Arizona Metals Intersects 22.4 m @ 1.1% CuEq in the Kay Deposit and Additional Drill Results from Kay Exploration Targets
/NOT FOR DISTRIBUTION TO US NEWSWIRE SERVICES OR FOR RELEASE, PUBLICATION, DISTRIBUTION OR DISSEMINATION DIRECTLY, OR INDIRECTLY, IN WHOLE OR IN PART, IN OR INTO
Kay Deposit
- Within the Kay deposit, drill hole KM-25-195 intersected 22.4 m @ 1.1% CuEq in a shallow portion of the deposit where the MRE indicated that additional drilling was warranted (Figure 1). This drill hole proved continuity in this area of the deposit, which has the potential to add additional tonnage.
- KM-25-190 intersected 2.4 m @ 0.7% CuEq along the northern extension of the Kay mineralized horizon (Figure 2).
Northwest Target
- On the Northwest target, drill hole KM-25-197 intersected 0.3 m @ 0.9% CuEq. This hole was drilled to the east from Pad 15, into a previously untested portion of the prospective horizon on the property. It targeted a surface sample within a mapped mineral horizon that returned 3.2% Cu (Figure 3). Although narrow, this is an encouraging result in an unexplored area of the property.
The Company is fully funded and on track to deliver a Preliminary Economic Assessment ("PEA") for its
Additionally, assays are pending for six drill holes from the Company's 5,000-meter reverse circulation drilling at the
Table 1. Results of Phase 3 Drill Program at the
|
|
|
|
|
Analyzed Grade |
Analyzed Metal |
Metal Equivalent |
||||||||
|
Hole ID |
From |
To m |
Length |
Cu |
Au |
Zn |
Ag |
Pb |
CuEq |
AuEq |
ZnEq |
CuEq |
AuEq |
ZnEq |
|
KM-25-189 |
no significant assays |
|
|
|
|
|
|
|
|
|
|
|
||
|
KM-25-190 |
212.0 |
212.6 |
0.6 |
0.16 |
0.01 |
1.76 |
1.0 |
0.00 |
0.85 |
1.39 |
2.21 |
0.78 |
1.28 |
2.03 |
|
KM-25-190 |
272.2 |
274.6 |
2.4 |
0.70 |
0.01 |
0.04 |
3.1 |
0.01 |
0.74 |
1.22 |
1.93 |
0.68 |
1.12 |
1.78 |
|
KM-25-191 |
no significant assays |
|
|
|
|
|
|
|
|
|
|
|
||
|
KM-25-192 |
no significant assays |
|
|
|
|
|
|
|
|
|
|
|
||
|
KM-25-193 |
hole lost short of target |
|
|
|
|
|
|
|
|
|
|
|
||
|
KM-25-194 |
no significant assays |
|
|
|
|
|
|
|
|
|
|
|
||
|
KM-25-195 |
265.3 |
287.7 |
22.4 |
0.56 |
0.41 |
0.99 |
5.1 |
0.07 |
1.24 |
2.04 |
3.23 |
1.08 |
1.78 |
2.82 |
|
KM-25-196 |
no significant assays |
|
|
|
|
|
|
|
|
|
|
|
||
|
KM-25-197 |
408.6 |
408.9 |
0.3 |
0.27 |
0.90 |
0.44 |
9.0 |
0.02 |
1.07 |
1.75 |
2.78 |
0.85 |
1.39 |
2.21 |
|
KM-25-198 |
no significant assays |
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
The true width of mineralization is estimated to be 50% to 99% of reported core width, with an average of 76%. (2) Assumptions used in USD for the copper and gold metal equivalent calculations were metal prices of |
|
|
About
The Company also owns 100% of the Sugarloaf Peak Project, in La Paz County, which is located on 4,400 acres of BLM claims. The Sugarloaf Peak Project is a heap-leach, open-pit target and has a historic estimate of "100 million tons containing 1.5 million ounces gold" at a grade of 0.5 g/t (Dausinger, N.E., 1983, Phase 1 Drill Program and Evaluation of Gold-Silver Potential,
The historic estimate at the
Qualified Person and Quality Assurance/Quality Control
All of
Gold content was determined by fire assay of a 30-gram charge with ICP finish (ALS method Au-AA23). Silver and 32 other elements were analyzed by ICP methods with four-acid digestion (ALS method ME-ICP61a). Over-limit samples for Au, Ag, Cu, and Zn were determined by ore-grade analyses Au-GRA21, Ag-OG62, Cu-OG62, and Zn-OG62, respectively.
The qualified person who reviewed and approved the technical disclosure in this release is
Disclaimer
This press release contains statements that constitute "forward-looking information" (collectively, "forward-looking statements") within the meaning of the applicable Canadian securities legislation. All statements, other than statements of historical fact, are forward-looking statements and are based on expectations, estimates and projections as at the date of this news release. Any statement that discusses predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as "expects", or "does not expect", "is expected", "anticipates" or "does not anticipate", "plans", "budget", "scheduled", "forecasts", "estimates", "believes" or "intends" or variations of such words and phrases or stating that certain actions, events or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) are not statements of historical fact and may be forward-looking statements. Forward-looking statements contained in this press release include, without limitation, statements regarding the expansion potential of the
THE
SOURCE