09 |
|
|
127.80 |
128.80 |
1.00 |
1.43 |
|
|
128.80 |
133.30 |
4.50 |
4.17 |
|
Including |
128.80 |
129.60 |
0.80 |
8.45 |
|
|
204.70 |
206.10 |
1.40 |
0.83 |
SAM West |
TN-25-043 |
5.70 |
6.50 |
0.80 |
1.18 |
|
|
10.10 |
11.30 |
1.20 |
0.74 |
|
|
13.00 |
13.50 |
0.50 |
1.03 |
|
|
66.20 |
67.20 |
1.00 |
12.50 |
|
|
69.70 |
70.20 |
0.50 |
1.33 |
|
|
73.30 |
77.00 |
3.70 |
0.65 |
|
|
81.40 |
83.30 |
1.90 |
0.53 |
SAM West |
TN-25-045 |
5.50 |
7.50 |
2.00 |
0.89 |
|
|
7.50 |
11.20 |
3.70 |
6.84 |
|
Including |
8.30 |
9.70 |
1.40 |
12.40 |
|
|
11.20 |
12.80 |
1.60 |
0.68 |
|
|
29.50 |
32.20 |
2.70 |
5.30 |
|
Including |
29.50 |
30.00 |
0.50 |
11.30 |
|
and |
31.50 |
32.20 |
0.70 |
7.69 |
|
|
71.60 |
72.10 |
0.50 |
1.53 |
SAM West |
TN-25-048 |
28.30 |
29.20 |
0.90 |
0.96 |
|
|
31.90 |
32.90 |
1.00 |
3.44 |
|
|
33.70 |
34.90 |
1.20 |
0.67 |
|
|
39.30 |
40.50 |
1.20 |
0.81 |
|
|
45.20 |
47.00 |
1.80 |
0.62 |
|
|
55.30 |
56.10 |
0.80 |
1.75 |
*Composites above 0.5 g/t Au and metal factor above 0.5 Au "gxm" |
Qualified Person Statement
The scientific and technical information in this news release has been reviewed and approved by Mr.
Table 3: True North; Drill Hole Details
Drill Hole |
`Target
( |
Northing* |
Easting* |
Elevation |
Azimuth |
Inclination |
Depth |
|
TN-25-025 |
SAM West |
5655913 |
311823 |
255 |
230 |
-80 |
149.0 |
|
TN-25-029 |
SAM West |
5655914 |
311826 |
255 |
186 |
-69 |
167.0 |
|
TN-25-032 |
SAM West |
5655913 |
311822 |
256 |
139 |
-64 |
182.0 |
|
TN-25-035 |
SAM West |
5655894 |
311926 |
253 |
228 |
-45 |
193.0 |
|
TN-25-037 |
SAM West |
5655894 |
311926 |
253 |
292 |
-73 |
215.0 |
|
TN-25-043 |
SAM West |
5655811 |
311852 |
248 |
285 |
-49 |
164.0 |
|
TN-25-045 |
SAM West |
5655811 |
311852 |
248 |
285 |
-68 |
170.0 |
|
TN-25-048 |
SAM West |
5655788 |
311872 |
251 |
148 |
-45 |
131.0 |
*Coordinates are provided in |
Quality Assurance/
Core samples are collected by sawing the drill core in half along the axis, with one-half sampled, placed in plastic sample bags, labelled, sealed and the other half retained for future reference. Batches are shipped to
About
ON BEHALF OF THE BOARD OF DIRECTORS
President and CEO
CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION
This news release may contain forward-looking statements. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or describes a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved.
All forward-looking statements reflect the Company's beliefs and assumptions based on information available at the time the statements were made. Actual results or events may differ from those predicted in these forward-looking statements. All of the Company's forward-looking statements are qualified by the assumptions that are stated or inherent in such forward-looking statements, including the assumptions listed below. Although the Company believes that these assumptions are reasonable, this list is not exhaustive of factors that may affect any of the forward-looking statements.
Forward-looking statements involve known and unknown risks, future events, conditions, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, prediction, projection, forecast, performance or achievements expressed or implied by the forward-looking statements. All statements that address expectations or projections about the future, including, but not limited to, statements with respect to the terms of the Offering, the use of proceeds of the Offering, the timing and ability of the Company to close the Offering, the timing and ability of the Company to receive necessary regulatory approvals, the tax treatment of the securities issued under the Offering, the timing for the Qualifying Expenditures to be renounced in favour of the subscribers, and the plans, operations and prospects of the Company, are forward-looking statements. Although
All forward-looking statements contained in this news release are given as of the date hereof. The Company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except in accordance with applicable securities laws.
Neither
SOURCE