E3 Lithium Outlines an Inaugural Measured and Indicated Mineral Resource Estimate of 5.0 Mt LCE for the Garrington District
This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20250624119325/en/

Figure 1: Outline of E3 Lithium’s
Highlights:
-
The Garrington District includes 273,449 hectares of land - Measured and Indicated mineral resource estimate of 5.0 Mt LCE
- Inferred mineral resource estimate of 0.3 Mt LCE
-
E3 Lithium’s total Measured and Indicated mineral resources in
Alberta is now 21.2 Mt LCE
“Alberta’s lithium resources stand out globally as some of the most significant in size, thanks to the scale of the brine aquifers in the province,” said
The disclosure in this news release of scientific and technical information pertaining to the
The technical report will be available on the Company’s website (www.e3lithium.ca/technical-reports/) and SEDAR (www.sedar.com) within 45 days of this announcement.
Garrington District Brine Resource Estimate
The Garrington Report follows from the NI 43-101 Technical Report for the North Rocky Property, effective
First, data compilation and review of existing reports within the
The updated mineral resource estimate for the
Table 1: E3 Lithium’s Garrington District Brine Resource Estimates
Resource Category1 |
Brine Volume (m3) |
Weighted Average
|
OLIP (t Li)3 |
OLIP (t LCE) 3 |
Measured |
560,000,000 |
55 |
30,000 |
163,000 |
Indicated |
17,005,000,000 |
54 |
905,000 |
4,817,000 |
Total Measured & Indicated |
17,565,000 |
54 |
935,000 |
4,980,000 |
Inferred |
1,485,000,000 |
42 |
60,000 |
319,000 |
1. |
|
The Intervals reported follow the following definitions: Measured - evidence is sufficient to confirm geological, and grade or quality continuity between points of observation; Indicated - evidence is sufficient to assume geological, and grade or quality continuity between points of observation and Inferred - evidence is sufficient to imply but not verify geological, grade or quality continuity. |
2. |
|
Based on LCE tonnage. |
3. |
|
Brine Resource estimates are inclusive of unleased freehold mineral rights. |
The mineral resource estimate was completed by a multi-disciplinary team led by
To calculate the brine volume for each zone within the Leduc Formation, the brine volume was exported from the geological model, incorporating three district brine saturations. The brine volume is multiplied by the lithium grade to calculate the Original Lithium in Place (OLIP) in tonnes of elemental lithium and in tonnes of lithium carbonate equivalent.
Resource categorization reflects the confidence in both the data sets and the interpretations. Measured resources exist within the conceptual development area and are restricted to volumes exceeding a 6% porosity cut-off within a single connected geobody volume with lithium grade measurements. Indicated resources exist across the
With the updated Garrington Resource Estimate, E3 Lithium’s total Measured and Indicated lithium resources in
Table 2: E3 Lithium’s Total Lithium Brine Reserves and Brine Resources
|
Lithium Carbonate Equivalent (tonnes) |
Average Lithium Grade (mg/L) |
||||||||||
Brine Reserves |
Brine Resources1 |
|||||||||||
District (Province) |
Proven & Probable |
Measured |
Indicated |
Measured & Indicated |
Inferred |
Measured & Indicated |
Inferred |
|||||
Bashaw (AB) |
1,137,850 |
6,687,200 |
9,530,900 |
16,218,100 |
N/A |
75 |
N/A |
|||||
Garrington (AB) |
N/A |
163,000 |
4,817,000 |
4,980,000 |
319,000 |
54 |
42 |
|||||
Estevan (SK) |
N/A |
N/A |
N/A |
N/A |
2,545,000 |
N/A |
98 |
|||||
Total |
1,137,850 |
6,850,200 |
14,347,900 |
21,198,100 |
2,864,000 |
|
|
1. Brine Resources are reported using the 2014 CIM definition standards, and are inclusive of those Brine Resources converted to Brine Reserves. Brine Resource estimates are inclusive of unleased freehold mineral rights. |
ON BEHALF OF THE BOARD OF DIRECTORS
About
1: The Clearwater Project NI 43-101 Pre-Feasibility Study, effective
2: The mineral resource NI 43-101 Technical Report for the Garrington District Lithium Resource Estimate, effective
3: The mineral resource NI 43-101 Technical Report for the
Forward-Looking and Cautionary Statements
This news release includes certain forward-looking statements as well as management’s objectives, strategies, beliefs and intentions or forward-looking information within the meaning of applicable securities laws. Forward-looking statements are frequently identified by such words as “believe”, “may”, “will”, “plan”, “expect”, “anticipate”, “estimate”, “intend”, “project”, “potential”, “possible”, “could” and similar words referring to future events and results. Forward-looking statements are based on the current opinions, expectations, estimates and assumptions of management in light of its experience, perception of historical trends, and results of the Garrington Report, but such statements are not guarantees of future performance. In particular, this news release contains forward-looking information relating to: the mineral resource estimate at the
All forward-looking information (including future-orientated financial information) is inherently uncertain and subject to a variety of assumptions, risks and uncertainties, including the speculative nature of mineral exploration and development, fluctuating commodity prices, the effectiveness and feasibility of emerging lithium extraction technologies which have not yet been tested or proven on a commercial scale or on the Company’s brine, risks related to the availability of financing on commercially reasonable terms and the expected use of proceeds; operations and contractual obligations; changes in estimated mineral reserves or mineral resources; future prices of lithium and other metals; availability of third party contractors; availability of equipment; failure of equipment to operate as anticipated; accidents, effects of weather and other natural phenomena and other risks associated with the mineral exploration industry; the Company’s lack of operating revenues; currency fluctuations; risks related to dependence on key personnel; estimates used in financial statements proving to be incorrect; risks related to the results of the testing program not being in delivered in a timely manner and/or not being in line with management’s expectations; competitive risks and the availability of financing, as described in more
detail in our recent securities filings available under the Company’s profile on SEDAR+ at www.sedarplus.ca. Actual events or results may differ materially from those projected in the forward-looking statements and we caution against placing undue reliance thereon. We assume no obligation to revise or update these forward-looking statements except as required by applicable law.
View source version on businesswire.com: https://www.businesswire.com/news/home/20250624119325/en/
Investor Relations
investor@e3lithium.ca
587-324-2775
External Relations
communications@e3lithium.ca
587-324-2775
Source: