[Press Release] SEG Announces 2025 Interim Results
Source: EQS
Press Release (For immediate release)
SEG Announces 2025 Interim Results
Achieving Milestones in Operations and Expanding Overseas Markets
(
During the Reporting Period, the Board, the management, and all employees worked in unity in optimizing existing assets, seeking growth, strengthening foundations, and managing risks. We fully optimized production and operations. With steadfast commitment to high quality development to counter external uncertainties, we achieved a series of new progress and accomplishments.
First, we upheld our positioning of “technological innovation plus engineering services”, enhancing our value creation capabilities in engineering services, technological innovation, and capital operations, with business performance growing for three consecutive years. During the Reporting Period, the Group’s ongoing projects progressed steadily, generating revenue of
Second, we adhered to the “customer-centric” philosophy, building a competitive edge through “high level front end engineering capabilities plus optimal cost project execution capabilities”, achieving growth both in scale and quality of market development. During the Reporting Period, the Group signed EPC contracts for large scale domestic and overseas projects including the
Third, we remained committed to the principle of “investor‑oriented governance”, focusing on capital market concerns, enhancing corporate governance, and driving value realization, with continued improvements in the quality of our listed company status. During the Reporting Period, the Group advanced its “Green and Clean” strategy by establishing
Chairman of SEG, Mr.
Business Review and Highlights
Quantitative and qualitative increase in market development
During the Reporting Period, the value of new contracts signed by the Group was
In the domestic market, the Group continued to maintain overall competitiveness to continuously expand strategic emerging business such as new technologies, new materials and new energy while enhancing its core advantages in traditional businesses. During the Reporting Period, the representative newly signed domestic contracts included the EPC contract for the
In the overseas market, the Group strengthened the alliance with international peers and enhanced high-level mutual visits and promotional exchanges with strategic clients, thereby continuously expanding and optimizing our overseas market development. During the Reporting Period, the representative newly signed overseas contracts included the FEED + convertible EPC contract for the
Steady progress in the construction of key projects
Continuous progress in technology innovation
During the Reporting Period, leveraging our strengths in project integration, innovation, and engineering transformation, the Group continuously expanded open cooperation in science and technology innovation. We organized targeted technical exchanges with relevant institutes of the
During the Reporting Period, the Group focused its efforts on key core technologies, including (1) Sinopec Tianjin’s 150,000 tons/year ALL-PE package technology development and industrial demonstration application plan is progressing. This series of high performance polyethylene products have the characteristics of high strength, wear resistance, corrosion resistance and good biocompatibility, and have huge market potential especially in high-end medical materials and new energy materials. (2) Sinopec Hainan’s 60,000t/year PBST biodegradable material industrialization technology development and demonstration project has successfully produced qualified PBST products. Its products are of great significance to solve global white pollution and promote green and low-carbon development. (3) Sinopec Maoming’s 50,000 tons/year polyolefin elastomer (POE) industrial demonstration project has been successfully launched and qualified products have been produced. It has provided high-performance material solutions for the fields of new energy, automobiles and electronics. (4) The project “Research on the Application of Flux-Cored Wires in Petrochemical Carbon Steel Pipes” has successfully passed the acceptance check, improving construction efficiency and quality.
During the Reporting Period, the Group signed 187 new technology development contracts of various types with a total contract value of
During the Reporting Period, the Group filed 356 new patent applications, of which 71.9% were invention patents; and 103 newly licensed patents, of which 44.7% were invention patents. As at the end of the Reporting Period, the Group had 4,555 valid patents, of which 52% were invention patents. The quality of patents was consistently optimized.
During the Reporting Period, the Group received a total of 34 science and technology progress awards in scientific and technical innovation and engineering construction fields at the provincial and ministerial or above level. The Group also received seven provincial and ministerial-level quality engineering awards.
Leading new industrialization in the engineering and construction industry
The Group develops new quality productivity and builds its core competitiveness around innovation and practicality.
