i-80 Gold Reports New High-Grade Assay Results Reinforcing Resource Expansion Potential at Granite Creek Underground Project
The Project is
A total of 16,000 meters were drilled over 46 holes as part of the 2025 drilling program at Granite Creek Underground, which began in
Highlight results from infill holes in 2025 drilling at the SPZ
- 40.4 g/t Au over 13.2 m in hole iGU25-31
- 31.3 g/t Au over 7.8 m in hole iGU25-15
- 15.0 g/t Au over 17.5 m in hole iGU25-24
- 12.8 g/t Au over 19.8 m in hole iGU25-08
"The 2025 infill drilling results at Granite Creek Underground successfully support our geological model, confirming the continuity and high-grade nature of the deposit.
The 2025 drill program was primarily focused on infill drilling to support the conversion of mineral resources from the inferred mineral resource category to the Indicated category. Seven holes also tested the expansion potential of the SPZ to the north and at depth. Results from the 2025 drill program will be combined with infill drilling data from 2023 and 2024 to produce an updated mineral resource estimate using three years of additional data. This mineral resource estimate will form the basis of the upcoming Granite Creek Underground feasibility study, which is expected to be completed late in the first quarter of 2026, with results to be released in the second quarter of 2026. The current mineral resource estimate in the PEA filed in
The Company is currently evaluating the timing of an additional step out and infill drilling campaign for the SPZ in 2026 as part of a multi-year drill program.
Table 1: Summary Assay Results from SPZ Drilling
|
Drillhole ID |
Zone |
Type |
From (m) |
To (m) |
Length (m) |
Au (g/t) |
|
iGS25-02A(1)(2) |
SPZ |
Core |
616.6 |
619.5 |
2.9 |
33.6 |
|
and |
SPZ |
Core |
622.7 |
625.4 |
2.7 |
7.5 |
|
and |
SPZ |
Core |
634.1 |
637.7 |
3.6 |
29.7 |
|
iGS25-04(1) |
SPZ |
Core |
535.8 |
537.6 |
1.7 |
2.5 |
|
iGS25-05 |
SPZ |
Core |
523.7 |
526.2 |
2.6 |
10.2 |
|
and |
SPZ |
Core |
529.9 |
541.9 |
12.0 |
8.9 |
|
iGS25-06 |
SPZ |
Core |
514.8 |
516.5 |
1.7 |
4.0 |
|
iGS25-07 |
SPZ |
Core |
585.1 |
586.0 |
0.9 |
2.7 |
|
iGS25-08A(1) |
SPZ |
Core |
563.6 |
564.3 |
0.8 |
5.9 |
|
iGS25-09 |
SPZ |
Core |
464.5 |
465.4 |
0.9 |
2.2 |
|
iGS25-10(1) |
SPZ |
Core |
602.7 |
605.2 |
2.4 |
12.7 |
|
iGS25-11(1) |
SPZ |
Core |
617.2 |
619.3 |
2.1 |
15.5 |
|
iGS25-13 |
SPZ |
Core |
508.3 |
508.8 |
0.5 |
7.3 |
|
iGS25-14(1) |
SPZ |
Core |
652.8 |
654.6 |
1.7 |
5.9 |
|
iGU25-01(2) |
SPZ |
Core |
116.6 |
122.2 |
5.7 |
20.8 |
|
iGU25-02(2) |
SPZ |
Core |
53.1 |
54.8 |
1.7 |
12.4 |
|
and |
SPZ |
Core |
95.1 |
100.1 |
