i-80 Gold Reports High-Grade Assay Results at Archimedes Underground Project Including 24.6 g/t Au Over 23.6 Meters; Development Advancing on Schedule
The Company commenced construction of Archimedes, the Company's second underground project, in the third quarter of 2025. Material from Archimedes, in addition to
As of
These drilling results confirm previously interpreted mineralization in the upper 426 zone ("Upper Archimedes") and demonstrate continuity as well as the potential to extend mineralization beyond the boundaries defined by the mineral resource estimate supporting the preliminary economic assessment for Archimedes, prepared in accordance with NI 43-101, and the corresponding Initial Assessment, prepared under Subpart 1300 of Regulation S-K ("S-K 1300"), each filed on
Highlights From Infill Holes at Upper Archimedes
- 24.6 g/t Au over 23.6 m in hole iAU26-05 (sulfide)
- 10.2 g/t Au over 36.4 m in hole iAU25-09 (sulfide)
- 8.0 g/t Au over 46.4 m in hole iAU26-01 (sulfide-oxide)
- 6.1 g/t Au over 42.1 m in hole iAU25-14 (oxide)
- 3.9 g/t Au over 44.3 m in hole iAU26-03 (oxide)
|
True widths are estimated between approximately 40% - 65% of core width. |
"Drilling continues to return consistent and positive results that are improving our confidence in both the scale and continuity of mineralization at Archimedes," stated
Upper Archimedes Drilling
Infill drilling commenced in the fourth quarter of 2025 with a focus on further delineating Upper Archimedes in preparation for the anticipated extraction of mineralized material in the third quarter of 2026. A total of 7,500 meters over 35 holes have been drilled to date, largely completing the 2025-2026 program. New assay results from the first 20 holes presented in Table 1 below continue to demonstrate high-grade mineralization throughout Upper Archimedes, returning high-grade intercepts in targeted drill areas, which are consistent with the current geological model (see Figures 3 and 4 in Appendix). Upper Archimedes drilling will ultimately consist of 36 holes and is expected to be completed in the second quarter of 2026. Results from this program, in conjunction with further drilling in 2026, will be used to support stope design for planned mining activities.
The current drilling program intersected substantial intervals of oxide mineralization that were not included in the 2025 PEA. In light of the current gold price environment and the presence of an operating heap leach pad, the Company is currently evaluating the potential to integrate this oxide material into the Project's mine plan and production profile.
Development of an exploration drift to serve as a platform to drill
Drilling results from both Upper and
Development at Archimedes Advancing on Schedule
At Upper Archimedes, permitting for mining is complete and construction continues to advance on schedule with the development footage exceeding plan. Approximately 1,200 meters of development for the project has been completed as of the end of the first quarter of 2026. Project costs are largely in line with budget expectations. Predictive groundwater models for Archimedes have advanced, including the installation of an additional dewatering well in the first quarter of 2026. The Company continues to expect to mine first gold within Upper Archimedes in the third quarter of 2026.
Permitting activities for
Results from the PEA outlined an approximate 10-year mine life with an average annual gold output of approximately 100,000 ounces, following production ramp up(2) (to view the announcement, click here).