Artificial intelligence applications
During the Reporting Period, the Group continued to explore innovative applications of “AI for Science, AI for Design, AI for Engineering, AI for Construction and AI for Operation”. We have conducted a number of research projects on AI, including in the field of design, building knowledge graphs to enhance design efficiency, exploring the transition from traditional to generative design, and in the field of construction, applying AI to optimize whole lifecycle engineering plans, shorten iteration cycles, improve scheduling, and boost overall construction efficiency. We organized research on smart design special projects in 13 key areas, including ethylene devices and HAZOP process safety, and formed professional models in various scenarios, such as design smart review, smart process safety analysis, and structural smart design. During the Reporting Period, the Group has already achieved key milestones in areas such as plant wide process optimization, intelligent drawing review, 3D model verification, and smart piping design.
Advanced automation technology and robot substitution
During the Reporting Period, the Group promoted advanced equipment and steadily shifted from conventional construction methods to a model characterized by “standardized lean design, factory based manufacturing, and modular installation”. We are strengthening integrated capabilities across collaborative design, supply chain management, constructability studies, and project interface management, thereby enhancing quality and value creation across the industrial chain. Through digital and intelligent enablement, including the deployment of “machine OEM” smart equipment and automated production lines, we are transforming production organization, improving construction efficiency, and enhancing safety performance. We are advancing intelligent operations and maintenance, extending the scope and depth of digital plant delivery, developing a “digital twin” O&M platform, and piloting remote technical and intelligent support service centers for process operations.
During the Reporting Period, the Group continued to promote the research and development and application of high-efficiency automation technology such as automatic welding robots, intelligent equipment for intelligent welding demonstration production lines, remote control construction machinery and industrial robots, so as to effectively reduce costs and improve efficiency. During the Reporting Period, the Group continued to build the Efficient Automation Technology System and compiled a list of 86 high-efficiency construction equipment applications; prepared the Application Guide for Engineering Construction Intelligent Equipment, introducing 8 application equipment for welding, commissioning, inspection and measurement scenarios, 12 application equipment for supply chain intelligent management, intelligent engineering, green and low-carbon development and factory-based manufacturing scenarios, as well as intelligent equipment for special scenarios such as inspection and repair, demolition and nondestructive testing.
Informatization management and digital application
During the Reporting Period, the Group continued to optimize and integrate its corporate management systems and management processes, and promoted the data integration and the upgrading of integrated platforms for project management, construction management, intelligent construction sites and operation management businesses in accordance with the information application framework 2.0. The Group empowered supply chain collaboration through digital technology to develop intelligent supply chain management capabilities throughout the project life cycle, and implemented intelligent management of human resources, machinery and equipment, materials and other resources on construction sites, and formed standard procedures and intelligent management measures for the construction processes such as organization, operation, progress, quality and safety, to create standardized intelligent construction sites.
Maintaining a good performance of QHSE
During the Reporting Period, the Group had 1,770 on-going domestic and overseas projects with over 100,000 on-site employees on average per day. As at the end of the Reporting Period, the cumulative safety labor hours were
During the Reporting Period, the Group comprehensively promoted the establishment of the work safety standardization team, continuously required three types of key management personnel including group leaders, team leaders and subcontractors to provide services with certification, and completed the training covering all the strategic subcontractors. The special evaluation and inspections on the design of pressure vessels and pressure pipelines were carried out to reduce the HSE risks from the source. The Group developed and established an operation supervision platform for “major hazardous projects” which adopts three-level control and whole-process informatization dynamic monitoring and establishes a problem database in the refining and chemical engineering segment. Focusing on the four major goals of carbon reduction, pollution reduction, efficiency improvement and green development, the Group initiated the second stage of green enterprise action for energy conservation and emission reduction at the design source, and comprehensively promoted green construction.