5.0 |
12.2 |
|
and |
SPZ |
Core |
106.1 |
109.3 |
3.3 |
16.2 |
|
iGU25-03(2) |
SPZ |
Core |
52.5 |
59.7 |
7.2 |
7.2 |
|
and |
SPZ |
Core |
113.5 |
117.0 |
3.4 |
11.4 |
|
iGU25-04(2) |
SPZ |
Core |
63.7 |
69.2 |
5.5 |
10.4 |
|
iGU25-05(2) |
SPZ |
Core |
244.8 |
247.8 |
3.0 |
11.4 |
|
iGU25-06 |
SPZ |
Core |
126.5 |
129.1 |
2.6 |
16.8 |
|
and |
SPZ |
Core |
145.5 |
147.2 |
1.7 |
11.4 |
|
and |
SPZ |
Core |
153.0 |
156.7 |
3.7 |
8.7 |
|
and |
SPZ |
Core |
177.7 |
182.3 |
4.6 |
7.9 |
|
iGU25-07 |
SPZ |
Core |
180.8 |
190.8 |
10.1 |
15.1 |
|
and |
SPZ |
Core |
269.3 |
273.7 |
4.4 |
7.7 |
|
and |
SPZ |
Core |
319.4 |
322.3 |
2.9 |
10.3 |
|
iGU25-08 |
SPZ |
Core |
220.1 |
239.9 |
19.8 |
12.8 |
|
and |
SPZ |
Core |
249.0 |
253.6 |
4.6 |
13.3 |
|
iGU25-09 |
SPZ |
Core |
184.1 |
195.4 |
11.3 |
13.6 |
|
iGU25-10 |
SPZ |
Core |
205.3 |
213.4 |
8.1 |
18.0 |
|
iGU25-11 |
SPZ |
Core |
132.0 |
140.5 |
8.5 |
5.6 |
|
iGU25-12 |
SPZ |
Core |
210.6 |
215.5 |
4.9 |
7.4 |
|
and |
SPZ |
Core |
232.0 |
235.3 |
3.4 |
7.0 |
|
iGU25-13 |
SPZ |
Core |
104.4 |
107.0 |
2.6 |
15.4 |
|
iGU25-14 |
SPZ |
Core |
196.3 |
200.6 |
4.3 |
28.7 |
|
and |
SPZ |
Core |
207.0 |
210.9 |
4.0 |
40.6 |
|
iGU25-15 |
SPZ |
Core |
223.0 |
230.7 |
7.8 |
31.3 |
|
and |
SPZ |
Core |
244.9 |
252.4 |
7.5 |
20.9 |
|
iGU25-16 |
SPZ |
Core |
143.2 |
144.6 |
1.4 |
11.2 |
|
and |
SPZ |
Core |
164.3 |
175.6 |
11.3 |
19.8 |
|
iGU25-17 |
SPZ |
Core |
206.4 |
208.2 |
1.8 |
34.4 |
|
iGU25-18 |
SPZ |
Core |
263.8 |
266.1 |
2.3 |
24.8 |
|
iGU25-19 |
SPZ |
Core |
214.9 |
222.5 |
7.6 |
28.2 |
|
iGU25-20 |
SPZ |
Core |
255.6 |
258.2 |
2.6 |
26.2 |
|
iGU25-21 |
SPZ |
Core |
149.0 |
153.9 |
4.9 |
5.9 |
|
iGU25-22 |
SPZ |
Core |
163.1 |
172.7 |
9.6 |
11.3 |
|
iGU25-23 |
SPZ |
Core |
332.2 |
333.6 |
1.4 |
4.2 |
|
iGU25-24 |
SPZ |
Core |
177.1 |
194.6 |
17.5 |
15.0 |
|
iGU25-25 |
SPZ |
Core |
176.0 |
179.2 |
3.2 |
10.8 |
|
iGU25-26 |
SPZ |
Core |
262.1 |
268.4 |
6.3 |
8.3 |
|
iGU25-27 |
SPZ |
Core |
196.3 |
199.8 |
3.5 |
13.3 |
|
and |
SPZ |
Core |
208.2 |
209.6 |
1.4 |
19.0 |
|
iGU25-28 |
SPZ |
Core |
248.5 |
252.2 |
3.7 |
9.2 |
|
iGU25-29 |
SPZ |
Core |
212.4 |
215.9 |
3.5 |
32.3 |
|
iGU25-30 |
SPZ |
Core |
269.3 |
271.9 |
2.6 |
11.9 |
|
iGU25-31 |
SPZ |
Core |
185.0 |
198.2 |
13.2 |
40.4 |
|
iGU25-32 |
SPZ |
Core |
253.9 |
256.6 |
2.7 |
6.2 |
|
iGU25-33 |
SPZ |
Core |
217.9 |
219.2 |
1.3 |
10.0 |
|
iGU25-34(1) |
SPZ |
Core |
272.6 |
277.8 |
5.2 |
15.8 |
|
and |
SPZ |
Core |
302.2 |
304.0 |
1.8 |
8.9 |
|
iGU25-35 |
SPZ |
Core |
228.2 |
230.7 |
2.5 |
22.8 |
|
Notes to table above: (1) Indicates a step-out drill hole. All remaining holes represent infill drilling.