Table 1: Assay Results From Upper Archimedes Drilling
|
Drillhole ID |
Type |
Oxidation |
From (m) |
To (m) |
Length (m) |
Au (g/t) |
|
iAU25-01 |
Core |
Sulfide |
151.2 |
156.0 |
4.8 |
5.6 |
|
And |
Core |
Sulfide |
189.9 |
192.8 |
2.9 |
9.2 |
|
And |
Core |
Oxide |
195.4 |
223.7 |
28.3 |
6.6 |
|
iAU25-02 |
Core |
Sulfide |
129.7 |
148.7 |
19.0 |
7.0 |
|
And |
Core |
Sulfide |
157.9 |
171.6 |
13.7 |
6.9 |
|
And |
Core |
Oxide |
171.6 |
192.9 |
21.3 |
4.1 |
|
iAU25-03 |
Core |
Sulfide |
108.8 |
119.5 |
10.7 |
5.4 |
|
And |
Core |
Sulfide |
154.7 |
161.6 |
6.9 |
10.3 |
|
iAU25-04 |
Core |
Sulfide |
153.3 |
162.5 |
9.1 |
14.0 |
|
And |
Core |
Oxide |
197.5 |
212.8 |
15.2 |
2.1 |
|
iAU25-05 |
Core |
Oxide |
139.9 |
155.9 |
16.0 |
2.7 |
|
iAU25-06 |
Core |
Sulfide |
125.9 |
133.2 |
7.3 |
12.7 |
|
And |
Core |
Oxide |
145.1 |
163.8 |
18.7 |
7.3 |
|
iAU25-07 |
Core |
Sulfide |
133.2 |
146.9 |
13.7 |
12.1 |
|
iAU25-08 |
Core |
Sulfide |
132.0 |
146.6 |
14.6 |
9.5 |
|
And |
Core |
Oxide |
170.8 |
194.5 |
23.7 |
3.1 |
|
iAU25-09 |
Core |
Sulfide |
113.7 |
121.1 |
7.4 |
6.0 |
|
And |
Core |
Sulfide |
139.5 |
176.0 |
36.4 |
10.2 |
|
iAU25-10 |
Core |
Sulfide |
121.8 |
124.5 |
2.7 |
4.0 |
|
iAU25-11 |
Core |
Sulfide |
126.7 |
147.2 |
20.4 |
11.0 |
|
And |
Core |
Oxide |
147.2 |
163.4 |
16.2 |
3.3 |
|
iAU25-12 |
Core |
Oxide |
95.4 |
101.3 |
5.9 |
4.3 |
|
And |
Core |
Oxide |
149.4 |
162.2 |
12.8 |
4.4 |
|
iAU25-13 |
Core |
Sulfide |
135.1 |
145.4 |
10.2 |
8.1 |
|
iAU25-14 |
Core |
Sulfide |
104.2 |
119.5 |
15.2 |
9.3 |
|
And |
Core |
Oxide |
129.9 |
172.0 |
42.1 |
6.1 |
|
iAU25-15 |
Core |
Sulfide |
130.8 |
151.5 |
20.7 |
5.3 |
|
And |
Core |
Oxide |
176.0 |
183.9 |
8.0 |
2.5 |
|
iAU26-01 |
Core |
Sulfide/Oxide |
135.0 |
181.4 |
46.4 |
8.0 |
|
Includes |
Core |
Oxide |
151.1 |
171.5 |
20.5 |
5.3 |
|
And |
Core |
Sulfide |
186.5 |
188.9 |
2.4 |
12.8 |
|
iAU26-02 |
Core |
Oxide |
146.3 |
166.1 |
19.8 |
2.3 |
|
iAU26-03 |
Core |
Sulfide |
134.1 |
140.8 |
6.7 |
13.8 |
|
And |
Core |
Oxide |
140.8 |
185.0 |
44.3 |
3.9 |
|
iAU26-04 |
Core |
Sulfide |
104.5 |
111.7 |
7.2 |
10.3 |
|
And |
Core |
Oxide |
130.5 |
168.3 |
37.9 |
2.9 |
|
iAU26-05 |
Core |
Sulfide |
128.2 |
151.8 |
23.6 |
24.6 |
|
And |
Core |
Sulfide |
170.1 |
176.6 |
6.5 |
5.7 |
|
Notes to table above: Numbers may not add due to rounding. True widths are estimated between approximately 40%-65% of core width. |
||||||
Table 2: Drillhole Collar Coordinates
|
UTM |
Drillhole ID |
East (m) |
North (m) |
Elevation (m) |
Azimuth |
Dip |
|
|
iAU25-01 |
587369 |
4375860 |
1774 |
003 |
-44 |
|
iAU25-02 |
587369 |
4375860 |
1774 |
001 |
-51 |
|
|
iAU25-03 |
587355 |
4375820 |
1779 |
324 |
-35 |
|
|
iAU25-04 |
587369 |
4375860 |
1774 |
352 |
-42 |
|
|
iAU25-05 |
587355 |
4375820 |
1779 |
327 |
-31 |
|
|
iAU25-06 |
587369 |
4375860 |
1774 |
350 |
-57 |
|
|
iAU25-07 |
587354 |
4375820 |
1779 |
316 |
-36 |
|
|
iAU25-08 |
587369 |
4375860 |
1774 |
350 |
-50 |
|
|
iAU25-09 |
587354 |
4375820 |
1779 |
315 |
-32 |
|
|
iAU25-10 |
587369 |
4375860 |
1774 |
344 |
-43 |
|
|
iAU25-11 |
587354 |
4375820 |
1779 |
306 |
-36 |
|
|
iAU25-12 |
587368 |
4375860 |
1774 |
331 |
-55 |
|
|
iAU25-13 |
587354 |
4375820 |
1779 |
299 |
-38 |
|
|
iAU25-14 |
587368 |
4375860 |
1774 |
332 |
-59 |
|
|
iAU25-15 |
587354 |
4375820 |
1779 |
297 |
-34 |
|
|
iAU26-01 |
587354 |
4375820 |
1779 |
292 |
-32 |
|
|
iAU26-02 |
587368 |
4375860 |
1774 |
322 |
-46 |
|
|
iAU26-03 |
587354 |
4375820 |
1779 |
290 |
-38 |
|
|
iAU26-04 |
