- POWER METALS' WORLD-CLASS CESIUM RESULTS CONTINUE TO GROW AT CASE LAKE
- POWER METALS PROVIDES UPDATE ON CASE LAKE AND SETS STAGE FOR SUMMER WORK PROGRAM
- Adina Mineral Resource increase 33% to 78Mt at 1.15% Li2O with 79% Indicated
- POWER METALS DEFINES WORLD-CLASS CESIUM RESULTS UP TO 18.13% AT CASE LAKE
- POWER METALS TO CONDUCT FIELD PROGRAM THIS SUMMER AT DECELLES AND MAZERAC IN COLLABIRATION WITH WINSOME RESOURCES
More ▼
Key statistics
On Wednesday, Power Metals Corp (PWRMF:QBB) closed at 0.1938, 30.56% above the 52 week low of 0.1484 set on Feb 05, 2024.
52-week range
Short selling activityProvided by S&P Global Market Intelligence
Open | 0.1931 |
---|---|
High | 0.1938 |
Low | 0.1931 |
Bid | -- |
Offer | -- |
Previous close | 0.1937 |
Average volume | 116.90k |
---|---|
Shares outstanding | 148.03m |
Free float | 145.15m |
P/E (TTM) | -- |
Market cap | 39.23m CAD |
EPS (TTM) | -0.0201 CAD |
Data delayed at least 15 minutes, as of Jul 03 2024 17:14 BST.
More ▼