(2) Previously disclosed in a press release filed on True widths are estimated between approximately 70%-95% of core width. |
||||||
Table 1a: Collar Coordinates
|
UTM |
Drillhole ID |
East m |
North m |
Elevation m |
Azimuth |
Dip |
|
Nad 83 |
iGS25-02A |
478736 |
4554389 |
1541 |
309 |
-75 |
|
iGS25-04 |
478736 |
4554389 |
1550 |
015 |
-71 |
|
|
iGS25-05 |
478520 |
4554452 |
1559 |
023 |
-78 |
|
|
iGS25-06 |
478598 |
4554482 |
1552 |
357 |
-81 |
|
|
iGS25-07 |
478572 |
4554414 |
1550 |
009 |
-80 |
|
|
iGS25-08A |
478598 |
4554482 |
1552 |
353 |
-84 |
|
|
iGS25-09 |
478512 |
4554449 |
1559 |
017 |
-76 |
|
|
iGS25-10 |
478572 |
4554414 |
1550 |
022 |
-79 |
|
|
iGS25-11 |
478736 |
4554389 |
1541 |
322 |
-70 |
|
|
iGS25-13 |
478580 |
4554221 |
1465 |
343 |
-68 |
|
|
iGS25-14 |
478736 |
4554389 |
1541 |
308 |
-73 |
|
|
iGU25-01 |
478414 |
4554275 |
1258 |
293 |
-13 |
|
|
iGU25-02 |
478414 |
4554274 |
1257 |
285 |
-17 |
|
|
iGU25-03 |
478414 |
4554273 |
1257 |
277 |
-24 |
|
|
iGU25-04 |
478415 |
4554274 |
1257 |
287 |
-40 |
|
|
iGU25-05 |
478521 |
4554325 |
1259 |
341 |
-71 |
|
|
iGU25-06 |
478415 |
4554275 |
1257 |
305 |
-49 |
|
|
iGU25-07 |
478415 |
4554275 |
1257 |
316 |
-68 |
|
|
iGU25-08 |
478524 |
4554325 |
1260 |
341 |
-67 |
|
|
iGU25-09 |
478415 |
4554275 |
1257 |
335 |
-73 |
|
|
iGU25-10 |
478494 |
4554323 |
1260 |
344 |
-51 |
|
|
iGU25-11 |
478524 |
4554325 |
1257 |
325 |
-48 |
|
|
iGU25-12 |
478494 |
4554323 |
1260 |
353 |
-57 |
|
|
iGU25-13 |
478494 |
4554323 |
1257 |
324 |
-30 |
|
|
iGU25-14 |
478524 |
4554325 |
1258 |
286 |
-68 |
|
|
iGU25-15 |
478494 |
4554323 |
1260 |
356 |
-65 |
|
|
iGU25-16 |
478524 |
4554325 |
1258 |
302 |
-21 |
|
|
iGU25-17 |
478494 |
4554323 |
1258 |
304 |
-11 |
|
|
iGU25-18 |
478494 |
4554323 |
1260 |
001 |
-41 |
|
|
iGU25-19 |
478524 |
4554325 |
1258 |
307 |
-72 |
|
|
iGU25-20 |
478494 |
4554323 |
1260 |
009 |
-64 |
|
|
iGU25-21 |
478494 |
4554323 |
1258 |
310 |
-27 |
|
|
iGU25-22 |
478524 |
4554325 |
1258 |
314 |
-37 |
|
|
iGU25-23 |
478494 |
4554323 |
1260 |
011 |
-53 |
|
|
iGU25-24 |
478524 |
4554325 |
1258 |
324 |
-26 |
|
|
iGU25-25 |
478494 |
4554323 |
1258 |
330 |
-46 |
|
|
iGU25-26 |
478524 |
4554325 |
1260 |
014 |
-69 |
|
|
iGU25-27 |
478494 |
4554323 |
1258 |
336 |
-55 |
|
|
iGU25-28 |
478524 |
4554325 |
1260 |
359 |
-70 |
|
|
iGU25-29 |
478494 |
4554323 |
1258 |
341 |
-26 |
|
|
iGU25-30 |
478524 |
4554325 |
1260 |
003 |
-58 |
|
|
iGU25-31 |
478494 |
4554323 |
1258 |
341 |
-34 |
|
|
iGU25-32 |
478415 |
4554275 |
1260 |
015 |
-59 |
|
|
iGU25-33 |
478415 |
4554275 |
1258 |
000 |
-51 |
|
|
iGU25-34 |
478415 |
4554275 |
1260 |
020 |
-64 |
|
|
iGU25-35 |
478415 |
4554275 |
1258 |
351 |
-23 |
Technical Disclosure and Qualified Persons
The technical information contained in this press release has been prepared under the supervision of, and has been reviewed and approved by