587368 |
4375860 |
1774 |
319 |
-59 |
|
|
iAU26-05 |
587354 |
4375820 |
1779 |
386 |
-30 |
Technical Disclosure and Qualified Persons
The technical information contained in this press release has been prepared under the supervision of, and has been reviewed and approved by
All samples were submitted to MSALABS (MSA) of
For a description of the data verification, assay procedures and the quality assurance program and quality control measures applied by the Company, please see the Company's Annual Report on Form-10K dated
Endnotes
|
(1) |
Notes to the Archimedes Underground Mineral Resource estimate: (1) Underground mineral resources have been estimated at a gold price of |
|
(2) |
A press release titled "i-80 Gold Announces Positive Preliminary Economic Assessment on the |
About
Cautionary Statement Regarding Forward Looking Information
Certain information set forth in this press release, including but not limited to management's assessment of the Company's future plans and operations, expectations regarding the timing, execution and results of the Company's drilling programs, outlook on gold output, the anticipated timing of gold output, project development or technical studies, including completion of the anticipated Archimedes underground feasibility study and the release of its results, the potential for mineral resource conversion and opportunities for expansion, management's view on the potential to incorporate Archimedes oxide mineralized material into the Project's mine plan to provide meaningful low-cost economic ounces in the near-term, the timing of first gold mined and first gold pour, and the timing of Archimedes and
This release also contains references to estimates of mineral resources. The estimation of mineral resources is inherently uncertain and involves subjective judgments about many relevant factors. Mineral resources that are not mineral reserves do not have demonstrated economic viability. The accuracy of any such estimates is a function of the quantity and quality of available data, and of the assumptions made and judgments used in engineering and geological interpretation (including estimated future production from the Project, the anticipated tonnages and grades that will be mined and the estimated level of recovery that will be realized), which may prove to be unreliable and depend, to a certain extent, upon the analysis of drilling results and statistical inferences that may ultimately prove to be inaccurate. Mineral resource estimates may have to be re-estimated based on: (i) fluctuations in commodities prices; (ii) results of drilling, (iii) metallurgical testing and other studies; (iv) proposed mining operations, including dilution; (v) the evaluation of mine plans subsequent to the date of any estimates; and (vi) the possible failure to receive required permits, approvals and licenses or changes to existing mining licenses.
Please see "Risks Factors" in the Form 10-K for the fiscal year ended
Additional information relating to
APPENDIX
Figure 1: Regional Map of i-80 Gold Assets in
Figure 2: Upper and Lower Mineralized Zones, Archimedes Underground
Figure 3: Plan View of Archimedes Underground
Figure 4: Upper Archimedes Cross-Section
View original content to download multimedia:https://www.prnewswire.com/news-releases/i-80-gold-reports-high-grade-assay-results-at-archimedes-underground-project-including-24-6-gt-au-over-23-6-meters-development-advancing-on-schedule-302736889.html
SOURCE