Business Prospects
The Group has set its target for market development of
Firstly, the Group will adjust the structure to create new growth and strengthen market development with greater efforts. Domestically, the Group will seize market opportunities and focus on tracking services and development of key projects to strengthen our traditional advantages in petroleum chemical, coal chemical, and natural gas markets; actively explore new fields such as high-end carbon materials, sustainable aviation fuel, green hydrogen, green ammonia, and green methanol to foster new growth engines. The Group will accelerate its expansion into new markets, expand its customer base and make every effort to explore new opportunities in the market. Internationally, the Group will increase exchanges and cooperation with international energy licensors, high-quality strategic clients and engineering service peers. The Group will firmly pursue high-quality development in high-end and front-end businesses, extend to the front end of the engineering services value chain, focus on consulting, FEED, detailed design, and procurement, with construction-end businesses as supplements, so as to enhance the technological content and efficiency of engineering services. The Group will continue to deepen its development in traditional advantageous markets such as the
Secondly, the Group will strengthen project management to promote the improvement of profitability. The Group will give full play to the advantages of an integrated whole industry chain, optimize the whole process of project management, and enhance the profitability of the entire chain of engineering construction. The Group will accelerate the promotion and application of research results such as design optimization and constructability, accelerate the application of advanced automation technology of “replacing labor with machines”, and promote the construction of low-cost centers in the
Thirdly, the Group will adhere to an innovation-driven strategy and enhance the leading and driving role of research and development. The Group will leverage its advantages in the whole industry chain, technology, talents and capital to accelerate the deployment of technologies in new areas. Through strengthening open cooperation in scientific and technological innovation, effectively organizing the sourcing of technology with scientific research institutes and universities, the Group will accelerate the development of scientific and technological innovations and transformation and deepen technological cooperation with internationally renowned patent holders and engineering companies. The Group will accelerate the deployment of AI intelligent design, actively utilize digital technologies to upgrade traditional industries while deploying its resources in future industries. The marketing and promotion of the Group’s technologies will be further strengthened, so as to continuously enhance the reputation and influence of the Group’s technologies.
Summary of Financial Data and Indicators Prepared in Accordance with International Financial Reporting Standards (“IFRS”)
Unit: RMB’000
Unit: RMB’000
~ End ~
This press release is issued by
About
The Group is a leading energy and chemical engineering company in the PRC with strong international competitiveness and can provide domestic and overseas clients with overall solutions for petrol refining, petrochemicals, aromatics, coal chemicals, inorganic chemicals, pharmaceutical chemicals, clean energy, storage and transportation facilities, environmental protection and energy saving, among other industry sectors. The Group is an integrated service provider for the whole industry chain and the whole life cycle in energy and chemical industry and can provide overall industry chain services including engineering consulting, technology licensing, project management contracting, financing assistance, EPC (engineering, procurement and construction) contracting, as well as design, procurement, construction and installation, lifting and transportation of large equipment, precommissioning and start-up.
After nearly 70 years of continuous development, the Group currently has an academician of the
In the future, adhering to the development orientation of “Integrated Service Provider with Whole Industry Chain and Whole Life Cycle in Energy and Chemical Industry”, the Group will base itself on the energy and chemical engineering construction industry, continuously broaden its business scope and extend its value chain. The Group take “Engineering Innovation” and “Value Creation” as the development engines and deepen the implementation of the six development strategies of “Value-Oriented, Innovation-Driven,
Disclaimer
This press release includes “forward-looking statements”. All statements, other than statements of historical facts that address activities, events or developments that the Group expects or anticipates will or may occur in the future (including but not limited to projections, targets, other estimates and business plans) are forward-looking statements. The Group’s actual results or developments may differ materially from those indicated by these forward-looking statements as a result of various factors and uncertainties, including but not limited to the price fluctuation, possible changes in actual demand, foreign exchange rate, market shares, competition, environmental risks, possible changes to laws, finance and regulations, conditions of the global economy and financial markets, political risks, possible delay of projects, government approval of projects, cost estimates and other factors beyond the Group’s control. In addition, the Group makes the forward-looking statements referred to herein as of today and undertakes no obligation to update these statements.
Investor and Media Enquiries:
Liu Jingjing /Zheng Zhexia Tel: (86) 10 5673 0523 / (86) 10 5673 0525 Email: seg.ir@sinopec.com
Tel: (852) 2522 1838 / (852) 2522 1368 Fax: (852) 2521 9955 Email: seg@prchina.com.hk
File: [Press Release] SEG Announces 2025 Interim Results
|