All samples were submitted to MSALABS (MSA) of
Endnotes
|
(1) |
|
|
|
|
|
(2) |
The press release titled "i-80 Gold Reports Initial Assay Results from Granite Creek Underground and Provides Infill Drilling Update at |
|
|
|
|
(3) |
The press release titled "i-80 Gold Announces Positive Preliminary Economic Assessment on the |
About
Cautionary Statement Regarding Forward Looking Information
Certain information set forth in this press release, including but not limited to management's assessment of the Company's future plans and operations, expectations regarding the timing, execution and results of the Company's drilling programs, outlook on gold output, the anticipated timing of gold output, project development or technical studies, including completion of the anticipated Granite Creek Underground feasibility study and the release of its results, the potential for mineral resource conversion and opportunities for expansion to the north and at depth at the SPZ, and management's view that similar mineral resource conversion and expansion success could be achieved with the planned 2026 drill program at Archimedes Underground and
This release also contains references to estimates of mineral resources. The estimation of mineral resources is inherently uncertain and involves subjective judgments about many relevant factors. Mineral resources that are not mineral reserves do not have demonstrated economic viability. The accuracy of any such estimates is a function of the quantity and quality of available data, and of the assumptions made and judgments used in engineering and geological interpretation (including estimated future production from the Project, the anticipated tonnages and grades that will be mined and the estimated level of recovery that will be realized), which may prove to be unreliable and depend, to a certain extent, upon the analysis of drilling results and statistical inferences that may ultimately prove to be inaccurate. Mineral resource estimates may have to be re-estimated based on: (i) fluctuations in commodities prices; (ii) results of drilling, (iii) metallurgical testing and other studies; (iv) proposed mining operations, including dilution; (v) the evaluation of mine plans subsequent to the date of any estimates; and (vi) the possible failure to receive required permits, approvals and licenses or changes to existing mining licenses.
Please see "Risks Factors" in the Form 10-K for the fiscal year ended
Additional information relating to
APPENDIX
Figure 1: Plan View of Granite Creek Underground
Figure 2: Long Section of Granite Creek Underground
Figure 3: Regional Map of
View original content to download multimedia:https://www.prnewswire.com/news-releases/i-80-gold-reports-new-high-grade-assay-results-reinforcing-resource-expansion-potential-at-granite-creek-underground-project-302665293.html
SOURCE