GR Silver Mining Reports Initial High-Grade Results from Plomosas Mine Sampling Program
- To model the recently mapped high-grade silver zones in the interior of the historic Plomosas Mine, post completion of the
March 2023 NI 43-101 mineral resource estimate ("MRE"); - To collect metallurgical test work samples essential to define key parameters for implementation of a Bulk Sampling Test Mining Program ("BSTM") at the
Plomosas Mine (Table 1); and - To enhance the existing database of underground samples for improved reconciliation between the MRE and areas identified for a BSTM.
Sampling Highlights
Initial highlights of the
-
Chip Mine Face Sample – Level 883 - 2,423 g/t Ag Eq*, consisting of 675 g/t Ag, 46.9% Pb, 4.5% Zn and 0.54 g/t Au (Polymetallic Hydrothermal Breccia – Massive Sulphide) - Channel Sample – Level 833 – 0.8 m @ 2,019 g/t Ag Eq, consisting of 137 g/t Ag, 5.74 g/t Au,16.7% Pb, and 18.2% Zn (Polymetallic Hydrothermal Breccia – Massive Sulphide)
- Channel Sample – Level 950 – 0.6 m @ 3,993 g/t Ag Eq, 310 g/t Ag, 15.20 g/t Au,26.2% Pb and 10.2% Zn (Polymetallic Hydrothermal Breccia – Massive Sulphide)
The Program will consist of two phases over the next four months, whereby Phase I assesses metallurgical data collected to support engineering studies as part of the BSTM, and
The Program leverages existing permits to operate at the
Table 1 - Phase I Underground Sampling Assay Results,
Sample |
Sample ID |
Underground Level |
Sample |
Ag Eq* |
Ag |
Au |
Pb |
Zn |
Cu |
Rocktype |
Type |
Length(m) |
g/t |
g/t |
g/t |
% |
% |
% |
|||
|
80458 |
815 |
|
877 |
127 |
2.07 |
1.0 |
2.7 |
2.9 |
Stockwork - Veins |
|
80489 |
825 |
|
211 |
63 |
0.04 |
1.6 |
1.9 |
0.1 |
Polymetallic Veins |
|
80494 |
862 |
|
910 |
90 |
0.99 |
11.5 |
8.5 |
0.1 |
Polymetallic Hydrothermal Breccia |
|
80468 |
883 |
|
2,423 |
675 |
0.54 |
46.9 |
4.5 |
0.1 |
Polymetallic Hydrothermal Breccia |
Chip |
80478 |
975 |
|
370 |
308 |
0.06 |
0.4 |
0.7 |
0.1 |
Polymetallic Hydrothermal Breccia |
|
80460 |
975 |
|
365 |
297 |
0.09 |
0.4 |
0.7 |
0.1 |
Polymetallic Veins |
Sample |
80491 |
975 |
|
805 |
50 |
0.69 |
12.4 |
5.9 |
0.4 |
Polymetallic Veins |
|
80474 |
1000 |
|
822 |
71 |
1.13 |
13.4 |
4.1 |
0.3 |
Stockwork - Veins |
|
80466 |
1000 |
|
587 |
36 |
0.48 |
2.1 |
6.9 |
1.1 |
Polymetallic Hydrothermal Breccia |
|
80479 |
1000 |
|
170 |
51 |
0.02 |
1.8 |
1.1 |
0.1 |
Polymetallic Hydrothermal Breccia - Massive Sulphide |
|
80472 |
1000 |
|
1,000 |
174 |
1.52 |
10.5 |
7.7 |
0.3 |
Stockwork - Veins |
|
80498 |
833 |
0.8 |
2,019 |
137 |
5.74 |
16.7 |
18.2 |
0.5 |
Polymetallic Hydrothermal Breccia - Massive Sulphide |
Channel |
80499 |
833 |
1 |
909 |
71 |
2.32 |
6.7 |
8.8 |
0.3 |
Polymetallic Hydrothermal Breccia - Massive Sulphide |
|
80500 |
833 |
0.75 |
386 |
34 |
0.09 |
8.1 |
1.9 |
0.0 |
Polymetallic Hydrothermal Breccia |
Sample |
80503 |
862 |
1.2 |
1,870 |
96 |
0.54 |
29.8 |
16.8 |
0.6 |
Polymetallic Veins |
|
80504 |
950 |
0.8 |
1,192 |
28 |
0.18 |
29.5 |
5.0 |
0.0 |
Polymetallic Veins |
|
80505 |
950 |
0.6 |
15 |
8 |
0.01 |
0.0 |
0.1 |
0.0 |
Polymetallic Hydrothermal Breccia |
|
80507 |
950 |
0.9 |
64 |
11 |
0.16 |
0.1 |
0.6 |
0.1 |
Polymetallic Veins |
|
80508 |
950 |
0.6 |
3,993 |
310 |
15.20 |
26.2 |
10.2 |
7.2 |
Polymetallic Hydrothermal Breccia - Massive Sulphide |
|
80509 |
1000 |
1 |
421 |
68 |
0.55 |
2.5 |
5.1 |
0.1 |
Polymetallic Hydrothermal Breccia |
|
80512 |
1000 |
1 |
899 |
864 |
0.07 |
0.1 |
0.2 |
0.1 |
Stockwork - Veins |
Note: |
Numbers may be rounded. Results are uncut and undiluted. True width not estimated as the Company does not have sufficient data from the new mineralized zones to determine the true widths of the intervals with any confidence. |
|
* Ag Eq calculations using |
The areas selected for Phases I and II of the Program consist of material where mineralization is continuous, with evidence of silver, gold and base metal mineralization at concentrations attractive for a potential BSTM in early 2026. The BSTM will also require the construction of a demonstration processing plant on site, with details to be defined after the completion of
The Company plans to continue investigating opportunities at the
Note: Purple shapes are potential stopes blocks for BSTM. Pale grey represents existing underground developments of varying sizes, ramps and historical stopes. |
About the
QA/QC Procedures
The Company has implemented QA/QC procedures, which include the insertion of blank, duplicate, and standard samples in all sample lots sent to SGS de México,
Qualified Person
The Qualified Person under National Instrument 43-101 Standards of Disclosure for Mineral Projects for this news release is
About
Márcio Fonseca, President & CEO
Cautionary Statement Regarding Forward-Looking Information
This press release contains "forward-looking statements" within the meaning of applicable Canadian securities legislation and information that are based on the beliefs of management and reflect the Company's current expectations. When used in this press release, the words "estimate", "project", "belief", "anticipate", "intend", "expect", "plan", "predict", "may" or "should" and the negative of these words or such variations thereon or comparable terminology are intended to identify forward-looking statements and information. Such statements and information reflect the current view of the Company. Risks and uncertainties may cause actual results to differ materially from those contemplated in those forward-looking statements and information. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements.
Neither the
SOURCE